Doc.: IEEE 802.11-12/1187r1 Submission September 2012 Clint Chaplin, Samsung ElectronicsSlide 1 802.15 Liaison Report Date: 2012-09-21 Authors:

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0990r0 Submission July 2014 Al Petrick, JPASlide Liaison Report Date: Authors:
Advertisements

Doc.: IEEE l2r IG-L2R September 2012 Clint Powell (PWC, LLC) Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /1546r0 Submission November 2014 Clint Chaplin, Samsung ElectronicsSlide Liaison Report Date: Authors:
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Doc.: IEEE /0197r0 Submission January 2016 Clint Chaplin, Imagicon Slide 1 Report on Date: Authors:
Doc.: IEEE Submission Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG8.
Doc.: IEEE Submission Myung Lee, CUNYSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission.
Doc.: IEEE m TG4mSlide 1 March 2013 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks(WPANs) Submission.
Liaison Report Date: Authors: September 2009
doc.: IEEE <doc#>
Liaison Report Date: Authors: January 2012
Report on Date: Authors: January 2015 July 2013
Liaison Report Date: Authors: November 2009
Liaison Report to Date: Authors: January 2012
January, 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Overview of TG4s Spectrum Resource Usage]
Liaison Report Date: Authors: November 2012
Submission Title: TG4m 4TV Closing Report for May 2013
Liaison Report Date: Authors: July 2008 July 2008
July 2014 doc.: IEEE /3/2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
July 2014 doc.: IEEE /3/2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
doc.: IEEE <doc#>
Liaison Report Date: Authors: January 2012
Liaison Report Date: Authors: July 2012
Liaison Report Date: Authors: January 2014 July 2013
Liaison Report to Date: Authors: March 2012
Liaison Report Date: Authors: September 2011
doc.: IEEE <doc#>
Liaison Report Date: Authors: May 2013
November 2010 doc.: IEEE < > November 2010
doc.: IEEE <doc#>
October 2011 doc.: IEEE ptc September 2012
Liaison Report Date: Authors: July 2011
Liaison Report Date: Authors: March 2011
Liaison Report Date: Authors: November 2013
Liaison Report Date: Authors: July 2011
Report on Date: Authors: March 2017 July 2013
Liaison Report Date: Authors: July 2009
Report on Date: Authors: January 2019 July 2013
Report on Date: Authors: March 2019 July 2013
Liaison Report Date: Authors: March 2012
Report on Date: Authors: July 2016 July 2013
Liaison Report Date: Authors: March 2011
Report on Date: Authors: March 2016 July 2013
Liaison Report Date: Authors: November 2011
Liaison Report Date: Authors: January 2012
Liaison Report Date: Authors: May 2014 July 2013
Liaison Report Date: Authors: September 2013
Report on Date: Authors: July 2018 July 2013
Liaison Report Date: Authors: March 2012
Liaison Report Date: Authors: January 2012
Liaison Report Date: Authors: May 2013
Liaison Report to Date: Authors:
Liaison Report Date: Authors: September 2012
Liaison Report Date: Authors: March 2014 July 2013
Submission Title: TG4m 4TV Closing Report for September 2013
Liaison Report Date: Authors: March 2010
Liaison Report Date: Authors: September 2010
Report on Date: Authors: July 2016 July 2013
Liaison Report Date: Authors: July 2010
Liaison Report Date: Authors: September 2013
Report on Date: Authors: January 2019 July 2013
July 2014 doc.: IEEE /24/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
Liaison Report Date: Authors: September 2010
Report on Date: Authors: July 2017 July 2013
Liaison Report to Date: Authors: January 2013
Liaison Report Date: Authors: November 2011
Liaison Report Date: Authors: January 2011
Report on Date: Authors: May 2019 July 2013
September 2012 doc.: IEEE < > September 2012
Report on Date: Authors: July 2019 July 2013
Presentation transcript:

doc.: IEEE /1187r1 Submission September 2012 Clint Chaplin, Samsung ElectronicsSlide Liaison Report Date: Authors:

doc.: IEEE /1187r1 Submission September 2012 Clint Chaplin, Samsung ElectronicsSlide 2 Abstract Liaison report on as presented to

doc.: IEEE /1187r1 Submission September 2012 Clint Chaplin, Samsung ElectronicsSlide

doc.: IEEE /1187r1 Submission September 2012 Clint Chaplin, Samsung Electronics Slide j MBAN First Recirculation WG ballot LB82 on IEEE j D2.0 closed August 4, Results: 109/5/ % 9 comments received: 1 technical, 8 editorial, 0 general Resolved all of the comments Second Recirculation WG ballot LB84 on IEEE j D3.0 closed September 13, Results: 114/2/ %. Subsequent vote changes give: 116/0/ %. 0 comments received. Attempting to get ExCom approval to go to Sponsor Ballot at the ExCom teleconference.

