R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October 14-17 th 2014 R2E/Availability Workshop RadWG - Brief.

Slides:



Advertisements
Similar presentations
Will we still see SEEs? (a word trick game) R2E Project Meeting - draft presentation for Chamonix 2012 – 19 th January 2012 M. Calviani (EN/STI) for the.
Advertisements

K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
01 Apr 10 – WDM 204 – Session Three. Cape Area Management Program (CAMP) Sponsored by the Cape & Islands Workforce Investment Board.
© Robert Baumann 3/27/2015 TI Information – Selective Disclosure Slide 1/ Future Circular Colliders Conference © Robert Baumann 3/27/2015 Slide.
Dr. José Miguel JIMENEZ LS2 Coordinator LHC Performance Workshop (Chamonix 2014) Session 8 - Long Shutdown 2 Strategy and Preparation Chair: José Miguel.
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. W. Zeuner, W. Riegler, R. Lindner, B. Di Girolamo, G. Corti, C. Schaeffer,
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. O. Beltramello, G. Corti, B. Di Girolamo, R. Lindner, W. Riegler, C.
J. G. Weisend II Deputy Head of Accelerator Projects April 2, 2014 Actions at ACCSYS Resulting from the Recommendations of the Annual Review.
ATC / ABOC Days – Session 4 – January D. Smekens AT-MCS-MNC 1 MAGNETS FOR SPS & BEAM LINES MTTR & Spare Policy for the LHC Injectors & Exp.
TS, Length of YETS EYETS LIU & CONS Project
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Follow-Ups and Notes. Project News LMC R2E (SEE Events) Update (see link)link RadWG SEE list (link) and Post-Mortem Database (link) synchronizedlink MCWG.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
“Linear collider studies: This heading includes the total funding for CTF3, the CLIC study and the CLIC/ILC collaboration as well as the CERN’s participation.
Preparation of Review R. Assmann et al CWG, CWG R. Assmann.
Nov 28, 2013 Power Converters Availability for post-LS1 LHC TE-EPC-CCE.
R2E Mitigation Project P5 Relocation Options - Discussion R2E Mitigation Project CMS Relocation Options Towards An R2E Baseline 1 M. Brugger for the R2E.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
TRACKING OF FAULTS AND FOLLOW-UP Accelerator Fault Tracking project Jakub Janczyk (TE-MPE-PE / BE-CO-DS) with input from: Andrea Apollonio, Chris Roderick,
CERN Converter Control Electronics Setting the Scene
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Goal: in view of LS2/LS3/HL-LHC – evaluate possible life-time constraints in IR3/7 radiation levels equipment damage and respective lifetime considerations.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
LMC Update - R2E Failures December 5 th 2012 (R2E) Mitigation Project: LMC Update December 5 th 2012 R2E SEE Update M. Brugger on behalf.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
TE-CRG-CE OMP Meeting 06 / 11 / 2014TE-CRG-CE OMP Meeting.
Radiation monitoring: what do we have and what do we need? M. Calviani, M. Brugger, P. Peronnard, J. Saraiva, G. Spiezia (EN/STI) R2E/Availability Workshop.
R2E Mitigation Project Status Report 2 nd R2E Committee Meeting R2E Project Report.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
ALARA REVIEW WORKING GROUP (ARWG) New ALARA recommendations proposed by the ALARA REVIEW WORKING GROUP (ARWG) Heinz Vincke on behalf of ARWG LS1 committee.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Long.
HLTC 28 th June Aim and expected results The aim of the workshop was: To create a CERN wide survey of all needs in the mentioned domain To collect.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
R2E Mitigation Project Review November 21 st – 24 th 2011 Intense program (link)link A few facts/highlights per session/task Calculations & Monitoring.
Mu2e Mu2e Remote Handling Review Comparisons: Costs, Risks & Maintainability Ryan Schultz Deputy L3 Manager Target Station 3/3/2015.
R2E Workshop Preparations RadWG Meeting March 25 th.
Workshop summary Outline  Workshop’s aims  Highlights from the presentations (my selection!)  Costing Exercise – What we learnt  Summary - Roadmap.
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
Follow-Ups and Project Structure R2E Meeting September 8th Project / Study Group / RadWG R2E Mitigation Project:  Responsible of development and implementation.
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
CERN Converter Control Electronics Strategy for LHC Machine Electronics : Limitations & Risks
29 October 2015 B. Di Girolamo. B. Di Girolamo – Collider-Experiments Day – 5 th HiLumi Annual Meeting 2 Collider-Experiments Interactions There is a.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Planning and strategy for HL-LHC R2E
Current Plant Performance
by Fritz Szoncsó CERN HSE
Space Management and Logistics during LS2
The European Strategy for Particle Physics
ASSTAR Oceanic Session Summary
Outline Introduction to LHC Power Converters Remaining Inventory Observed Availability New inventory – FGClite Cumulative & SEE Effects Maintenance.
CMS November Upgrade Week
R2E – Experience and Outlook for LS1
Joint Meeting SPS Upgrade Study Group and SPS Task Force
LS2 LHC forward experiments
the CERN Electrical network protection system
CLIC-ILC BDS & MDI work.
Update on expected HL-LHC radiation levels
Collimator Control (SEUs & R2E Outlook)
RADIATION induced failures in LHC 28th June 2011
R2E LMC Update (Weeks 32/33) Post-Mortem database: SEE analysis and link to existing RadWG list in preparation Shielding block delivery crisis solved:
R2E Follow-Ups and Project
Radiation Working Group RADWG
Presentation transcript:

