CETC54 contributions Neil Roddis Apr 15, 2010. SPDO In Shijiazhuang Covering the area of 2 sq.km. Founded in 1952 Over 5000 employees (543 senior engineers,

Slides:



Advertisements
Similar presentations
The National Skills Academy for Manufacturing. WHY WAS THE SKILLS ACADEMY CREATED?
Advertisements

Square Kilometre Array (SKA) Project PRE-CONSTRUCTION PHASE Briefing for Industry & Science Organisations Tuesday 14 th August Wellington.
Quality Management Training Quality circles Bench Mark Kaizen.
5-6 May 2009 AWG Meeting LAX1 Technology Development Project US contributions to global.
by DATUK IR. HAMZAH HASAN CHIEF EXECUTIVE CIDB MALAYSIA
SKA South Africa Overview Thomas Kusel MeerKAT System Engineering Manager April 2011.
Philip Diamond RadioNet Co-ordinator University of Manchester Jodrell Bank Observatory.
DVAC CONCEPT DESCRIPTION: OFFSET GREGORIAN DISH — DVAC-1 PRIME FOCUS DISH — DVAC-2 卢雨 (Yu Lu), Vice Joint Lab. for Radio.
Design Review: November 17,2011 Team Members: Allan Davis Carlos Gonzalez Cooper McBride.
Goals of DVA-1 Meeting Overall goal: build an SKA antenna with SKA feeds/receivers, verify performance and fabrication/costs for the next stages of the.
ALTERNATIVE MECHANICALS DVA1 Meeting at NSF Arlington VA April 15-16, 2010 Matt Fleming Contributions from Jack Welch Roger Schultz Gordon Lacy.
College of Engineering, Technology, and Computer Science Department of Electrical & Computer Engineering Technology & Information Systems Fall 2011 Peter.
BROSE Systeme GmbH · Kienitzer Str. 98 · Berlin · Germany · · Tel.: +49 (0)
LIGO-G M LIGO Laboratory1 Adv. LIGO Facilities Modifications (FAC) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
Copyright © 2012 by Cengage Learning. All rights reserved Chapter 14 Managing & Enhancing Performance: The BIG PICTURE Prepared by Joseph Mosca Monmouth.
TTI REPORT ON THE GHANA FAB LAB. The vision of the Institute The trainees at TTI acquire vocational skills and qualifications that meet the changing needs.
A Brief Overview Midwest COOLING TOWERS, INC. A Full Checklist of Products & Services for Your Cooling Tower Project Quality Service Integrity Value Quality.
. Wind Energy and Economic Development The Texas Industry Cluster Initiative Advanced Technologies & Manufacturing Aerospace & Defense Biotechnology &
Transition from SKADS to PrepSKA Richard Schilizzi Lisbon, 3 October 2008.
UAS Universal Anchoring Solutions The Helipost™ An environmentally friendly engineered alternative to expensive concrete anchors and piers, the Helipost.
Engaging industry The Australian SKA experience Dr Carole Jackson, CSIRO Astronomy and Space Science NAOJ, Mitaka, 5 November 2010.
Level 2 Unit 6 Application of Manufacturing Techniques in Engineering Engineering Diploma Level 2 Unit 6 Application of Manufacturing Techniques in Engineering.
US SKA TDP DVA-1 June 28-29, 2012Dish Verification Antenna No. 1 Critical Design Review, Penticton, BC Overview Of DVA-1 Optics Lynn Baker Bill Imbriale.
Excel Engineering Fabrications SolidWorks Andrew ClarkeRegional sales manager Alan PopejoyTechnical and training consultant.
Kick-Off Meeting Towards Formation of a North Carolina Nanotechnology Center(NCNC) 10:00-11:00 AM May 14, 2001 D106 Levine Science Research Center (LSRC)
SKA Dishes, CSIRO February 2013 SKA Dish Verification Antenna #1 Gary Hovey Astronomy Technology Program – Penticton 12 February 2013.
Group H: Krista, Christine, Sara, Dorothee. Agenda 3 Goals of Our Presentation To better understand how ERP has impacted Celestica’s operations To draw.
DVP Testing Neil Roddis Apr 15, SPDO Why is test and verification so important for SKA dishes? Capital cost: design for low cost of a few thousand.
June 3,4 2010Lynn Baker USSKA Consortia Washington, DC1 TDP / AWG Update Lynn Baker USSKA Consortia Meeting Washington DC June 3,4, 2010.
Dish Verification Antenna – 1 Project NRC - Herzberg Gary Hovey 18 November 2013.
Service excellence for customers world-wide The Cost Of Test: A Perspective from a Test Service Provider SETNET User Group 21 February,
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
Infrastructure Equipment December 19, Background To complete the work for the ATLAS detector, some additional equipment items are needed. In addition,
AAO Future options 2 x 2 matrix Governance by AAL (AAL takes role currently played by AATB) Governance by CSIRO Colocated with CSIRO in Sydney Located.
Project Management Plan. Project Organisation DVA-1 Board n One member for each stakeholder n Oversees execution of DVA-1 on time and within budget n.
Common R&D projects for the LHC upgrade and plans for irradiation facilities Outline: PH common R&D projects Working Group on future irradiation facilities.
RMIS Engineering At RMIS Engineering we specialise in Mechanical Engineering Contracting and Fabrication works to serve a wide range of industries in Carbon/Mild.
Netherlands Institute for Radio Astronomy Big Data Radio Astronomy A VRC for SKA and its pathfinders Hanno Holties March 28 th 2012.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
Prototyping of Complex Systems Some Experiences Gilson Bootstrapping Series November 8, 2011 Farshid Feyzi Physical Sciences Laboratory.
The Alberta Centre for Advanced Micro and Nano Technology Products Speeding the Path From Prototype to Commercial Product Ken Brizel CEO, ACAMP
3 rd March 2006EUS Consortium meeting EUS Instrument Overview Eric Sawyer RAL.
17 November 2008Lynn Baker US SKA Consortia Meeting Madison WI1 TDP Activity Report Lynn Baker US SKA Consortia Meeting Madison, Wisconsin November 17,
York Laboratory Information Systems Restructuring Proposal IEM 5303 Term Paper Fall 2000 Chris M. Forth Senior Project Engineer York International.
 Your Single Source for "to spec" Custom Manufacturing Your Single Source for "to spec" Custom Manufacturing  AMS offers a unique and complete combination.
Photo: Anthony Holloway Public Outreach and Engagement at Jodrell Bank Naomi Smith Events and Participation Programme Manager Jodrell Bank Discovery Centre.
Enjoys a worldwide reputation for excellence. Personnel average 20 years experience in the satellite communications industry Field Engineering Installs/Deinstalls/Disaster.
Clinical Research Facilities supporting Global Health
Operations as a Competitive Weapon
We were founded 34 years ago
Day 1 Session 2/ Programme Objectives
Career Exploration Strategy
IPS Telescopes in China
Operations Strategy.
Wideband Single Pixel Feeds
A B C Solution Analysis Technology Maturation & Risk Reduction
Electric equipment company in India
Need for the ATA SKA Development Facility
IT and the Changing Social Division of Labor
Pinellas Park Middle School
Transfer of Medical Devices Manufacturing Technology
Introduction to Scheduling Chapter 1
Breakout Session Summary Construction
6-3 Starting a Small Business
DVA1 as Part of the Dish Verification Program (DVP) Washington, DC P
SKA PEP - Dish Array WP5 Phase 1 Dishes with Single Pixel Feed Systems
Australia Telescope Users Committee Technologies Report – October 2011
Agenda, Day 1, Tuesday, June 19
5th PASET Forum Kigali, Rwanda| May 22, 2019
Presentation transcript:

