Advancements on RF systems D. Alesini (LNF-INFN) Quinto Meeting Generale Collaborazione LI2FE, Frascati 15-16/03/2011.

Slides:



Advertisements
Similar presentations
CLIC08 workshop Structure production: CERN activities and Master Schedule G. Riddone, W. Wuensch, R. Zennaro, Contributions from C. Achard, S. Atieh, V.
Advertisements

5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
Development of an X-band Dielectric PETS C. Jing, Euclid Techlabs / ANL HG Workshop, May
Injector RF Design Review November 3, 2004 John Schmerge, SLAC LCLS RF Gun Thermal Analysis John Schmerge, SLAC November 3,
1 X-band Single Cell and T18_SLAC_2 Test Results at NLCTA Faya Wang Chris Adolphsen Jul
Design of Standing-Wave Accelerator Structure
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Different mechanisms and scenarios for the local RF
C-band Structures at SPARC and Overview of
Rossana Bonomi, Alberto Degiovanni, Marco Garlasché, Silvia Verdú Andrés 5.7 GHz high gradient test cavity
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
THE TOP LINAC PROJECT ISS-ENEA Project to demonstrate operability of a compact proton linac in a medium size hospital HIGH POWER RF TESTS OF THE FIRST.
Test Facilities and Component Developments Sami Tantawi SLAC May 15, 2008.
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
The Frascati C-band structure and the high-power test of the cavity at KEK B. Spataro (LNF-INFN, Frascati, Italy) on behalf of the SPARC/X C-Band group.
Damped C-Band structures for ELI_NP proposal D. Alesini (LNF-INFN, Frascati, Italy) CERN, 18 July 2012.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
RF structure design KT high-gradient medical project kick-off Alberto Degiovanni TERA Foundation - EPFL.
PROPOSAL G.I.A.F. (HYBRID GUN AT HIGH FREQUENCY) INFN-LNF – UNIVERSITY OF ROME “LA SAPIENZA”- UCLA D. Alesini (T), M. Ferrario (R), A. Gallo (T),
Modulator and overmoded RF components status for the 12GHz Test Stand at CERN - RF meeting – 17/03/2010.
Development of the Room Temperature CH-DTL in the frame of the HIPPI-CARE Project Gianluigi Clemente,
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
RF scheme of electron linear accelerator with energy MeV Levichev A.E. Budker Institute of Nuclear Physics SB RAS.
Measurements of the X-ray/pump laser pulse timing Valery Dolgashev, David Fritz, Yiping Feng, Gordon Bowden SLAC 48th ICFA Advanced Beam Dynamics Workshop.
The CLIC accelerating structure development program Walter Wuensch CARE05 23 November 2005.
The NLC RF Pulse Compression and High Power RF Transport Systems Sami G. Tantawi, G.Bowden, K.Fant, Z.D.Farkas, W.R.Fowkes J.Irwin, N.M.Kroll, Z.H.Li,
MP - HIPPI General meeting, Abingdon October 28-30, Side Coupled Linac Design at CERN Side Coupled Linac Design at CERN M. Pasini, Abingdon September.
C-BAND ACCELERATION ACHIEVEMENTS, USE AND APPLICATION
704 MHz warm cavity November 4, 2015 A.Zaltsman: SRF & warm RF components for LEReC1  A single cell 704 MHz warm cavity is used to correct the beam energy.
TESLA DAMPING RING RF DEFLECTORS DESIGN F.Marcellini & D. Alesini.
WP8-HGA High Gradient Acceleration M. Biagini (INFN-LNF) WP8 coordinator Tiara Kickoff Meeting, CERN, Feb , 2011.
UPDATE ON KICKERS LNF David Alesini for the LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Conventional source developments (300Hz Linac scheme and the cost, Part-II) Junji Urakawa, KEK PosiPol-2012 at DESY Zeuthen Contents : 0. Short review.
The US High Gradient Collaboration Vision for Research and Development on Ultra High Gradient Accelerator Structures Sami Tantawi, SLAC ( on behalf of.
Accelerating structure prototypes for 2011 (proposal) A.Grudiev 6/07/11.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
A New Technology based on clamping for High Gradient Radiofrequency Photogun David Alesini LNF-INFN, Frascati, Rome, Italy September 2015 La Biodola,
Towards a full C-band multi-bunch/high rep. rate/high gradient injector linac D. Alesini (LNF-INFN, Frascti, Italy) With the contribution of: A. Bacci,
C/S band RF deflector for post interaction longitudinal phase space optimization (D. Alesini)
1 st TIARA Steering Committee A. Gallo – INFN Frascati deputy of TIARA WP8 leader STATUS OF TIARA WP8.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
Franck PEAUGER – CEA SACLAY LCWS11 - Grenada 29 th September 2011 High power RF components F. Peauger, A. Branco, M. Desmons, W. Farabolini, P. Girardot,
Areal RF Station A. Vardanyan
Present and possible future schemes for hadron therapy linacs Alberto Degiovanni for the ADAM team HG2017 Workshop , Valencia.
RF Dipole HOM Electromagnetic Design
RadiaBeam Technologies, Santa Monica CA
Abstract EuSPARC and EuPRAXIA projects
Development of X-band 50MW klystron in BVERI
An X-band system for phase space linearisation on CLARA
Application of moderate (5 MW) X-band power sources for the CLIC accelerating structures testing program and other projects I. Syratchev, CERN.
Optimisation of single bunch linac for FERMI upgrade
NC Accelerator Structures
Physics design on Injector-1 RFQ
X-band and high-gradient development plans at Tsinghua University
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
Brief Review of Microwave Dielectric Accelerators
Review of rf structure test results
SPARC RF gun status by P. Musumeci Review committee
12 GHz High Power RF components requirements for CEA activities
Developments on Proposed
Testing Infrastructure, Program and Milestones
(INFN – Laboratori Nazionali di Frascati)
CEPC injector high field S-band accelerating structure design and R&D
Update of CLIC accelerating structure design
Recent high-gradient testing results from the CLIC XBoxes
SuperB project. Injection scheme design status
Progress in the design of a damped an
Advanced Research Electron Accelerator Laboratory
Physics Design on Injector I
Presentation transcript:

