Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
PROJECT SCOPE, SCHEDULE, AND RESOURCE MANAGEMENT
LSU 07/24/2004Defining Project Tasks1 Defining the Project Tasks Project Management Unit, Lecture 4.
The BIM Project Execution Planning Procedure
Edward B. Farkas, Managing Director, Project Management Practice
Lecture 4 Title: The Scope Management Plan
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Management & Development of Complex Projects Course Code - 706
Copyright 2008 Introduction to Project Management, Second Edition 2  Many people have heard the following sayings: ◦ If you fail to plan, you plan to.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
Geog 469 GIS Workshop Project Management.
Work Breakdown Structure Use and Demo
PLANNING ENGINEERING AND PROJECT MANAGEMENT
 Engineers have led the way on project management, it is now “hot and trendy”.  #1 Area of Continuing Education reported by Penn State Behrend ECE alumni.
 Project Time Management includes the processes required to accomplish timely completion of the project  Part of Triple Constraints  Managers often.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
WBS Work Breakdown Structure © Unitec New Zealand.
SOFTWARE PROJECT MANAGEMENT
WEEK 3 Project Planning.
Creating a Work Breakdown Structure with Microsoft Project.
MANAGEMENT of INFORMATION SECURITY, Fifth Edition.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson PowerPoint Presentation by Charlie Cook The University of West Alabama Defining the Project Chapter.
Project Management 6e..
Chapter 3 Managing the Information Systems Project
Work Breakdown Structure (WBS)
Project Management 6e..
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
Project Management Methodology Used in Responding to Publishers’ Surveys Presenters: Jay Johnson, Institutional Research and Planning Liana Crisan-Vandeborne,
Project Management MGT 30725
Project Management Systems
Managing the Information Systems Project
Scope Planning.
Module nine PMP® Mastery 2016 APMG Create WBS
Chapter 4 Defining the Project.
Project Management -- Defining the Project
Work Breakdown Structure
WORK BREAKDOWN STRUCTURE
Business System Development
Information Technology Project Management – Fifth Edition
Create a project schedule
Project Management.
Defining the Activities
Defining the Project Chapter 4.
DEFINING THE PROJECT CHAPTER 4.
Where We Are Now. Where We Are Now Defining the Project (100) Step 1: Defining the Project Scope Step 2: Establishing Project Priorities Step 3: Creating.
Work Breakdown Structure
Project Theory and Application
Defining the Project Step 1: Defining the Project Scope
Welcome W 4.2 Introduction to Engineering Design II (IE 202)
MGT 605: CH 04 Defining the Project.
Project Scope / Time / Cost
Project Management Process Groups
P ROJECT M ANAGEMENT Skills.
Work Breakdown Structure and Activity List Workshops
CBGD: Nguyễn Thanh Tùng
Importance of Project Schedules
PLANNING & SCHEDULING (First Part)
CAD DESK PRIMAVERA PRESENTATION.
Time Scheduling and Project management
Introduction to Project Management
Defining the Project Tasks, Cost and Schedule
T-FLEX DOCs PLM, Document and Workflow Management.
Information system analysis and design
Presentation transcript:

MENG 446 : Management of Engineering Projects The American University in Cairo Engineering Department Mechanical Engineering Unit MENG 446 : Management of Engineering Projects Dr. L.K. Gaafar Joseph Kamal Mohamed El Daour Mohamed El Fatih Sherif Masoud Youssef Youssef

Work Breakdown Structure

Outline Introduction Origin of WBS Definition WBS Structure Developing WBS WBS Role Applying WBS Project Coding System WBS Rules Conclusion

Introduction During the course of any project, numerous activities must be completed by several individuals or organizations. A key strategy of effective planning is to partition the project into manageable chunks that can be individually planned, estimated, and controlled. Such division is done through the development of a work breakdown structure (WBS). The work breakdown structure is a graphical tool that displays the project’s statement of work.

