Sprint 177 Review / Sprint 178 Planning Feb 8 th – Feb 22 nd 2016 – s177.

Slides:



Advertisements
Similar presentations
Efforts to Strengthen Healthcare Communities Dr. Lauren Thompson, Director December 13, 2012 The Federal Health Architecture.
Advertisements

September 12, 2013 Glenwood-Lynwood Public Library District.
PaperCut NG Chris Dance. Copyright © PaperCut Software Pty. Ltd. 2 Overview Overview of PaperCut NG Why we offer a Mac Version The story of our.
SAIC-F QA Internal Process (DRAFT ) Sudha Chudamani QA Team, Frederick National Lab Jan 2, 2013.
© 2009 GroundWork Open Source, Inc. PROPRIETARY INFORMATION: Information contained herein is not for use or disclosure outside of GroundWork Open Source,
CONNECT Deep Dive July 16 th Goals and Focus Areas Goals –Provide a detailed view of CONNECT and its benefits –Explain how CONNECT capabilities.
Exchange Network Node Help Desk NOLA Conference Feb 9-10, 2004.
CONNECT 4.0 Technical Deep Dive February 19, 2013.
9/10/20151 Hyperion Enterprise 6.5 New Features & Functionality Robert Cybulski, CPA Finit Solutions.
Sprint 114 Review / Sprint 115 Planning August 26th, 2013.
Sprint 99 Review / Sprint 100 Planning January 28, 2013.
What’s new in Stack 3.2 Michael Youngstrom. Disclaimer This IS a presentation – So sit back and relax Please ask questions.
Trade Software Developer Technical Seminar Document Imaging System March 7, 2012.
CONNECT Roadmap Updated version after June 27 th, 2013 Requirements and Prioritization Meeting 1.
CONNECT: Install Webinar for Code-A-Thon April 20th, 2010.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
CONNECT: Install Webinar for Code-A-Thon September 7 th, 2010.
Sprint 104 Review / Sprint 105 Planning April 8, 2013.
© Copyright 2011, Alembic Foundation. All Rights Reserved. Aurion: Health Information Exchange Technology Today Alembic Foundation OSCON 2011 July 27,
Sprint 112 Review / Sprint 113 Planning July 29 th, 2013.
Statistics Monitor of SPMSII Warrior Team Pu Su Heng Tan Kening Zhang.
CONNECT Roadmap Draft version as of February 4 th,
Enhancements to FasTrak PR Project Update Retail Market Subcommittee November 8, 2006 Adam Martinez Mgr, Market Operations DPO.
Sprint 103 Review / Sprint 104 Planning March 25, 2013.
Sprint 115 Review / Sprint 116 Planning September 9th, 2013.
Sprint 158 Review / Sprint 159 Planning May 18 th – June 1 st 2015.
MONDAY, 4:00 – 4:20PM and TUESDAY, 5:00 – 5:30PM Brian Behlendorf CONNECT Collaboration Advisor (Contractor) Federal Health Architecture, Office of the.
Sprint 101 Review / Sprint 102 Planning February 25, 2013.
Sprint 110 Review / Sprint 111 Planning July 1 st, 2013.
0 eCPIC Admin Training: OMB Submission Packages and Annual Submissions These training materials are owned by the Federal Government. They can be used or.
Sprint 102 Review / Sprint 103 Planning March 11, 2013.
ARIP Technical Committee Convener Call 07 April
Sprint 106 Review / Sprint 107 Planning May 06, 2013.
Sprint 108 Review / Sprint 109 Planning June 3 rd, 2013.
Mariann Yeager, NHIN Policy and Governance Lead (Contractor) Office of the National Coordinator for Health IT David Riley, CONNECT Lead (Contractor) Federal.
Sprint 169 Review / Sprint 170 Planning Oct 19 th – Nov 2 nd 2015 – s169.
Sprint 116 Review / Sprint 117 Planning September 23th, 2013.
Sprint 105 Review / Sprint 106 Planning April 22, 2013.
Sprint 107 Review / Sprint 108 Planning May 20, 2013.
Sprint 170 Review / Sprint 171 Planning Nov 2 nd – Nov 16 th 2015 – s170.
CONNECT CCB Meeting May 16, Balancing current + future needs CONNECT needs to support the current 2012 production and operational needs of the Federal.
Sprint 174 Review / Sprint 175 Planning Dec 28 th – Jan 11 th 2016 – s174.
Sprint 113 Review / Sprint 114 Planning August 12th, 2013.
Sprint 175 Review / Sprint 176 Planning Jan 11 th – Jan 25 th 2016 – s175.
Sprint 173 Review / Sprint 174 Planning Dec 14 th – Dec 28 th 2015 – s173.
A leap ahead... Darren Kearney Don Miller Ilya Pinchuk.
CACI Proprietary Information | Date 1 PD² SR13 Client Upgrade Name: Semarria Rosemond Title: Systems Analyst, Lead Date: December 8, 2011.
CIIMS Proposal for TOP-003 Approach Stacen Tyskiewicz WECC CIIMS Chair March 22, 2016.
Quarterly Geo/SIG Coordinator Webinar June 25, 2014.
CONNECT Architecture (Versions 2.3 and 2.4) Cross Community Patient Discovery (XCPD) and XDR Overview MONDAY, 2:00 – 2:00PM Greg Fairnak, CONNECT Chief.
Release 4.7 Review Sep 8th Sprint Resource Pages For past sprint, visit: NHINProgress/Sprint+191+Progress+Summary.
Sprint 189 Review / Sprint 190 Planning Jul 25 th –Aug 8 th 2016 – s189.
eduroam-as-a-service
How to complete and submit a Final Report through
Architecture Review 10/11/2004
Microsoft Certification Paths
Project Center Use Cases
ACE Presentation for Industry
Overview – SOE PatchTT November 2015.
Project Center Use Cases
CIIMS Proposal for TOP-003 Approach
Introduction of Week 3 Assignment Discussion
E-NOTIFY and CAER OnLine Training
SharePoint Administrative Communications Planning: Dynamic User Notifications for Upgrades, Migrations, Testing, … Presented by Robert Freeman (
ONC P2 FHIR Ecosystem Task Force
Avatar ICD-10 Upgrade and Enhancements Project
Microsoft Certification Paths
Concurrent Versions System
Akraino Sub-Committees
Presentation transcript:

