LBDS Kicker Procedures 11/2015 24 Nov 20151 LHC interventionActivityStatusEDMS # MKD SwitchRemplacement d’un interrupteur MKD HT + ‘check list’ Wait 1501808.

Slides:



Advertisements
Similar presentations
MKDV switch faults November V. Mertens L. Ducimetière with H. Bartosik, G. Bellotto, C. Boucly, P. Burkel, E. Carlier, D. Comte, S. Huon,
Advertisements

Etienne CARLIER AB/BT/EC
N. Voumard, AB-BT-EC LBDS Audit, CERN LBDS Trigger Signal Distribution Trigger Synchronization Unit (TSU) Trigger Fan Out (TFO) Power Trigger Unit.
LHC Beam Dumping system
1 MKBH Erratic Jan Uythoven On behalf of the ABT team (Viliam, Nicolas M., Etienne, Laurent, Francesco etc…..) MPP meeting 8/5/2015.
Failure mode impact studies and LV system commissioning tests
MULTIPLES OF 2 By Preston, Lincoln and Blake. 2 X 1 =2 XX 2X1=2 1+1=2.
LBDS Kicker Electronic and Slow Control Etienne CARLIER AB/BT/EC.
LBDS commissioning – MKD tests Viliam Senaj, 11/12/2013.
Solid-state based 60 kV 15 kA switch for the SPS vertical beam dumping kicker magnet L. Ducimetière, P. Faure, V. Senaj.
Prime Factors. What are they? All composite numbers can be written as the product of prime numbers. This product is known as the prime factorisation of.
Proposed LHC beam dumping kicker generator modifications for LS2 TE-TM Meeting Viliam Senaj 07/07/2015.
Ch 8: Exponents A) Product & Power Properties Objective: To recognize the properties of exponents and use them to simplify expressions.
Lesson #3- Exponent Laws
LHC Beam Dumping System Status and Readiness for LHC Run II Evian Workshop 2-4 June 2014 Nicolas Magnin – TE/ABT/EC On behalf of TE/ABT team. Thanks to.
1 LBDS Testing Before Operation Jan Uythoven (AB/BT) Based on the work of many people in the KSL, EC and TL sections.
LBDS Power Triggering Etienne CARLIER & Jean-Louis BRETIN AB/BT/EC.
LBDS overview on system analysis and design upgrades during LS1 Roberto Filippini, Etienne Carlier, Nicolas Magnin, Jan Uythoven CERN Workshop Machine.
LBDS Audit Follow-up Jan Uythoven Thanks to: Etienne Carlier and Brennan Goddard 1.
MKI Erratics: Hardware and Electronics Related Aspects M.J. Barnes Acknowledgements: A.Antoine, R.A. Barlow, P. Burkel, E. Carlier, N. Magnin, V. Mertens.
Kicker generator and controls installation in ECA5? Etienne CARLIER
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.
MKD Reliability run Viliam Senaj TCM meeting 18/11/2014.
MKD dust related actions Viliam Senaj Technical Coordination Meeting 27/01/2015.
LMC 27 November 2013 Status of LBDS LS1 activities and plans for 2014 reliability run Jan Uythoven for the many, many people working on the mentioned equipment.
LHC Beam Dumping System Experience from reliability run and Re-commissioning procedures MPP Nicolas Magnin – TE/ABT/EC.
Scrubbing Run: TDI, MKI and MKE interlocks Chiara Bracco, Jan Uythoven ABT/BTP Acknowledgments: T. Baer, M. Barnes, E. Carlier.
6.1 - Polynomials. Monomial Monomial – 1 term Monomial – 1 term; a variable.
8.4 Multiply and Divide Rational Expressions
FHCT SEB cross-section measurements at H4IRRAD and consequences for MKD reliability Viliam Senaj LIBD meeting 24/01/2012.
MTE: Statistics of kickers faults Etienne Carlier, Luis Feliciano, Laurent Ducimetière, Brennan Goddard, Luc Sermeus 1 19 October 2015 MTE internal review.
FCC related MDs. Faster LHC ramp MD Brennan Goddard; Matteo Solfaroli Camillocci; Wolfgang Bartmann; Florian Burkart; Francesco Maria Velotti; Mike Lamont;
Planned activities during (E)YETS… up to LS2 for PSB-PS equipment Etienne CARLIER On behalf of TE/ABT/EC.
LBDS YETS activity report Viliam Senaj MKD meeting, 19/01/2016.
Reliability Analysis of the LHC Beam Dumping System Taking Into Account the Operational Experience during LHC Run 1 Roberto Filippini CERN ATS Seminar,
Brennan Goddard, Malika Meddahi
ABT-EC EYETS Activities 2nd reports
Data providers Volume & Type of Analysis Kickers
LBDS TSU & AS-I failure report (Sept. 2016)
Dependability Requirements of the LBDS and their Design Implications
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Fast retrigger path What threshold level we need for the fast trigger path?
Proposition of MKD & MKBH modification with the goal to reduce maximum voltage (and risk of erratic) Viliam Senaj, 05/05/2017.
LHC beam dump 7.56 TeV operation
Outcome LBDS Dry Run – week 7
LHC Beam Dumping System Reliability Run Summary
EC Activities Status for the LIU
MKD/MKB Review Meeting Scope and Definition
Jan Uythoven For discussion
prepared by R.A.Barlow 30/056/2016
TE-ABT PLC and SCADA usage
J. Uythoven for the MPE-MI & MS Teams
LHC Risk Review: Kicker Magnet Reliability
Overview of LBDS related tasks
Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.
TCM PS – SPS Thyratron Power Trigger Consolidation
Special Magnets Controls
Simplify 2m( 3 2 m+1)+3( 5 3 m-2) A.)3m2+5m-1 B.) 3 4 m m-6 C.) 3m2+7m-6 D.) 3 4 m m-1.
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
מיחזור במערכת החינוך.
©2009 – Not to be sold/Free to use
©2009 – Not to be sold/Free to use
LINGO LAB 4.
xxxxxx Jeopardy XXXX XXXX XXXX XXXX
Jan Uythoven For the LBDS Team
Saturday 24 September 2011.
Acknowledgements: Alain Antoine, Nicolas Magnin & Volker Mertens
Saturday 10:00: Cryo Pt8 back, starting the pre-cycle.
Status of the retriggering boxes and measurements
Presentation transcript:

