Workshop Goals and Preparation Lucas Taylor Fermilab Risk Manager LBNF / DUNE Risk Workshop for Far Site Conventional Facilities Fermilab, 31 st August.

Slides:



Advertisements
Similar presentations
Chapter 7 Managing Risk.
Advertisements

Guidebook for Risk Analysis Tools and Management Practices to Control Transportation Project Costs Keith R. Molenaar, PhD Stuart D. Anderson, PhD, PE Transportation.
Executive Session Director’s CD-1 Follow-Up Review of the APUL Project November 2-3, 2009 Dean A. Hoffer.
Simplified Risk Management Planning for A Risk Management Process Overview presentation, which should take about.
Chapter 7: Managing Risk
CEVP ® Cost Estimate Validation Process TEA Conference 2004 Jay Drye, P.E. Assistant State Design Engineer Monica Bielenberg, P.E. CREM Program Manager.
Project Risk Management. The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding.
Risk management process
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
NIST Special Publication Revision 1
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
Quick Recap Monitoring and Controlling. Phases of Quality Assurance Acceptance sampling Process control Continuous improvement Inspection before/after.
1 TenStep Project Management Process ™ PM00.7 PM00.7 Project Management Preparation for Success * Manage Risk *
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
Management & Development of Complex Projects Course Code MS Project Management Perform Qualitative Risk Analysis Lecture # 25.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Monitor & Control Risks 1 MEC-4. What is Monitoring & Controlling Risks? 2 » Monitoring & Controlling Risks is the process of: implementing Risk Response.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
Develop Project Charter
Agenda Interthink – 2003 Organizational Project Management Baseline Study –Industry Profile –Country Profile –Organization Size –Data On Schedule –Data.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
SOFTWARE PROJECT MANAGEMENT
Project Risk Management Planning Stage
Communications Management
Monitor & Control Risks 1 MEC-4. What is Monitoring & Controlling Risks? 2 » Monitoring & Controlling Risks is the process of: implementing Risk Response.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Enterprise Risk Management Lucas Taylor Fermilab Strategic Planning Workshop 4 – 5 November 2015.
Trigo White Ltd Practical project risk assessment VIII Conferencia Internacional Hotel Tivoli Oriente, Lisbon 28 th November 2014 Simon White Consultant,
Risk Management Lucas Taylor Fermilab Risk Manager 3 rd February Director's Review -- Risk Management L. Taylor, 3rd February 2016.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
CMS HL-LHC Detector Upgrades Project Planning Workshop, 26th – 30th Sept 2016, Fermilab Lucas Taylor Associate PM (for Cost, Schedule, Risk) Overview and.
Project Management PTM721S
Principal Investigator ESTCP Selection Meeting
Camera PDR/CD1 Planning 19 September 2008
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
7.4 Control Costs The process of monitoring the status of the project costs and managing changes to the cost baseline. Involves updating the project budget.
Chapter 7: Project Cost Management
EIA approval process, Management plan and Monitoring
Project Management W. J. Foyt
Establishing and Managing a Schedule Baseline
Risk Identification HL-LHC Detector Upgrades Project
11.3 Perform Qualitative Risk Analysis
Principal Investigator ESTCP Selection Meeting
Project Integration Management
Project Management Lifecycle Phases
TechStambha PMP Certification Training
ESB Networks AIP Programme
Project management 102 – PLANNING
Mastering Change Control
Project Charter I want to design a project
Management Breakout: MREFC Budget Summary Victor L
External Independent Review (EIR)
Risk Management Process (Revised)
Project Management Process Groups
Risk Update Workshop Introduction
NERC Reliability Standards Development Plan
Principal Investigator ESTCP Selection Meeting
Project Management Group
NERC Reliability Standards Development Plan
Define Your IT Strategy
CAD DESK PRIMAVERA PRESENTATION.
PROJECT MANAGEMENT WORKSHOP
Managing Project Work, Scope, Schedules, and Cost
Conventional Facilities
Second Avenue Subway Project Execution Strategy
Principal Investigator ESTCP Selection Meeting
Presentation transcript:

Workshop Goals and Preparation Lucas Taylor Fermilab Risk Manager LBNF / DUNE Risk Workshop for Far Site Conventional Facilities Fermilab, 31 st August – 1 st September 2015

