1 RD51 Kolimpari June 2009 Stéphan AUNE, BULK lab at Saclay.

Slides:



Advertisements
Similar presentations
Results of a R&D Micromegas Bulk Results of a R&D S. Aune a, M. Boyer a, A. Delbart a, R. De Oliveira b, A. Giganon a, Y. Giomataris a A CEA / DAPNIA,
Advertisements

Presentation Group : 2012 v1 Resistive Bulk prototyping at Cirea 15 June CERN Michel Billant 1.
Resistive bulks industrialization Status report 2 OCTOBER 2012 Fabien Jeanneau | PAGE 1 RD51 Collaboration meeting | Stony Brook University | October 2012.
Parallel Ionization Multiplier (PIM) : a multi-stage device using micromeshes for tracking particles MPGD’s Workshop at NIKHEF April 16th2008 April 16th.
Recent achievements and projects in Large MPGDs Rui de Oliveira 21/01/2009 RD51 WG1 workshop.
RD S. Aune CEA/IRFU Micromegas Bulk for CLAS12 vertex tracker.
Presentation Outline Intro to Metamaterials Project Outline Recent Progress Recent Problems The Next Step.
PH-DT Infrastructure Investments M.Capeans SPOB meeting CERN, 20/3/14.
Industrial Production of MPGDs Rui de Oliveira Workshop on neutron detection with MPGD CERN October
Atsuhiko Ochi Kobe University / MAMMA collaboration 24/04/2013 RD51 mini week, WG6.
Atsuhiko Ochi Kobe University 28 August 2012 ATLAS muon chambers R&D on micromegas meeting.
-Stephan AUNE- RD51 Bari 2010 CEA DSM Irfu 08/10/20101 Saclay MPGD workshop.
Status of PNPI R&D for choice of the MUCH tracking base detector (this work is supported by INTAS) ■ Introduction ■ MICROMEGAS ■ GEM ■ MICROMEGAS+GEM ■
WG1 summary P. Colas, S. Duarte Pinto RD51 Collaboration meeting in Bari October 7-10, 2010.
20/04/2012Rui De Oliveira1 20/04/2012. Rui De Oliveira2 30 cm x 30 cm example.
GainEnergy resolution DIRECTION DES SCIENCES DE LA MATIERE LABORATOIRE DE RECHERCHE SUR LES LOIS FONDAMENTALES DE L’UNIVERS CENTRE DE SACLAY Contact :
Zeuthen, January 16, 2008 P. Colas - Micromegas panels1 Micromegas panels Status and plans D. Attié, P. Colas, X. Coppolani, M. Dixit, M. Riallot, F. Sénée,
Situation with industry Rui de Oliveira RD51 CERN October
Quality Control and Quality Assurance for PCB production Fabian Kuger on behalf of the MAMMA Collaboration Julius-Maximilians Universität Würzburg, Germany.
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
Situation with industry
CERN Rui de OliveiraTS-DEM Rui de Oliveira TS-DEM Large size detectors CERN TS-DEM-PMT Capabilities.
CERN workshop upgrade Aida fund Transfer to industry Rui De Oliveira 4/13/20111Rui De Oliveira.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
CERN Workshop upgrade Rui De Oliveira KOBE WG6 WG6 9/1/20111Rui De Oliveira.
The role of innovation for the future of Swiss industrial SME The role of innovation for the future of Swiss industrial SME Laboratoire de gestion et procédés.
CERN workshop upgrade Aida WP 9.2 Rui De Oliveira.
Large area detectors Aida WP 9.2 RD51 WG6
Resistive bulk Micromegas panels for the TPC D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Introduction Status.
GEM foil and Simulation work at CIAE Xiaomei Li Shouyang Hu, Jing Zhou, Chao Shan, Siyu Jian and Shuhua Zhou Science and Technology Science and Technology.
M. Bianco On behalf of the ATLAS Collaboration