Origin of WBS The WBS approach of the US Department of Defense’s Cost/schedule Control System Criteria (C/CSC) or ‘C.Spec.’ was established as far back as the late 1960s. Using WBS was limited in the 1970s and 80s because of its close association with the relatively complex C.Spec. total system. In the 1990s WBS was gaining more widespread adoption in private industry. Many Project management software packages today are incorporating WBS as integral to their use.

Definition A work breakdown structure, according to the Project Management Institute, is a product-oriented “family tree” or hierarchal listing that allows the total scope of the project to be organized and defined. WBS starts with a single box at the top that represents the whole project which is then partitioned into its components with lower level boxes.

WBS Structure The Project LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4

Example

Developing WBS Identify the major project elements (usually the project deliverables plus project management functions). Decide if adequate cost and duration estimates can be developed for each element at this level. If so, go to step 4. Subdivide each element into smaller components that can be identified in terms of tangible, verifiable results. These components should reflect how the project will be accomplished. Verify the decomposition by determining if all lower-level items are necessary and sufficient for completion of the item decomposed. Each item should be clearly and completely definable by a brief scope statement.

WBS Role Partitions the major project deliverables into smaller components to improve the accuracy of cost estimates. Provides a mechanism for collecting and organizing actual costs. Provides a mechanism for time, cost, and performance tracking. Allows establishing responsibility assignments for each element.

WBS Role (Cont.) The WBS allows: Program description as the summation of sub divided elements. Linking Objectives to company resources in a logical manner. Schedules and status-reporting procedures. Network construction and control planning.       

Applying WBS The work sequence affects the WBS and the WBS affects the work sequence. Size of the WBS reflects the time the project manager needs to spend to coordinate the elements. As the size increases, communication requirements grow. Therefore a project should not be decomposed into any larger set of elements than is necessary to deliver a quality project in a timely manner. Each item in the WBS is generally assigned a unique identification code to facilitate this process.

Project Coding System Project coding system is used to structure the project, identify the cost accounts, WBS elements, and establish their relationships. Coding simply involves using a multi-digit number, or assembly of numbers and letters, each of which, or a combination of which, has a meaning or significance. Each code number uniquely identifies a cost account, WBS element, and their parent-child relationship in the WBS.

Example Program: New Plant construction and Start-up 01-00-00 Project1: Analytical Study Task1: Marketing/Production Study Task 2:Cost Effectiveness Analysis 01-01-00 01-01-01 01-01-02 Project 2: Design and layout Task 1: Production Processing Sketches Task 2: production Processing Blueprints 01-02-00 01-02-01 01-02-02 Project 3: Installation Task 1: Fabrication Task 2: Set Up Task 3: Testing and Run 01-03-00 01-03-01 01-03-02 01-03-03 Project 4: Program Support Task 1: Management Task 2: Purchasing Raw Materials 01-04-00 01-04-01 01-04-02

WBS Rules Elements should reflect the number of subcontracts. Both the WBS and work description should be easy to understand. All schedules should follow the WBS. No attempt should be made to subdivide work arbitrarily to the lowest possible level. The lowest level of work should not end up having a ridiculous cost in comparison to other efforts.

WBS Rules (Cont.) The WBS should remain flexible to accommodate scope-of-effort changes. Elements should identify discrete and tangible milestones. Activity element levels should reflect a trust in certain groups to perform their responsibilities. Most lowest-control-level elements should range from 0.5% to 2.5% of the total project budget.

Conclusion The WBS diagram can be developed by hand. For large projects, when there are dozens of activities that need to be identified, developing the WBS is done using a software. WBS is a very valuable tool for managers because it helps them plan and control their projects. When developing a WBS, a set of rules should be followed to guarantee reaping its maximum benefits For instance, managers should avoid planning unnecessary activities so they do not waste money and time on them.

Ready for Your Questions Thank You Ready for Your Questions