Sprint 177 Review / Sprint 178 Planning Feb 8 th – Feb 22 nd 2016 – s177

Sprint Resource Pages For past sprint, visit: NHINProgress/Sprint+177+Progress+Summary NHINProgress/Sprint+177+Progress+Summary For next sprint, visit: NHINProgress/Sprint+178+Progress+Summary NHINProgress/Sprint+178+Progress+Summary For complete information on the CONNECT 4.5 release visit: CONNECT4/CONNECT CONNECT4/CONNECT+4.5 2

Sprint 177 Summary 3 Points completed in sprint (velocity) = 22

Sprint Development 4.6 RC1 – Tag created –Upgraded to Xalan jar – to fix High OWASP Dependency Check finding –Uploaded Common Types and Connect Web Services binaries to maven repo –Submitted RC1 for SCQC review ECT4/Fortify+Scan+Documentation (DRAFT) ECT4/Fortify+Scan+Documentation ECT4/SonarQube+Scan+Analysis(DRAFT) ECT4/SonarQube+Scan+Analysis –Updated CONNECT copyright to

Sprint Development 4.6 Release Testing (In progress) –Updated Release Test Plan NECT4/4.6+Test+Plan+and+Release+Testinghttps://connectopensource.atlassian.net/wiki/display/CON NECT4/4.6+Test+Plan+and+Release+Testing –Performance Testing Draft documentation – plan, test configuration: Aw Aw 5

Sprint Development Audit logging for spec compliance feature summary –Scope - PD, QD, RD, DS and X12 auditing at gateway –System Administration Module /Audit viewer (search & view) –Auditing requirements, Audit viewer requirementsAuditing requirementsAudit viewer requirements –Audit design including ATNA message, Audit viewer designAudit design including ATNA messageAudit viewer design –Updated regression scripts - Pass-through, StandardPass-throughStandard 6

Sprint Partner/Community Support RC1 patch for SSA and DOD –SSA Setting up CONNECT 4.5 in test WAS environment(CONN-1625 Resolved) –Access denied error, proxy issue Identified issue as 3 jars missing in CXF unbundle. –Release patch RC1 provided to SSA included the jars below cxf-tools-wsdlto-frontend-jaxws cxf-tools-common cxf-tools-wsdlto-frontend-jaxws –SSA successfully validated the patch DoD 4.5 requires internet access which was not the case in 4.3 and 4.4 (CONN-1632 Resolved) –Fix identified to be the same as that needed for SSA. –Release patch RC1 provided to DOD 7

Sprint 177- Partner/Community Support eHealth Exchange –NPE/Category Bag (CONN-1628)- see specifications.wikispaces.com/share/view/ http://exchange- specifications.wikispaces.com/share/view/ –CategoryBag node SHOULD be present for all entries in both the validation/production UDDI Forums – OrionHealth->VA –Presence of nullFlavor causing issues -> queryByParameter is not sent in PD response nullFlavor-causing-issues-tc html 8

Sprint Proposed Themes Development / Community Support Sprint 178 themes –Create 4.6 RC2 Admin GUI UI updates Cross Gateway Query Client bug QD Fan-out regression test update –Regression Testing –Interoperability testing –External testing –NIST/DIL –Partner/Community support 9