Advancements on RF systems D. Alesini (LNF-INFN) Quinto Meeting Generale Collaborazione LI2FE, Frascati 15-16/03/2011

OUTLINE 1)C BAND STRUCTURES FOR SPARC ENERGY UPGRADE (D. Alesini, et al., DESIGN, REALIZATION AND LOW POWER RF TESTS OF THE C BAND STRUCTURE PROTOTYPE FOR SPARC, SPARC-RF-11/002, 1 February 2011 ) Design: single cell, coupler Realization: prototype Results of high power RF test at KEK 2) NEW S-band RF Gun Design: 2D profile, coupler Realization 3) Time schedule

E ≈ 170 MeV GUN Klystron N°1 ≈ 13 MV/m ACC. SECTION 20 ÷ 22 MV/m ≈ 130 MeV ACC. SECTION Klystron N°2 PULSE COMPRESSOR ATT 3 dB splitter The SPARC energy will be upgraded from  170 to >240 MeV by replacing a low gradient S-band traveling wave section with two C-band units. We decided to implement this system at SPARC to explore the C Band acceleration (RF components, construction at LNF TW sections, SLED, syncronization) in hybrid scheme with S Band: -Higher gradients -Very promising from the beam dynamics point of view SPARC ENERGY UPGRADE C-band Station C-band ENERGY COMPRESSOR C-band acc. structures > 35 MV/m 5712 MHz – 50 MW 1.4 m ≈ 50 MW ≈ 100 MW/0.20 μs 2.5 μs E > 240 MeV The new C-band system consists mainly of:  2 accelerating sections (1.4 m long)  1 C-band klystron (50 MW), by Toshiba Ltd (JP)  1 Pulsed HV modulator supplied by ScandiNova (S)  WR187 waveguide system  400 W solid state driver supplied by MitecTelecom (CDN)  SLED