CETC54 contributions Neil Roddis Apr 15, 2010

SPDO In Shijiazhuang Covering the area of 2 sq.km. Founded in 1952 Over 5000 employees (543 senior engineers, 1000 engineers) CETC54- ProCCfCETile CETC54 !!!!!!!!!!!!!!

SPDO CETC54- Layout Manufacturing Workshop 15 mins 20 mins 30 mins 2 hours

SPDO CETC54- Laboratory Joint Laboratory for Radio Astronomy Technology NAOC and CETC54 JLRAT

SPDO What do CETC54 want to do? Win large non-military export contracts –Last year $100M –Little profit from ASKAP Manufacture and install all of the SKA dishes –Manufacture in China, re-assemble on site Use their own fabrication technology –Session 12 tomorrow Do most, if not all, of the mechanical design –Also em design Manufacture feeds and receivers 5

SPDO Manufacture a mount to TDP design Manufacture a complete antenna (DVAC) to the TDP optics design, but using panels. Virtually anything, if they thought it would lead to getting the big contract? What would CETC54 be prepared to do? 6

SPDO CETC54: strengths Enormous resources Engineers Skilled manpower Sub-contractors Excellent facilities Manufacturing Test ranges Anechoic chamber etc. Low labor cost Fast response Extensive satcom experience Willing to embrace and develop new designs (ASKAP) 7

SPDO CETC54: weaknesses Minimal radio astronomy experience But JLRAT should help High noise designs Used to working to satcom specs Attached to established in-house technologies and design solutions? But may be persuaded to adopt new solutions Do it their way or not at all? Resistant to suggestions about manufacture on site 8

SPDO What should we ask CETC54 to do? Build DVAC in parallel with DVA-1 to the same specification, but using panels. –Interesting test of alternative manufacturing technique –Integrate and test where? –Funded by NAOC and CETC54? Manufacture the mount for DVA-1? –Only if funds are so short that this is the only way to build DVA-1. 9

We are The North West China Research Institute of Electronic Equipment Institute of Electronic Equipment

SPDO NWIEE/CETC39 Split from CETC54 in 1970s Similar capabilities and resources They have made hundreds of 9, 11 and 13 metre antennas. Also keen to win ‘The SKA Contract’ 11

End 12