Goals of the workshop … and soon after Capture in Risk Register all risks that might impact CF-FS scope 1.Risks that could have direct consequences for CF-FS 2.Non CF-FS risks that may indirectly cause delays to CF FS 3.General PM risks that might affect CF-FS (e.g. funding) Many risks already identified – focus on review / updates / completeness Quantify risk probability and technical, cost and schedule impacts –(Start to) rank risks to prioritize further analysis Determine strategies to cope with the risks –Risk mitigations: reduce likelihood / impact BEFORE risk occurs –Response plans: cope with consequences AFTER risk occurs Build MC risk model and perform risk analysis –Summary Schedule and (maybe) full resource-loaded schedule –Determine risk drivers, assess mitigations and responses –Determine cost and schedule contingency needs Lucas Taylor LBNF Risk Workshop2 During the workshop Capture main strategies in the workshop Flesh out details later: risk forms / MC model Capture main schedule links in workshop Work on detailed MC modeling after

LBNF / DUNE Risk Register Workshop will use the Fermi-standard Web-based Risk Register tool –Everybody can see latest risk data (top risks, by WBS, by RBS, etc.) –Note-takers (and PMs, facilitators, etc.) can edit / update the risk data –Risk Owners can see a list of their own risks –Risk Manager can export the risk data for use in the cost and schedule risk contingency analysis (using P6 and PRA) – soon after the workshop The data in the risk register is rather fresh – LBNF / DUNE risks were comprehensively assessed for the CD-1 Refresh and subsequently updated to include the L2 Risk Registers –124 open risks: 19 High rank, 44 Medium, 61 Low –23 on a risk watch list – to be revisited Lucas Taylor LBNF Risk Workshop3 I can summarize the latest status of the risk analysis in the opening session

Lucas Taylor LBNF Risk Workshop4 General links Workshop-specific LBNF people login:your-service-account Externals login:ippm-reviewer-01 (password will be sent to them)

Web Risk Register Lucas Taylor LBNF Risk Workshop5 To make it easier in the workshop, all LBNF / DUNE risks are being tagged according to their relevance to CF-FS Action (workshop participants): familiarize themselves with the existing risks before the workshop Action (LBNF): tagging needs to be finished a.s.a.p.

Web Risk Register Lucas Taylor LBNF Risk Workshop6 “Add new risk” Web form Big screen #1: Risk Register Note-taker will enter risk data in real time

Web Risk Register Lucas Taylor LBNF Risk Workshop7 Workshop should review and revise all the risk probabilities and impacts Risk Register data fields include all the required input to the subsequent risk Monte Carlo modeling

Web Risk Register Lucas Taylor LBNF Risk Workshop8 Schedule impacts refer to the LBNF / DUNE Primavera P6 “Summary Schedule” (as used for MC modeling for the CD-1 Refresh review) Big screen #2: Summary Schedule (and PPT slides, risk forms, other materials …)

Web Risk Register Lucas Taylor LBNF Risk Workshop9 Workshop needs to address Risk mitigations: pre-emptive actions to reduce the probability and impact of a risk BEFORE it happens. Such actions are included in the baseline plan. Risks responses: action plans that are executed AFTER a risk happens, to reduce the impacts. Cost and schedule implications of the response plans need to be included in the risk impacts. Soon after the Workshop Risk Forms: needed for all CD-3A risks to describe risk in more detail. Should (ideally) not duplicate any data that is already in the Risk Register.

Web Risk Register Lucas Taylor LBNF Risk Workshop10 Don’t forget to save frequently Impact on the overall project schedule (critical path) and schedule contingency analysis will assessed after workshop using the MC model

SPARE Lucas Taylor LBNF Risk Workshop11

Current Status of LBNF / DUNE risk analysis In response to CD-1 Refresh review, I updated the entire risk analysis with: 1.All 31 risks that were originally in the CD-1 Refresh analysis –With minor updates to a few of the risk impacts 2.Additional 41 risks that were previously only on L2 Risk Registers –These are now also in the main project Risk Register 3.Revised Summary Schedule with new logic for the new risk events –Thanks to Bob and Mohammed! MC analysis used all risks of High / Medium rank (for cost) or potentially High / Medium rank (for schedule) – final rank is an output of the analysis MC does not include Low rank risks –Sum (Probability * Cost Impact) ~ 2 M$ ( ~3 M$ of contingency at 90% CL) Lucas Taylor LBNF Risk Workshop12

Summary of LBNF / DUNE risks analysis Lucas Taylor LBNF Risk Workshop13 Risk contingency (at 90 % C.L.) CD-1 Refresh July 2015 Updated August 2015 Risk cost contingency (High / Medium rank risks) 53 M$ (31 original risks; full MC analysis) 68 M$ (31 original + 41 L2 risks; full MC analysis) Risk cost contingency (Low rank risks) Was not included 3 M$ (estimated; not full MC) Risk cost contingency (from burn rate) 29 M$31 M$ Risk cost contingency (Total, including High / Medium / Low ranks risks and burn rate) 82 M$102 M$ Risk schedule contingency1 year 5 months1 year 7 months

31 original CD-1R risks plus 41 newly-included L2 risks Top 20 cost risk drivers Lucas Taylor LBNF Risk Workshop 14 * New in MC analysis since CD- 1 Refresh DOE Review (previously on L2 risk registers) * * * * * * * * * * This allows for risk probabilities, the magnitudes of the impacts, the shapes of the impact distributions (single value, uniform range, or triangle function) and correlations.