Single cell design: optimized to work with a SLED RF pulse Splitter: to have a symmetric feeding system. Coupler design: based on the “new generation” of couplers proposed at SLAC for high gradient X Band structures (waveguide couplers) The design activity has been divided in three different parts THE C BAND STRUCTURE AND PROTOTYPE Previous the construction of the two TW sections, a prototype with a reduced number of cells, has been realized. The goals of this prototype were: -test all design and construction procedure -test the structure at high power at KEK (Japan) in the framework of a collaboration between LNF-KEK.

SINGLE CELL DESIGN Elliptical shape The structure has been designed as TW constant impedance (cells with equal radius) in order to: -simplify the fabrication -reduce the peak surface field when the structure is feed by a SLED pulse -reduce the unbalance between the accelerating field at the entrance and at the end of the structure, due to the combination of power dissipation along the structure and SLED pulse profile. The single cell has been designed: -exploring the different TW cell parameters as a functiion of the iris aperture (a), thickness (t) and ellipticity (r 1 /r 2 ). -combining the parameters with the real RF SLED pulse and calculating the maximum surface field, accelerating field,....

SINGLE CELL OPTIMIZATION The dimensions of the single cell have been optimized to simultaneously obtain: -lowest peak surface electric field on the irises with the SLED input pulse; -an average accelerating field of, at least, 35 MV/m with the available power from the klystron; -the largest iris aperture for better pumping, reduced wakefields contribution and reduced filling time of the structure (related to the breakdown rate probability). Safety value (V. Dolgashev) at least in X Band Reduction of the Attenuation Reduction of the magnetic field (pulsed heating) Elliptical shape

SINGLE CELL: FINAL PARAMETERS PARAMETERprototypeFinal structure Frequency (f RF )5.712 [GHz] Phase advance per cell 2  /3 Number of accelerating cells (N)2271 Structure length included couplers (L)0.54 [m]1.4 [m] group velocity (v g /c): Field attenuation (  ) [1/m] series impedance (Z) 34.1 [M  /m 2 ] Filling time50 [ns]150 [ns] Power E acc =35 MV/m36 [MW] E s peak /E acc 2.17 H s E acc =35 MV/m87.2 [kA/m] Pulsed E acc =35 MV/m<1 o C Average Accelerating field with SLED input pulse and after one filling time 60.2 [MV/m]51.6 [MV/m] Peak surface field with SLED input pulse at the beginning of the pulse (max MV/m) 140 (96) [MV/m] Energy gain (max 35 MV/m)23.2 [MeV]64.1 (42) [MeV] Output power 0.85  P in 0.60  P in Average dissipated 10 Hz with SLED pulse length equal to one filling time 7.6 [W]59.6 [W]

COUPLER DESIGN The design of the coupler has been divided in two parts: -the design of the waveguide coupler; -the design of the splitter. Advantages: -integrated symmetric feeding -low H field  pulsed heating -Better pumping Disadvantage: -multipolar field components (quadrupole) waveguide coupler splitter

COUPLER DESIGN: QUADRUPOPLE COMPONENT ANALYSIS Integrated quadrupole gradient in the first and second coupler (K eq ) as a function of the injection phase. In the same figure it is plotted the energy gain. The coupler is a compact transition between a rectangular geometry (the waveguide) and a circular one (the cavity). It introduces, in the waveguide region, multipolar field components. Due to the symmetric feeding of the system this components have an even periodicity with respect to the azimuthal angle. 

