Adjustable tuner HENRY PRZYBILSKI / PIERRE-ALAIN LEROY.

Slides:



Advertisements
Similar presentations
RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Material choice Ofelia Capatina OC, Material choices Discuss material choices for – Helium tank – Flanges, joints, bellow OC,
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Status report on “Industrialization studies” at LAL on power couplers for XFEL _____ TILC08 – Tohoku University 3-6 March 2008 Sendai - Japan G. Wormser.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
International Workshop on Linear Colliders 2010 Design and fabrication update on PSI/Trieste X-band phase- space rotator structure Dmitry Gudkov 21-OCT-2010.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
F.E.T.S. RFQ Mechanical Design by Peter Savage 7 th January 2010.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
1.3GHz Input Coupler for ILC
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
NEW FAST WIRE SCANNER Manufacturing review Emilien Rigutto
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
20 years of high average Fundamental Power Coupler designs at CERN CWRF workshop 2014, Trieste Eric Montesinos, CERN-RF, on behalf of many colleagues CWRF.
Manufacturing contracts for RFQ
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
Manufacturing process, validation and factory test
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
Cavity support scheme options Thomas Jones 25/06/15 1.
TD26CC PLANS FROM CIEMAT Laura Sánchez on behalf Electrical Engineering Group of CIEMAT.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
HiLumi-LHC/LARP Crab Cavity System External Review – May Work partly supported by the EU FP7 HiLumi LHC grant agreement No and by the.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Mechanical design considerations for beta=1 cavities OC, 28/July/20111SRF2011 Chicago O. Capatina, S. Atieh, I. Aviles Santillana, G. Arnau Izquierdo,
CDR2 – Coupler Mechanical Design NICOLAS MISIARA.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
ESS RFQ B. POTTIN and RFQ team CEA-IRFU. RFQ design Strategy 3 RF codes to validate calculations Consideration of machining and assembly possibilities.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
PXIE RFQ Engineering Design Steve Virostek Engineering Division Lawrence Berkeley National Laboratory April 10, 2012 Project X Collaboration
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
704 MHz cavity design based on 704MHZ_v7.stp C. Pai
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
First Wall Panel - Overview
LCWS11 WG4 Fully featured accelerating structure engineering design
Coupled thermal-structural FEA of AS tooling for brazing of manifolds to disk stack R. Raatikainen, F. Rossi
Bruno POTTIN, Anne-Catherine CHAUVEAU
TDR guideline discussion on Cavity Integration
Ed Daly for W. Robby Hicks
Ti/SS transitions A.Basti INFN-PISA*
HFM Test Station Main Cryostat
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Physics design on Injector-1 RFQ
Vacuum System Failures at HERA
Superconducting RF Crab Cavities
Design of Distribution Feedbox at LHC P7
IMP Cryomodule Assembly and Alignment
Phase II Collimators : design status
LARP Phase II Secondary Collimator RC-1
CEPC-650MHz Cavity Cryomodule
Ceramic to metal connection.
Double-Spoke Cavities
System tests at CEA O. Piquet 19/03/2019
Presentation transcript:

Adjustable tuner HENRY PRZYBILSKI / PIERRE-ALAIN LEROY

SUMMARY 1.IPHI - feedback 2.Adjustable tuner 1. Mechanical studies 1. Design 2. Positioning range 2. Thermal studies 3. Problems 3.R&D 1. Welding / brazing 2. Fatigue | PAGE 2 8/9-Dec-15 CDR2 - Mechanical integration - H. PRZYBILSKI / P-A. LEROY

IPHI - FEEDBACK Main purpose of the tuner: Ideal voltage law RF Tuning procedure 1.Measure the depth of the « tuner » in the cavity 2.Measure the length of the « final » tuner 3.Machining the setting shim 4.Assembly | PAGE 3 8/9-Dec-15 CDR2 - Mechanical integration - H. PRZYBILSKI / P-A. LEROY

IPHI - FEEDBACK Main purpose of the tuner: Ideal voltage law IPHI - RF Tuning procedure 1.Measure the depth of the « tuner » in the cavity 2.Measure the length of the « final » tuner 3.Machining the setting shim 4.Assembly | PAGE 4 8/9-Dec-15 CDR2 - Mechanical integration - H. PRZYBILSKI / P-A. LEROY Test tunerFinal tunerSetting shimAssembly

IPHI - FEEDBACK Main purpose of the tuner: Ideal voltage law IPHI - RF Tuning procedure 1.Measure the depth of the « tuner » in the cavity 2.Measure the length of the « final » tuner 3.Machining the setting shim 4.Assembly | PAGE 5 8/9-Dec-15 CDR2 - Mechanical integration - H. PRZYBILSKI / P-A. LEROY Test tunerFinal tunerSetting shimAssembly