Resistive anode studies D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Micromegas Large Prototype panels Studies.
Summary of MM meeting at CEA Saclay, 25/26 Jan 2010 Some selected topics.
Update on THGEMs and Micromegas production for RICH-1 COMPASS Upgrade on behalf of THGEM Trieste group INFN - Sezione di Trieste S . Levorato S. Levorato.
Resistive protections Rui de Oliveira 09/12/15
S. AUNE 15/09/08 Micromegas Bulk for CLAS12 tracker.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #13.
Thin and high-pitch laser-etched mesh manufacturing and bulking" (INFN Bari, CEA Saclay, CERN) RD51 Common Projects V. Berardi, P. Colas, Rui de Oliveira.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
30/09/2010Rui De Oliveira1.  GEM Single mask process  Micromegas  Bulk  Classical  resistive 30/09/2010Rui De Oliveira2.
CERN Rui de OliveiraTS-DEM Rui de Oliveira TS-DEM Large size detectors practical limits based on present knowledge.
CMS Upgrade Workshop, FNAL, Nov 19-21, O.Prokofiev CMS Upgrade Workshop Updated ME4/2 chamber construction costs and prototype Status and plans.
CERN Workshop upgrade status Rui De Oliveira RD51 22/11/2011 WG6 WG6 9/1/20111Rui De Oliveira.
GEM R&D updates from Chinese groups Yuxiang Zhao University of Science and Technology of China May 24,
R&D ON RESISTIVE TECHNOLOGY FOR MICROMEGAS BUKL STEPHAN AUNE 03/06/2015. S.Aune.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
1 Fulvio TESSAROTTO THGEM discussion, 02/11/2009 THGEM production at ELTOS Production of THGEM at ELTOS S.p.A. Company profile Production procedures Small.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
 Large GEM  CMS RE1-1  Kloe  Ns2 ( No stretch No stress)  Large Micromegas  Atlas MAMA project  Large THGEM  Double phase pure argon project 
1 Fulvio TESSAROTTO CERN, 13/11/ COMPASS THGEM meeting Construction of the large size Hybrid Prototype The bulk Micromegas technology Examples of.
Suggestions for a MPGD Workshop in Frascati Rui de Oliveira 1.
Systematic studies for microbulk detectors E. Ferrer Ribas, A. Giganon, Y. Giomataris, FJ Iguaz, T. Papaevangelou (Saclay) A. Gris, R. de Oliveira (CERN)
TPC R3 B R3B – TPC Philippe Legou Krakow, February nd
Large GEM prototype production NS2 technique. Reminder NS2 technic 10 to 15mm Readout connector O-ring Drift electrode Free to slide External screws to.
A High Eta Forward Muon Trigger & Tracking detector for CMS A High Eta Forward Muon Trigger & Tracking detector for CMS Archana Sharma For CMS High Eta.
-Stephan AUNE- RD51 BARI. Saclay MPGD workshop R&D 09/10/20101 Saclay workshop R&D for new Bulk structure.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
Thin and high-pitch laser-etched mesh manufacturing and bulking"
Large volume GEM production Rui De Oliveira TE/MPE/EM
Wisconsin Center for Applied Microelectronics
The principle of operation of a micromegas chamber
GEM and MicroMegas R&D Xiaomei Li Science and Technology
Gaseous detectors Task Resistive anode Micromegas
Large Area Endplate Prototype for the LC TPC
An improved design of R-MSGC
Saclay MPGD workshop.
a TPC with resistive Micromegas
Industrialization of the DLC deposition process
A DLC μRWELL with 2-D Readout
MPGD Experience with Technology Transfer
Presentation transcript:

1 RD51 Kolimpari June 2009 Stéphan AUNE, BULK lab at Saclay

2 RD51 Kolimpari June 2009 Stéphan AUNE, Bulk Saclay lab historic Idea of the bulk by par Ioannis et Rui delivery of the first bulk by CERN, test à Saclay decision to invest in a bulk lab at Saclay (30 K€) first machine arrive at Saclay first realization at Saclay: lack of UV power, exotic and classical realisation Tests de bulks du CERN pour T2K 2007 New machine search, no decision yet New lab decided with professional machine T2K and prototype for several other experiences New lab with professional machine

3 RD51 Kolimpari June 2009 Stéphan AUNE, Old Saclay Bulk lab Created in 2005, it used machine design for technological university for PCB manufacturing. Allowed bulk realization on 30 cm x 30 cm but with: –Low reproduction process –Poor UV illumination = large pillars –Laminator “sometime” made bubble on photoresist film This lab allowed us to familiarize with the bulk technique, to made R&D and prototype for “beginning” experience –Classical gain –Energy resolution around 28 % –Frame on mesh: DE/E= 22%

4 RD51 Kolimpari June 2009 Stéphan AUNE, Old Saclay bulk lab machines Laminator Development unit insulator

5 RD51 Kolimpari June 2009 Stéphan AUNE, Bulk at Saclay in 2005 Typical bulk prototype Bulk on Kapton (200  m) test curved at 650 V (air)

6 RD51 Kolimpari June 2009 Stéphan AUNE, Bulk at Saclay in 2005 (2) Cutting the mesh in a resist wall 100  m Small bulk for industry

7 RD51 Kolimpari June 2009 Stéphan AUNE, New bulk lab started end 2008 Laboratory equipped with professional machine designed for industry: Stretching machine for lithography (2008) Laminator unit (2008) Large oven (2008) Insulator unit (2009) Development unit (2009 ?) Building 546 in Saclay, 64 m 2 of clean room (class ) maximum seize of the bulk: 600 mm x 800 mm. bulk lab will be ready in Cost: Budget R&D bulk 2008 et 2009 : 60 k€ + 20 k€ of safety consumable: 10 k€/year

8 RD51 Kolimpari June 2009 Stéphan AUNE, Mesh stretching machine at Saclay Starting stretching woven mesh allowed us to “see with our hands” the difficulties of uniformity Difficult to obtain better than 4 N/cm uniformity on 30 cm x 30 cm with nominal 12 N/cm. Tools to measure tension on the mesh Understanding of the process Training in stretching to be done in fall 2009 Streching machine: max seize of 1 m x 1m.

9 RD51 Kolimpari June 2009 Stéphan AUNE, First mesh stretched in Saclay (2008) Seize of 30 x 30 cm Optimization of the machine for our needs under way.

10 RD51 Kolimpari June 2009 Stéphan AUNE, Laminator unit Manual laminator ML 3024 from Rohm and Haas (20 k€) 12,7 mm ! The first test showed a perfect lamination with no bubble on photoresist layer. Automatic mode used without problems. Used for SLHC prototype.

11 RD51 Kolimpari June 2009 Stéphan AUNE, Exposure unit Exposure unit EU 530 from Rohm and Haas (20 k€) The first test showed a perfect exposure for 400 micron pillar. Used for SLHC prototype.

12 RD51 Kolimpari June 2009 Stéphan AUNE, Bulk Lab picture (1) Renovation of the lab was done in spring 2009: electricity, photoresist and gluing exhausts, liquid exhaust, de-ionized water to rinse, clean room filter change. Cost of 20 k€ Exposure unit development unit (old one)

13 RD51 Kolimpari June 2009 Stéphan AUNE, Bulk Lab picture (2) laminator OvenVacuum press Mesh stretching

14 RD51 Kolimpari June 2009 Stéphan AUNE, Saclay lab organization Permanent human resource: –5 persons at more or less 30% each: 1.5 man/year Engineer for lab upgrade and administration Engineer for R&D and external contact (CERN and other lab) Quality Engineer for written procedure Superior technician for R&D and prototype Technician for standard realization and lab upgrade (full time person) IRFU Project resource: –The lab will be an “open lab” for IRFU personal to make their bulk with the help of the permanent team. The goal is to have project personal to make prototype before buying them at CERN. External project resource: –Allow external collaboration to access the lab for prototypes and tests (bulk training): micromegas bulk diffusion

15 RD51 Kolimpari June 2009 Stéphan AUNE, Goal of the Saclay bulk lab 1.Control and understand the realization process of a bulk for each phases –Abacus of several parameters on each machine –Written procedure for standard realization 2.Realization of prototypes for the IRFU project –Prototypes –R&D on project (mesh segmentation, thin bulk,…) –Small serial (several days of occupation) 3.R&D engineering “for fun” with no direct application 4.Synergy with Rui’s lab –Exchange of process –Prototype at Saclay = serial at CERN R&D and prototype from design to test R&D and prototype and serial from design too sell