Faculty of Physics, University of Belgrade Collaboration meeting, Dubna 8 th of April, 2014. ToF-LR Upgrade Jovan Puzović, Faculty of Physics, Belgrade.

Slides:



Advertisements
Similar presentations
n-DVCS/E status report
Advertisements

1 TOF Aging Issues Pre-history Operating history Observations related to gain loss Impact on timing resolution Possible courses of action April 6, 2006.
Detector Systems Update MICO March 3, MICE Detector Systems  CKOV u CKOV humidity (HIH4000) and temperature (LM35) sensors in hand for installation.
April 2006Jean-Sébastien GraulichSlide 1 Pmts and Scintillators o Used Material in Geneva - Big Scintillator Slabs + Pmts - XP2972, 1” Pmts + Voltage Divider.
Faculty of Physics, University of Belgrade General meeting 3 rd of June, ToF-L/R Performance Marjan Ćirković, Faculty of Physics, Belgrade.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
1 TOF Aging Discussion Background information Summary of results so far Examples of gain loss mechanisms Diagnostics Possible scenarios for 2006 Discussion.
CALICE Meeting DESY ITEP&MEPhI status report on tile production and R&D activities Michael Danilov ITEP.
P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Performance of the H.E.S.S. cameras Pascal Vincent (LPNHE.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
PSD upgrade: Ar-present and Xe-future 1.- Status of the PSD upgrade 2.- PSD performance after upgrade 3.- Problems during the Ar-run 4.- Future scenarios.
Ondřej Svoboda for the ECAL group HADES collaboration meeting XXV, 19 – 23 November 2012 GSI.
Time of Flight Counter BESIII International Review Sep. 16, 2002 Heng Yuekun
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
Faculty of Physics, University of Belgrade General meeting 19 th of August, ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
Применение MAPD (Zecotek) в адронных калориметрах и многоканальных времяпролетных системах в экспериментах по релятивистской ядерной физике Ф.Ф.Губер,
PANDA FTOF Prototyping Anton A. Izotov, Gatchina
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
T0 status1W.H.Trzaska HIP Jyväskylä Status of T0 project ALICE Comprehensive Review IV March 23, 2004.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
RD51 Group Saha Institute of Nuclear Physics 14 February, 2014
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
BRANs Sune Jakobsen (BE-BI-PM) LHC BI 2015 summary
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Faculty of Physics, University of Belgrade General meeting, 19 th of May, Pixel/Connectors Checking Jovan Puzović, Faculty of Physics, Belgrade.
CDMS II Shielding To Installation To Construction From Design.
Faculty of Physics, University of Belgrade General meeting, Wroclaw 28 th of January, ToF-L/R HV Upgrade, Status and Plans Jovan Puzović, Faculty.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
Development of UV-sensitive MPPC for upgrade of liquid xenon detector in MEG experiment Daisuke Kaneko, on behalf of the MEG Collaboration µ γ Liquid xenon.
The HyCal Calorimeter from PrimEx A. Gasparian NC A&T State University Greensboro, NC.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Faculty of Physics, University of Belgrade Collaboration meeting CERN, 24 th of September 2015 ToF-LR status and future Jovan Puzović, Faculty of Physics,
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, 10 th of October, Remote control and monitoring of ToF-L/R detector Jovan.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
1 SuperB-PID, LNF 4/4/2011 MAPMTsSilvia DALLA TORRE COMPASS experience with HAMAMATSU MAPMTs S. Dalla Torre.
GEM Integrated PCB readout and cooling
HF “Slice test box” installation
PreShower Characterisations
Scintillator testing in Prague (update from Aussois)
Tile Upgrade Workshop (CERN- February 2008, 8 and 9)
LKr status R. Fantechi.
Upgrade activities at Clermont-Ferrand
Experimental Method: 2 independent detectors on both sides of IP
LAV front-end and readout status
Upgrade of the scintillator testing station in Prague
Optoelectronics internal report, 17 August 2007
HF “Slice test box” fabrication and installation
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Preparation for Station Acceptance Test
Status of upgrade works at Clermont-Ferrand
ROBOX modification plans
WP02 PRR: Master Oscillator and RF Reference Distribution
Conceptual design of TOF and beam test results
Pierluigi Paolucci - I.N.F.N. Naples
Department of Physics and Astronomy,
Experimental Method: 2 independent detectors on both sides of IP
The LHCb Front-end Electronics System Status and Future Development
LHC BIF test setup - update
Presentation transcript:

Faculty of Physics, University of Belgrade Collaboration meeting, Dubna 8 th of April, ToF-LR Upgrade Jovan Puzović, Faculty of Physics, Belgrade

Faculty of Physics, University of Belgrade Collaboration meeting, Dubna, Page 2 out of 24 Jovan Puzović, Belgrade SHINE team ToF-LR HV upgrade -Current status: 1) 2 Caen crates (right 1 and 2) replaced with BG crates 2) Both crates connected via RS485 link to computer in counting room 3) Connection established, beta version of monitoring program working well

Faculty of Physics, University of Belgrade Collaboration meeting, Dubna, Page 3 out of 24 Jovan Puzović, Belgrade SHINE team ToF-LR HV upgrade All hardware finished!

Faculty of Physics, University of Belgrade Collaboration meeting, Dubna, Page 4 out of 24 Jovan Puzović, Belgrade SHINE team ToF-LR HV upgrade -Crate R3 already in CERN, wait to be installed, Crate R4 still in Belgrade -All distributors (HV readout) have to be calibrated! -Finishing of the work foreseen for August this year

Faculty of Physics, University of Belgrade Collaboration meeting, Dubna, Page 5 out of 24 Jovan Puzović, Belgrade SHINE team Pixels repair -ToF (especially ToF-L) performance decreases with time, too many pixels on ToF-L out of order, repair needed - Currently, 98 pixels on ToF-L don't work, and 24 on ToF-R (our analysis, based on ToF online monitoring program) - Szymon analysis (pp80, more sophisticated) and our new analysis (pp158, 2009) show even worst situation!