CONNECT 4 - Partner and Community Support Current Partner Contacts ( Partners please validate) 10 AgencyAgency POCs DoD Lauren Thompson Monica Farah-Stapleton Crystal Baum John Keane (SCQC Team) Sean Miller (Dev Mgr, ManTech) Steven Phillips (Dev Mgr, ManTech) VA Elaine Hunolt Margaret Donohue David Seitz Todd Turner Del Johnson Dick Rickard CMS Melanie Combs-Dyer Elaine Wigginton Walter Dill Walden D. Byers(CMS/OIS) Aaron Walters (CMS/OFM) SSA Marty Prahl Kitt Winter Tom Davidson Dave Arvin

CONNECT 4 - Partner and Community Support Current Partner Supported Platforms in production 11 AgencyCONNECT VersionJVM Application Server Server Platform DoD JBoss 6.2 Red Hat Linux version bit VA WebLogic Red Hat Linux version bit CMS WebSphere 8.5Solaris Sparc 10 and x86 SSA WebSphere 8.5Sun Solaris Sparc 10

CONNECT 4 - Partner and Community Support Supported application servers WebLogic WebSphere 8.5 Supported product versions Jboss AS WildFly 8.x --- Open source application server 12

CONNECT 4 Community Announcements CONNECT Awareness – Open sprint review and planning updates Look for Sprint Summaries ss/Progress+Summary+Page ss/Progress+Summary+Page Ask questions and participate in discussions on the CONNECT forums – CONNECT 4 Blogs and Forum posts – CONNECT CONNECT CONNECT

CONNECT 4 Custodial Agent and Community Support Ongoing Product Backlog work, CCB and CONNECT Roadmap Updates –Finalized as of March 31st Top focus to be on projects that facilitates implementation, exchange partner testing/onboarding and lower operational burden The Roadmap can be found on the CONNECT wiki: CONNECT 2015 RoadmapCONNECT 2015 Roadmap Product Backlog –JIRA Product BacklogJIRA Product Backlog 14

Questions or Discussions? 15

FHA Overview Established by the Office of Management and Budget as an E- Government Line of Business (LoB) Initiative Supports federal activities related to the development and adoption of health IT standards and policies Ensures that federal agencies seamlessly and securely exchange health data with other agencies, government entities, and with other public and private organizations 16

Stay Connected, Communicate and Collaborate Find out more about FHA on the ONC website: Schedule a meeting with me or send me your thoughts at: Subscribe, watch, Federal Health Architecture 17

Backup Slides 18

CONNECT 4 - WildFly Open source application server – WildFly –Product team to use WildFly as development app server – WIKI/Community+Application+Server+Migrationhttps://connectopensource.atlassian.net/wiki/display/CONNECT WIKI/Community+Application+Server+Migration –Oracle announced sun setting commercial support for future major releases of GlassFish Server –WildFly is an open source Application server ( JBoss Community version) One federal partner (DoD) already testing with JBoss for future upgrade FIPS configurable implementation Strong community and Red Hat support Clear support path from JBoss WildFly to EAP (Commercial version) Ease of installation, configuring, and upgrade 19

CONNECT 4 – WildFly Open source application server – WildFly Development and new feature testing will be done on WebLogic, WebSphere, JBoss and WildFly only. Product team’s regression testing will be executed on WildFly. Regression/automated environment will be in GlassFish with plans to move to WildFly in the near future. Installation testing at release time will be done on GlassFish for one more release to provide time for the community to make any changes. Federal partners are encouraged to communicate with their trading partners about switching to WildFly to avail of new features in future and also to become aware of ‘Oracle/GlassFish sun-setting support’ announcements. 20

CONNECT - Partner/Community Support CONNECT is now an eHealth Exchange Validated System (Dec 2015) overview/ehealth-exchange-validated-productshttp://sequoiaproject.org/ehealth-exchange/testing- overview/ehealth-exchange-validated-products 21

CONNECT 4 – Planned activities CONNECT – Planned activities until March 2016 –Release 4.6 ( Scheduled for March 18 ) Audit Trail and Node Authentication (ATNA) compliant audit logging across all Gateway services – 95% COMPLETE –Audit Log events for PD, QD, RD, DS and X12 services –Search/view audit events using System Administration Module Performance testing - 50% COMPLETE Release tasks - security and code quality testing, release testing, external compliance validation, documentation - INPROGRESS –eHealth Exchange/Product certification – COMPLETE DEC 2015 –Support Partner / community – installation, upgrades, questions - ONGOING 22

CONNECT 4 – Latest Release 4.5 CONNECT 4.5 released on July 13 Release artifacts for CONNECT 4.5 –Interoperability Testing completed - passed Interoperability Testing results –Installation Testing completed - passed Installation Testing results –Regression Testing completed - passed Regression Testing results –Release notes are herehere –Installation instructions are herehere –Binaries are herehere –Source code is herehere 23