The Groves Phase II ALR10AT51 Operated by: Foley Grove, LLC 2/24/15 Baldwin County Taken by: D. Denson
2 Drainage ditch to pond/basin not stabilized and/or protected. Pipe collar not protected. Sediment observed in drainage ditch.
3 Drainage ditch slopes to pond/basin not stabilized and/or protected. Pipe collar not protected. Sediment observed in drainage ditch and in pipe.
4 Clearing phase.
5 Drainage ditch slopes to pond/basin not stabilized and/or protected. Sediment observed in drainage ditch.
6 Construction entrance/exit to site over drainage ditch to pond/basin not fully protected. Pipe collars not protected.
7
8
9 Clearing phase.
10 Clearing phase.
11 Pond/basin slopes not fully protected. Vegetation not maintained.
12 Discharge point.
13 Clearing phase.
14 Vegetative buffer.
15 Vegetative buffer from canal/drainage ditch located right of this photo.
16 Clearing phase.
17 Vegetative buffer from canal/drainage ditch located right of this photo.
18 Clearing phase.