Doc.: IEEE 802.22-05/0038r0 Submission May 2005 Paul Thompson, Paul Thompson Associates, LLCSlide 1 WRAN Base Station Class Proposal IEEE P802.22 Wireless.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0049r0 Submission Zander LEI, I2R Singapore January 2007 Slide 1 Proposed Beacon Design vs. Baseline Date: Authors: Notice:
Advertisements

Doc.: IEEE /90r0 Submission Nov., 2012 NICTSlide b NICT Proposal IEEE P Wireless RANs Date: Authors: Notice: This document.
Doc.: IEEE /0530r1 Submission November 2007 Gerald Chouinard, CRCSlide 1 Wireless Microphone Sensing IEEE P Wireless RANs Date:
Doc.: IEEE /0179r0 Submission April 2007 Wu Yu-Chun, Huawei HisiSlide 1 CRC_Length_and_FEC_gain_of_PSDU for the IEEE P Wireless.
Doc.: IEEE xxxxr0 Submission May 2008 Chang-Joo Kim, ETRISlide 1 [ TPC Equation ] IEEE P Wireless RANs Date: Authors: Notice:
LB84 General AdHoc Group Sept. Closing TGn Motions
[ Interim Meetings 2006] Date: Authors: July 2005
IEEE WG Status Report – July 2005
IEEE White Space Radio Contribution Title
London TGu Motions Authors: January 2007 Date: Month Year
LB73 Noise and Location Categories
LB73 Noise and Location Categories
WRAN Protocol Reference Model(PRM)
Waveform Generator Source Code
System Requirements for the RASGCIM Amendment
[ Considering of Intra-cell multiple CBP response]
March 2014 Election Results
Geolocation Database Interface
TGp Closing Report Date: Authors: July 2007 Month Year
Attendance and Documentation for the March 2007 Plenary
[ Policies and Procedure Summary]
[ Policies and Procedure Summary]
Aggregated Interference from CPEs
Output from Wireless Architecture discussions
3GPP liaison report May 2006 May 2006 Date: Authors:
Motion to accept Draft p 2.0
3GPP liaison report July 2006
[place presentation subject title text here]
Motions Date: Authors: January 2006
(Presentation name) For (Name of group) (Presenter’s name,title)
TGp Motions Date: Authors: November 2005 Month Year
On Coexistence Mechanisms
WRAN Protocol Reference Model(PRM)
[Comparison between CDMA Code and Contention-based Access]
TGu-changes-from-d0-02-to-d0-03
TGp Closing Report Date: Authors: May 2007 Month Year
ATSC DTV Receiver Performance Multipath Equalization
IEEE WG Opening Report – March 2007
On Coexistence Mechanisms
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGv Redline D0.06 Insert and Deletion
Experimental DTV Sensor
IEEE WG Opening Report – July 2008
“Comment Status” Definitions
IEEE P Wireless RANs Date:
IEEE P Wireless RANs Date:
Spectrum Sensing Tiger Team
TGu-changes-from-d0-01-to-d0-02
LB73 Noise and Location Categories
TGy draft 2.0 with changebars from draft 1.0
TGv Redline D0.10 Insert and Deletion
IEEE WG Opening Report – July 2007
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
TGr Proposed Draft Revision Notice
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
System Requirements for the RASGCIM Amendment
Draft P802.11s D1.03 WordConversion
Questions to the Contention-based Protocol (CBP) Study Group
Motion to go to Letter Ballot
EC Motions – July 2005 Plenary
TGu-changes-from-d0-04-to-d0-05
TGu-changes-from-d0-03-to-d0-04
TGu Motions Date: Authors: May 2006 May 2006
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
MAC - Spectrum Sensing Interface
TGr Proposed Draft Revision Notice
TGp Motions Date: Authors: January 2006 Month Year
Presentation transcript:

doc.: IEEE /0038r0 Submission May 2005 Paul Thompson, Paul Thompson Associates, LLCSlide 1 WRAN Base Station Class Proposal IEEE P Wireless RANs Date: Author: Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chairhttp://standards.ieee.org/guides/bylaws/sb-bylaws.pdf Carl R. StevensonCarl R. Stevenson as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at >

doc.: IEEE /0038r0 Submission May 2005 Paul Thompson, Paul Thompson Associates, LLCSlide 2 Abstract Multiple Classes of WRAN System Base Stations are proposed which have deployment constraints to preserve non-interference to incumbent operators concurrent with increased EIRP.

doc.: IEEE /0038r0 Submission May 2005 Paul Thompson, Paul Thompson Associates, LLCSlide 3 WRAN Base Station Class Definitions Base Station Class I II III IV Maximum EIRP (dBm) +36 (4 Watts) Adjacent Channel Proximity Constraints No N+/-1 * The distance constraint must be enforceable, e.g., private land surrounding the Base Station, agreements with DTV set owners, etc. Base Station to DTV Receiver distance (meters)* None Profess- ional Install? Not mandatory Base Station to DTV Receiver distance used for analysis (meters ) 10 EIRP Profile Same as CPE Emission 3 m/120 kHz N+/ v/m N+/-2 CPE 4.8 uv/m +36 (4 Watts) +46 (40 Watts) +56 (400 Watts) No N+/-1 20None CPE +6 dB 9.6 uv/m 20Yes 200 v/m Yes None 200 v/m CPE +16 dB 30.6 uv/m CPE +26 dB 96 uv/m