IPHI - FEEDBACK Main purpose of the tuner: Ideal voltage law IPHI - RF Tuning procedure 1.Measure the depth of the « tuner » in the cavity 2.Measure the length of the « final » tuner 3.Machining the setting shim 4.Assembly | PAGE 6 8/9-Dec-15 CDR2 - Mechanical integration - H. PRZYBILSKI / P-A. LEROY Test tunerFinal tunerSetting shimAssembly

IPHI - FEEDBACK Main purpose of the tuner: Ideal voltage law IPHI - RF Tuning procedure 1.Measure the depth of the « test » tuner in the cavity 2.Measure the length of the « final » tuner 3.Machining the setting shim 4.Assembly | PAGE 7 8/9-Dec-15 CDR2 - Mechanical integration - H. PRZYBILSKI / P-A. LEROY Test tunerFinal tunerSetting shimAssembly

IPHI - FEEDBACK Main purpose of the tuner: Ideal voltage law IPHI - RF Tuning procedure Disadvantages: 1.Using of 2 different tools 2.Machining of the setting shim 3.Measurement reading error + machining tolerance  Lower risks / time saving | PAGE 8 8/9-Dec-15 CDR2 - Mechanical integration - H. PRZYBILSKI / P-A. LEROY

ADJUSTABLE TUNER MECHANICAL STUDIES Design | PAGE 9 8/9-Dec-15 CDR2 - Mechanical integration - H. PRZYBILSKI / P-A. LEROY Hydraulic connections Tuner body RF joint Bellows baseplate Bellows Guide Brazing Copper / Copper Brazing Copper/Stainless Steel Welding process (TIG / EB / LASER ?) Nut Flange Slide Cooling system

ADJUSTABLE TUNER MECHANICAL STUDIES Design | PAGE 10 8/9-Dec-15 CDR2 - Mechanical integration - H. PRZYBILSKI / P-A. LEROY Hydraulic connections Tuner body RF joint Bellows baseplate Bellows Guide Brazing Copper / Copper Brazing Copper/Stainless Steel Welding process (TIG / EB / LASER ?) Nut Flange Slide Cooling system

ADJUSTABLE TUNER MECHANICAL STUDIES Design | PAGE 11 8/9-Dec-15 CDR2 - Mechanical integration - H. PRZYBILSKI / P-A. LEROY Hydraulic connections Tuner body RF joint Bellows baseplate Bellows Guide Brazing Copper / Copper Brazing Copper/Stainless Steel Welding process (TIG / EB / LASER) Nut Flange Slide Cooling system Pa Vacuum

ADJUSTABLE TUNER MECHANICAL STUDIES Design | PAGE 12 8/9-Dec-15 CDR2 - Mechanical integration - H. PRZYBILSKI / P-A. LEROY Hydraulic connections Tuner body RF joint Bellows baseplate Bellows Guide Brazing Copper / Copper Brazing Copper/Stainless Steel Welding process (TIG / EB / LASER?) Nut Flange Slide Cooling system

ADJUSTABLE TUNER MECHANICAL STUDIES Positioning Range Maximum range = 60mm | PAGE 13 8/9-Dec-15 CDR2 - Mechanical integration - H. PRZYBILSKI / P-A. LEROY INOUT 38 22

ADJUSTABLE TUNER THERMAL STUDIES The mechanical design includes the thermal studies to reduce the pressure drop and to ease the flow circulation. | PAGE 14 8/9-Dec-15 CDR2 - Mechanical integration - H. PRZYBILSKI / P-A. LEROY d Shape

ADJUSTABLE TUNER PROBLEMS Bellows supplier has no experience in putting a bellows in a brazing oven. The thermal treatment will reduce the life-cycle by a factor 2. It means cycles instead of There are 2 kinds of bellows: Donc il est nécessaire de passer par une phase de R&D. | PAGE 15 8/9-Dec-15 CDR2 - Mechanical integration - H. PRZYBILSKI / P-A. LEROY Stainless SteelInconel PriceCheapExpensive Heat resistanceNoYes Brazing processKnown*Unknown* Welding processStainless Steel – Known* Stainless Steel – Unknown* Inconel – Unknown*Inconel – Known* *Known / Unknown by the CEA

R&D BRAZING AND WELDING TESTS Tests on both type of bellows Brazing Inconel / Copper Welding Stainless Steel / Inconel TIG welding process Electron Beam welding process Laser welding process | PAGE 16 8/9-Dec-15 CDR2 - Mechanical integration - H. PRZYBILSKI / P-A. LEROY

R&D FATIGUE TESTS Tests on both type of bellows Fatigue tests after brazing process 100 cycles Leak detection Deformation | PAGE 17 8/9-Dec-15 CDR2 - Mechanical integration - H. PRZYBILSKI / P-A. LEROY Welding test Inconel Stainless Steel ~100 cycles

CONCLUSION New design We need to qualify: Material Welding procedure  R&D Thank you for your attention. | PAGE 18 8/9-Dec-15 CDR2 - Mechanical integration - H. PRZYBILSKI / P-A. LEROY