doc.: IEEE /1187r1 Submission September 2012 Clint Chaplin, Samsung Electronics Slide k Low Energy Critical Infrastructure Monitoring (LECIM) First Initial WG ballot LB83 on IEEE k D1.0 closed September 15, Results: 82/8/ % 280 comments received (did not ask voter to categorize comments into T/E/G) Resolved all of the comments Still need to incorporate comment resolutions into draft. Recirculation will start after editing done.

doc.: IEEE /1187r1 Submission September 2012 Clint Chaplin, Samsung Electronics Slide m TV White Space Heard five merged proposal presentations for baseline documents (FSK, OFDM,NB-OFDM, MAC, Ranging) Adopted baseline documents –FSK PHY Merged Proposal document –OFDM PHY Merged Proposal documents –Narrowband OFDM PHY Merged Proposal document –MAC Merged Proposal documents –Ranging Proposal document Heard two other presentations Discussion on future efforts and next steps –Hopefully go out to initial WG ballot in January 2013

doc.: IEEE /1187r1 Submission September 2012 Clint Chaplin, Samsung Electronics Slide n Chinese Medical Band Heard Presentations – n-summary-of-mban-applications – n-wireless-medical-application-examples-in- modern-chinese-hospital – n-detail-summary-of-interference-on-chinese- medical-bands – n-wireless-ecg-device – n-call-for-proposals – n-summary-of-applications-for-tg-4n Summarized the Applications Discussions about the interference in Chinese medical bands Drafted Call for Proposals; will be issued soon

doc.: IEEE /1187r1 Submission September 2012 Clint Chaplin, Samsung Electronics Slide p Positive Train Control 2 detailed technical proposals were submitted –DCN 508, “Proposal to Include 5 MHz of DSRC Band ( GHz) in p”, I Muftic, Parsons Brinckerhoff –DCN 521, “Final Technical Proposal for Train Control Communications”, M-C Doong et al, Lilee Systems Proposals Submitted Are Complimentary –Both should be able to merge without issues Merged baseline document available in November

doc.: IEEE /1187r1 Submission September 2012 Clint Chaplin, Samsung ElectronicsSlide Peer Aware Communications Presentations on Application Matrix & Technical Guidance Document (TGD) –Shannon Park (Samsung): Doc.0476r0, 509r2, 385r5 (TGD) –Huan-Bang Li (NICT): Doc r0 –Marco Hernandez (NICT): Doc r1, 533r0 –Seunggeun Jin (ETRI): Doc. 478r0, 350r3 (AM) Completed Application Matrix (AM) Discussed and modified Technical Guidance Document (TGD) Doc: 385r5 Expect to go out for initial WG ballot March 2014

doc.: IEEE /1187r1 Submission September 2012 Clint Chaplin, Samsung ElectronicsSlide Key Management Protocol Refine KMP Transport mechanism –Came to agreement on draft content Discussed security options –Decided this is an issue for individual KMPs in their guidelines and not for the general 15.9 mechanisms No funding for Technical Editor PANA over 15.9 presentation

doc.: IEEE /1187r1 Submission September 2012 Clint Chaplin, Samsung ElectronicsSlide 11 Ultra Low Power SG Finalized PAR and 5C

doc.: IEEE /1187r1 Submission September 2012 Clint Chaplin, Samsung ElectronicsSlide 12 Better Use of Spectrum Resources in WPANs IG Only meets at Plenaries

doc.: IEEE /1187r1 Submission September 2012 Clint Chaplin, Samsung ElectronicsSlide 13 THz IG Only meets at Plenaries

doc.: IEEE /1187r1 Submission September 2012 Clint Chaplin, Samsung ElectronicsSlide 14 L2R IG Determine the level of interest for a project on Layer 2/Mesh Under Routing and make recommendation to WG. Heard 4 Presentations – l2r cooperative-standards-efforts - Norm Finn – l2r-L2 Fwd for Embedded IP - Geoff Mulligan – l2r-intro-15-5-lowrate-mesh - Myung Lee – l2r-l2r-functionality-requirement - Noriyuki Sato Related Activities –Overviews heard on IETF, 802.1, ITU G.9956 –Liaison Volunteers for IETF, 802.1, TIA Tutorial –Outline Established –Volunteers for Authoring/Presenting

doc.: IEEE /1187r1 Submission September 2012 Clint Chaplin, Samsung ElectronicsSlide 15 WNG One presentation Secure Key Storage and True Random Number Generation ( wng0-secure-key-storage-and-true-random-number- generation.pptx) by Rene Struik

doc.: IEEE /1187r1 Submission September 2012 Clint Chaplin, Samsung ElectronicsSlide 16 References This document All Documents – Current draft is in the members-only area –  Members_Only_Area – members log in using username and password