R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief 1 st Report

R2E/Availability Workshop Report - RadWG October 22 nd 2014 All presentations, summaries are available at: Workshop Details 2

R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop Report - RadWG October 22 nd 2014 Integrated Luminosity at particle colliders

R2E/Availability Workshop Report - RadWG October 22 nd 2014 Aiming for high availability Radiation effects Single Event Errors (SEEs) LS1 focus on mitigation From MITIGATION to PREVENTION Cumulative (long-term) damage (TID, DD) so far not encountered at LHC (experience from injectors!) Equipment failures (focus on electronics components) experience, development needs, options Components reaching the end of life with and without radiation Workshop Goals 4

R2E/Availability Workshop Report - RadWG October 22 nd 2014 Concerns for what to do next, but also in view of 22 years of LHC What needs to be done up to LS2/LS3 and for HL-LHC Radiation damage and intervention concerns in IR3/7 Design/test choices and synergies to be exploited Requirements to reach the HL-LHC target Availability Expertise & Facilities Developments & Qualification Needs Workshop Goals 5

R2E/Availability Workshop Report - RadWG October 22 nd 2014 In view of the 4 Workshop Sessions Session-1: Fundamentals of R2E and Availability Radiation Monitoring & Test Facilities: improve/operate R2E Expertise (LHC, Injectors, Experiments): keep & develop Availability: fault tracking, impact analysis: improve/adopt Needs and Goals 6

R2E/Availability Workshop Report - RadWG October 22 nd 2014 In view of the 4 Workshop Sessions Session-2: Concerned Equipment: up to LS2/LS3/HL-LHC Development needs and R2E requirements: R2E structure? Maintenance and lifetime (with & w/o. rad.): What is known and what needs to be? How to improve availability: What can and has to be done? Needs and Goals 7

R2E/Availability Workshop Report - RadWG October 22 nd 2014 In view of the 4 Workshop Sessions Session-3: IR3/7 Damage/Maintenance Issues Failure risks due to radiation/environment: is there any show-stopper? Needs: monitoring, handling, testing: what is ok and what needs to be improved? Maintenance, life-time & mitigation: what is the equipment requirement/strategy? Needs and Goals 8