STRUCTURE REALIZATION V. Lollo

REALIZATION OF CELL AND COMEB Output coupler: Electro discharge machining Ra<1.2  m tolerances  20  m Input coupler cumputer controlled milling machine Ra<0.2  m tolerances  10  m Cells Turning machine “Shaumblain” Cell Ra<0.05  m tolerances  2  m Cooling pipes Tuning by deformation R. Di Raddo, V. Lollo

LNF The structure has been LNF in several steps: -Cells -Couplers -Final brazing Intermediate RF measurements have been done during realization Main problem during the realization: -alignment of coupler and cells in the final brazing process

LOW POWER RF MEASUREMENTS S 11 =0.078 (expected 0.005) S 13 =0.648 (expected 0.647) S 12 =0.641 (expected 0.647) Exciting from the load Exciting from the input coupler THE STRUCTURE WAS NOT YET TUNED

HIGH POWER TESTS AT KEK: OVERVIEW Control room C Band Klystron C Band test room X Band test room 1.5 months of high power RF test have been KEK

Prototype SLED HIGH POWER TESTS AT KEK: TEST AREA (1/2)

prototype loads Ionic pumps HIGH POWER TESTS AT KEK: TEST AREA (2/2)

PF=klystron output power STRUCTURE CHARACTERIZATION AT HIGH POWER

Construction of a NEW gun with some modifications from the electromagnetic and vacuum point of view with respect to the present SPARC gun: 2D DESIGN -elliptical iris profile -larger iris diameter -larger beam pipe aperture 3D DESIGN -tuners removal -rounded coupler slot -larger coupler slot S-BAND GUN: main modifications vs present gun -Reduction of the surface electric field -Better pumping -Bigger  -  /3 modes separation (short RF pulses) -Reduction of the surface pulsed heating -Better pumping -Higher coupling coefficient (  =2) (short RF pulses)

2D: Elliptical shape of the iris and larger iris diameter According to previous considerations on gun profiles (L. Faillace et al., SPARX-RF-07/001, 2007) -The iris diameter (2r iris ) has been increased up to 36 mm (in the current gun it is 25 mm). This allows shifting the  /3 mode of more than 40 MHz and also allows pumping better the half cell. -it has been adopted an elliptical shape of the iris with a ratio 2 between the axes (b/a). This allows reducing the surface peak electric field on the iris. -the iris thickness (2a) has been maintained to 20 mm (in the current gun it is 22 mm) -the beam pipe diameters has been increases from 25 mm (current) up to 36 mm a b r iris r pipe

ParameterValue Q0Q  f  -  /3 38 MHz P E cathode =120 MV/m 10 MW 2D: Final dimensions and parameters mm 20 mm 3 mm 4.5 mm mm 16 mm18 mm In the present gun the maximum peak electric field on the irises is times the field on the cathode. With the elliptical shape it decreases to about times the field on the cathode

3D: coupling coefficient choice Parametercoupling Small (  <1)large (  >1) Filling timehigherlower Multi-pole components introduced by the coupling holeLowerhigher Pumping speedLowerHigher t pulse =1  s; P  =1 =20 MW; P  =2 =16 MW; Final choice:  =2

3D: coupler design HFSS model Machining compatibility Rounded coupler for pulsed heating reduction:  T=60 o 120 MV/m; 2  s (Present gun>150 o C) Hot spot The strongly rounded coupler introduces multipolar field components (a factor two bigger than in the present gun).

GUN REALIZATION Our proposal is to realize the gun without brazing but with RF/vacuum gaskets. The advantages are: 1) Hard copper (not brazed) that gives BDR much lower than copper treated with brazing 2) The gun is much more easy to realize (backup solution: in case of problems the gun can be brazed) gaskets Electron beam welding A. Battisti, V. Lollo

TEST OF COPPER GASKETS -3 different gaskets/RF contacts have been tested to simulate the waveguide, the cells and the vacuum pump port. The gaskets have been successfully tested at different temperature (up to 250 C) with different thermal cycles. We are confident that this technical solution can be adopted prototype

C Band sections Activity MarAprMayJuneJulyAugSeptOctNovDecJanFeb Order Construction Tuning Installation Time schedule GUN ActivityMarchAprilMayJuneJulyAugSept Mechanical drawing Construction Tuning Installation