31 original CD-1R risks plus 41 newly-included L2 risks –Mean: 30.4 M$ (original) and 14.6 M$ (new) –> 45 M$ –90% CL51.7 M$ (original) and 23.7 M$ (new) –> 68 M$ (CLs not additive!) Lucas Taylor LBNF Risk Workshop15 CD-1 Refresh was 53 M$ (at 90% C.L.) Risk cost contingency = 68 M$ (at 90% C.L.) Not including burn rate Risk cost contingency = 68 M$ (at 90% C.L.) Not including burn rate Probability distribution of total cost of risks

31 original CD-1R risks plus 41 newly-included L2 risks Top 20 schedule risk drivers Lucas Taylor LBNF Risk Workshop16 * New in MC analysis since CD- 1 Refresh DOE Review (previously on L2 risk registers) * * * * * * * * This allows for risk probabilities, the magnitudes of the impacts, the shapes of the impact distributions (single value, uniform range, or triangle function) and correlations.

“CD-4a Approval (Completion of CF at the Far Site)” including all risks 31 original CD-1R risks plus 41 newly-included L2 risks Lucas Taylor LBNF Risk Workshop17 Difference = 16 months CD-1 Refresh was 12 months Probability distribution of finish date for: “CD-4a Approval (Completion of CF at the Far Site)”

31 original CD-1R risks plus 41 newly-included L2 risks Lucas Taylor LBNF Risk Workshop18 Schedule contingency = 1 year 7 months CD-1 Refresh was 1 year 5 months (increase of 1.3 months) to ensure project is completed on time at 90% confidence level Difference = 18.7 months CD-1 Refresh was 17.4 months (increase of 1.3 months) Probability distribution of finish date for: “DOE Project Complete”

CD-3 “Ready for Construction” Lucas Taylor LBNF Risk Workshop19 Scope Assess completeness and quality of design specifications, whether bid packages are sufficiently clear and well defined, technology readiness to proceed, if any process is planned and its potential impact to the design Design Assess whether identified technologies are at sufficient level of maturity to be included in construction, sufficient cost and schedule for implementation are in the baseline, and the associated risks are captured in the Risk Registry. Assess whether any design activities to be performed during construction as appropriate as to type and amount of design to be performed, the design basis for this additional work, and the basis to proceed with construction. Cost and Schedule Determine reasonableness of resource loading, cost assumptions, and if any potential trends or planned changes are adequately identified to provide firm basis to proceed with construction. Assess whether the Critical Path is reasonably defined, reflects an integrated schedule with reasonable durations, and has a suitable lead between completion and CD-4. Document- ation Review and revise all documents to reflect relevant approved changes. Documents include ISM, HAR,QAP, PEP, PMP, AS, CMP, ProcMP … Ensure effective use of certified EVMS system and associated Project Controls and Change Controls Protocols

CD-2 “Performance Baseline” Although CD-2 comes later for LBNF/DUNE, we should nonetheless determine – already for CD-3a – the cost and schedule risk contingency at (Lab-standard) 90% C.L., as indeed we already did for CD-1 Refresh Lucas Taylor LBNF Risk Workshop20 Scope Work breakdown structure (WBS) encompasses all project scope and/or contractual scope requirements/work authorization defined to levels sufficient to support detailed cost and schedule estimates under formal change management procedures and configuration management. Design Is mature when a point estimate can be developed, can establish a high-quality, reliable cost and schedule estimate for a PB, and is ready for an independent review. See DOE O 413.3B, Figure 3, page C-6, Facility Design Maturity General Guidelines for CD-2. KPPs P rimary KPPs defined, understood, and agreed to by the AE, Program sponsor, and FPD, and forms the requirements of the prime contract. CostTotal Project Cost (TPC) established with 70-90% confidence level. Higher confidence level should be considered for changes to the PB. See DOE O 413.3B, page C-21. ScheduleProject completion date established with 70-90% confidence level. Higher confidence level should be considered for changes to the PB. Refer to DOE O 413.3B, page C-21. Document- ation All baseline documentations should be complete, approved by an appropriate authority, and effectively organized to enable traceability of supporting plans, assumptions, and analyses from the lowest to the highest level, and summary statement of the PB should be contained in the Project Execution Plan (PEP) or in the program requirements document (PRD) for NNSA projects.