Faculty of Physics, University of Belgrade Collaboration meeting, Dubna, Page 6 out of 24 Jovan Puzović, Belgrade SHINE team ToF-LR pixel efficiency

Faculty of Physics, University of Belgrade Collaboration meeting, Dubna, Page 7 out of 24 Jovan Puzović, Belgrade SHINE team Pixels statistic February 2013, 30 GeV

Faculty of Physics, University of Belgrade Collaboration meeting, Dubna, Page 8 out of 24 Jovan Puzović, Belgrade SHINE team Pixels statistic Left side: 81 dead pixels (9.1%)(~70 PMT!) 17 almost dead (1.9%) not working(11.0%) Right side:20 dead pixels (2.2%)(~16 PMT!) 4 almost dead (0.5%) not working(2.7%)

Faculty of Physics, University of Belgrade Collaboration meeting, Dubna, Page 9 out of 24 Jovan Puzović, Belgrade SHINE team Cassette inspection

Faculty of Physics, University of Belgrade Collaboration meeting, Dubna, Page 10 out of 24 Jovan Puzović, Belgrade SHINE team Broken PMT

Faculty of Physics, University of Belgrade Collaboration meeting, Dubna, Page 11 out of 24 Jovan Puzović, Belgrade SHINE team Spare parts We found some spare PMTs with scintilators 6 cm – 1 pcs(needed ~30) 7 cm – 17 pcs(needed ~30) 8 cm – 25 pcs(needed ~30) pcs(needed ~90) Replacing foreseen for middle of August ( )

Faculty of Physics, University of Belgrade Collaboration meeting, Dubna, Page 12 out of 24 Jovan Puzović, Belgrade SHINE team New parts -FEU-87 doesn’t produce any more -No leftovers in Dubna! -Replacement: Hammamatsu R3478 from Buda wall (~400 pieces with HV voltage dividers, optical coupled with grease, can be use again) -Smaller then FEU, mechanically can be adapted to fit in existing cassette (photocatode 15mm instead of 22!)

Faculty of Physics, University of Belgrade Collaboration meeting, Dubna, Page 13 out of 24 Jovan Puzović, Belgrade SHINE team New parts

Faculty of Physics, University of Belgrade Collaboration meeting, Dubna, Page 14 out of 24 Jovan Puzović, Belgrade SHINE team Hammamatsu PMT -Wavelength (Peak): 420nm -Dynode Stages: 8 (FEU-87 11!) -Anode to Cathode Supply Voltage: 1700V -Max Anode to Cathode Voltage: 1800V -Gain Typ.: 1.7 x Rise Time Typ.: 1.3 ns -Assembled with our ToF-LR scintilators an tested (cosmic) -Nominal HV (1700V) too high (gain too high)! Use ~1000V -More current consumption (~30%) compared to FEU-87!

Faculty of Physics, University of Belgrade Collaboration meeting, Dubna, Page 15 out of 24 Jovan Puzović, Belgrade SHINE team Hammamatsu PMT

Faculty of Physics, University of Belgrade Collaboration meeting, Dubna, Page 16 out of 24 Jovan Puzović, Belgrade SHINE team Hammamatsu PMT

Faculty of Physics, University of Belgrade Collaboration meeting, Dubna, Page 17 out of 24 Jovan Puzović, Belgrade SHINE team PMT from the right wall

Faculty of Physics, University of Belgrade Collaboration meeting, Dubna, Page 18 out of 24 Jovan Puzović, Belgrade SHINE team PMT from the right wall

Faculty of Physics, University of Belgrade Collaboration meeting, Dubna, Page 19 out of 24 Jovan Puzović, Belgrade SHINE team Pulse shape

Faculty of Physics, University of Belgrade Collaboration meeting, Dubna, Page 20 out of 24 Jovan Puzović, Belgrade SHINE team Amplitude spectra

Faculty of Physics, University of Belgrade Collaboration meeting, Dubna, Page 21 out of 24 Jovan Puzović, Belgrade SHINE team Conclusion -Hammamatsu PMTs performed very well during testing (in spite of their smaller photocatode) -Seems that its possible to produce replacement for broken pixels on the ToF left wall based on Hammamatsu PMTs -However, lots of problems are foreseen!

Faculty of Physics, University of Belgrade Collaboration meeting, Dubna, Page 22 out of 24 Jovan Puzović, Belgrade SHINE team Conclusion -A lot of mechanical work needed! - new cassettes have to be produced (12 of them) - new scintilators wanted - electrical cables have to be extended - mechanical support for (smaller) PMTs for tight fit to existing space in cassette - light guides for laser calibration system needed - replacing the old cassette with the new one, then use good FEU-87 pixels as spare part for the rest of the wall - HV calibration needed! - Current consumption?

Faculty of Physics, University of Belgrade Collaboration meeting, Dubna, Page 23 out of 24 Jovan Puzović, Belgrade SHINE team Conclusion -Price (in CHF and man power) cannot be estimate at the moment – mostly for traveling expenses and men work! -Further study needed – how to mechanically adapt smaller PMTs to tight fit in existing cassette space? -Cost-benefit analysis needed: what we will get and how much does it cost!

Faculty of Physics, University of Belgrade Collaboration meeting, Dubna, Page 24 out of 24 Jovan Puzović, Belgrade SHINE team Thank you!