R2E/Availability Workshop Report - RadWG October 22 nd 2014 In view of the 4 Workshop Sessions Session-4: Long-term strategy Mitigation/Prevention strategy & needs: are we on the right track? SCL & rad-tol PC options/needs/roadmap: what is the (combined) best strategy? Required developments & synergies: what are and can be common grounds? Needs and Goals 9

R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E LHC Long-Term R2E SEE Failure Analysis ~250 h Downtime Analyze and mitigate all safety relevant cases and limit global impact Focus on long downtimes and shielding LS1 (2013/2014) Final relocation and shielding LS1-LS2 ( ) Tunnel equipment and power converters -> LS3-HL-LHC Tunnel Equipment (Injectors + LHC) + RRs ~400 h Downtime LS1 – LS2 Aiming for <0.5 dumps / fb -1 ~12 dumps / fb -1 ~3 dumps / fb -1 HL-LHC: < 0.1 dumps / fb Relocation & Shielding Equipment Upgrades

R2E/Availability Workshop Report - RadWG October 22 nd R2E LHC Long-Term

R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E: LS1-LS2-LS3-HL-LHC 12

R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop Report - RadWG October 22 nd 2014 Workshop Highlights picking-up on the previous summaries/discussions: Aiming for 4000fb -1 Calculations/Monitoring/Operation/Reporting Facilities/Testing/Support Fault Tracking Tools/Use/Reporting Lifetime issues: identified: (cables, magnets, vacuum) -> + Injectors Interventions: room for further improvement (tooling, robotic, …) Availability: r2e to remain small part, many other things to be addressed -> significant overall improvement needed Long term ‘stock’ of spares required (all critical systems addressed) Many new developments (replacements) required for HL-LHC PC mitigation on-going (FGClite, rad-tol converters) SCL links well advanced (also for global HL-LHC requirements) RRs: not necessarily needed r2e – for other reasons (RP, +?) 13

R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop Report - RadWG October 22 nd 2014 Discussion Points picking-up on the previous summaries/discussions: Feedback of the groups: the preparations were useful they partly directly lead to follow-ups General radiation (damage) needs (not only R2E): LHC + Injectors Testing, Facilities, Monitoring – all there? expertise/support? Possible common needs + synergies: several were pointed-out -> how to make them happen? (PH + A&T!) R2E/Availability: clear needs for both for Run2/3/x -> what is the most effective structure? Outsourcing/qualified components/ ect. -> balanced costs/efforts? Resources: enough / at the right place? List of follow-ups: significant -> how to make sure that it’s ‘followed’? 14

R2E/Availability Workshop Report - RadWG October 22 nd 2014 Feedback Do you have any specific feedback concerning the workshop Report With the session chairs and organizers we’re currently working on the summary and main messages/conclusions This will then be presented to the management (forum, etc. to be defined) Follow-up The identified follow-up actions will be addressed -> through RadWG/R2E-Project/+? Next 15

R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E Project Equipment Groups R2E Organization Break-Down Implement, Support, Coordinate, Develop, Operate, Maintain 16 LHC and Injector Committees (IEFC, LMC) Radiation Working Group RADWG Monitoring & Calculations Working Group MCWG Mitigation: rad-tol developments (+relocation /shielding) Operation Follow-up Rad-Tol Developments Radiation Tests Monitoring & Dosimetry Test Facilities

R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop Report - RadWG October 22 nd 2014 THANK YOU ALL Workshops like this never come in the ‘right’ moment, but still… All presenters and respective people/teams involved did an excellent job and invested a lot of effort – THANK YOU Geraldine Jean and Julia Cachet who helped us all along with the organization of: website, coffee breaks, dinner, conference room, etc. – MANY MANY THANKS The session chairs, workshop organizers and helpers for putting the very intense and efficient program together, as well as keeping all sessions (almost ) within their challenging time limits - CONGRATS CERN management supporting (pushing) for this workshop … and … allowing for the very useful and effective dinner discussions – THANK YOU 17