LBDS Kicker Procedures 11/ Nov LHC interventionActivityStatusEDMS # MKD SwitchRemplacement d’un interrupteur MKD HT + ‘check list’ Wait MKD, MKBH/V Generator Remplacement d’un générateur MKD / MKBH / MKBV 2nd MKD GeneratorProcédure de nettoyage d’un gén. MKD + L2nd MKD MagnetRemplacement d’une boite d’entrée MKD MKBH SwitchRemplacement d’un interrupteur MKBH HT + LAppro MKBV SwitchRemplacement d’un interrupteur MKBV HT + LAppro MKBH GeneratorProcédure de nettoyage d’un gén. MKBH + LWait MKBV GeneratorProcédure de nettoyage d’un gén. MKBV + LWait Approval list: Brennan Goddard; Viliam Senaj; Laurent Ducimetiere; Etienne Carlier; Jan Uythoven; Mike Barnes; Nicolas Voumard; Alain Antoine; Nicolas Magnin; Rodolphe Rosol, Tobias Stadlbauer; Stephane Huon;

LBDS Kicker Procedures 11/ Nov LHC interventionActivityStatusEDMS # MKD GeneratorGeneral (AA procedure) Slow control by PLC Global follow-up in AccTest Simplified version for switch exchange Done MKD GeneratorReplacement Power Trigger Unit Principal Power Supply Overshoot/Compensation Power Supply MKD GeneratorSpecial intervention Triggering cable replacement Discharge switch intervention LBDSRe-commissioning after LS (xYETS) Re-triggering lines validation Triggering validation TSU validation

3 LHC interventionActivity Viliam Senaj Tobias Stadlbauer Stéphane Huon Peter Burkel Denis Comte Hassan Zaami Anthony Ducret MKD SwitchRemplacement interrupteur XXX X XXX MKD GeneratorRemplacement générateur XXXX MKD GeneratorNettoyage générateur XXXX MKD MagnetRemplacement boite d’entréeX XX MKBH SwitchRemplacement interrupteur XXXXXX MKBV SwitchRemplacement interrupteur XXXXXX MKBH/V GeneratorRemplacement générateur XXXX MKBH GeneratorNettoyage générateur MKBH XXXXXX MKBV GeneratorNettoyage générateur MKBV XXXXXX LBDS List of competences 10/ Nov 2015