Enhanced Data Center Management (Aperture) Project Status David J. Ritchie CDO/Operations January 6, 2004.

Slides:



Advertisements
Similar presentations
Web Visualization Technology Horner APG Ver 1.0.
Advertisements

Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Cambodia-India Entrepreneurship Development Centre - : :.... :-:-
Installing software on personal computer
Learner Modelling in a Multi-Agent System through Web Services Katerina Kabassi, Maria Virvou Department of Informatics, University of Piraeus.
MD-EXPERT Designed with doctors for doctors. One solution for multiple platforms
Internet Service Provisioning Phase - I August 29, 2003 TSPT Web:
Integrating Educational Technology into the Curriculum
Project 2003 Presentation Ben Howard 15 th July 2003.
Copyright © 2004 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS6th Edition Irwin/McGraw-Hill.
Building Control System (Metasys) Project Status David J. Ritchie CDO/Operations March 18, 2003.
Staff Assessment Technology Services Department Palmyra Area School District.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
1 Intended use of this Presentation This presentation is for the client Executive contact to use with their internal Enterprise eTIME Project Team. The.
Network and Server Basics. Learning Objectives After viewing this presentation, you will be able to: Understand the benefits of a client/server network.
Manage your projects efficiently and on a high level PROJECT MANAGEMENT SYSTEM Enovatio Projects Efficient project management Creating project plans Increasing.
The next big thing from Boyum IT
System SOFTWARE.
Dr. Ir. Yeffry Handoko Putra
Client/Server Technology
Architecture Review 10/11/2004
SP Business Suite Deployment Kick-off
Introduction to Visual Basic. NET,. NET Framework and Visual Studio
Chapter 6: Securing the Cloud
The Components of Information Systems
Training on Power Monitoring and Management Solution
Manufacturing Productivity Solutions
Information Systems Development
Quality Assurance System Field Service Automation
Netscape Application Server
1.2 The Network Edge Beginning at the edge of a network we are looking at the components with which we are most familiar - namely, the computers that we.
Facility Portal and Work Order Manager
Leveraging the Cloud: A New Way of Managing Testing
CHAPTER 3 Architectures for Distributed Systems
Top-Down Network Design Chapter Nine Developing Network Management Strategies Copyright 2010 Cisco Press & Priscilla Oppenheimer.
Migrating Oracle Forms Using Oracle Application Express
Test Administration & The TA Sites.
#01 Client/Server Computing
How to register and use ODMAP for Fire/EMS and other partners
Information is at the heart of any University, and Harvard is no exception. We create it, analyze it, share it, and apply it. As you would imagine, we.
Unit 27: Network Operating Systems
The Components of Information Systems
NDSA Online Assessment Training 2016
E-NOTIFY and CAER OnLine Training
Chapter 12: Automated data collection methods
Crowd Intelligence Grocery Shopping Mobile App
Pack Your Park by Modernizing Your Business Online
Measure E Technology Update
InLoox PM Web App product presentation
Model-View-Controller Patterns and Frameworks
Introduction to Databases Transparencies
Network Media, models and number systems
Inhalt Project Management in your browser Your Workplace on the Web
Systems Analysis and Design
GENERAL SERVICES DEPARTMENT Facilities Management Division PROOF –NM (Process Reengineering & Optimization of O&M Functions for New Mexico) Phase II.
Pack Your Park by Modernizing Your Business Online
Purge-it! USP's, pre-sales process & helping the customer to decide
Healthcare Technology Management Solution
Enterprise Program Management Office
Quality Assurance System Field Service Automation
Planning and Storyboarding a Web Site
Background: Currently CCP4i puts each structure determination into a separate project directory, and automatically keeps a “Project History Database” recording.
Technology Department Annual Update
Computing Essentials Module 1.
Information System Building Blocks
Computing Essentials Module 1.
#01 Client/Server Computing
Product Overview.
WORKSHOP Establish a Communication and Training Plan
Top-Down Network Design Chapter Nine Developing Network Management Strategies Copyright 2010 Cisco Press & Priscilla Oppenheimer.
Presentation transcript:

Enhanced Data Center Management (Aperture) Project Status David J. Ritchie CDO/Operations January 6, 2004

Present Approach Provides… Smart Pictures Product from Aperture. –A GUI I/F to a space management database. –Easy RW accessibility for a single individual (Phil Lutz). Some web capability as in: –

Shows A Variety of Information Data Communications Wiring Power Grid Cable Trays Relay Racks System Assignments (KTEV, CDF, DZero)

A Data Comm Example

A Floor Example

But Difficulties… Hard for RW use by multiple individuals. No rack view – plan view only. No work flow – updates via unstructured , post-it notes, or worse. Maintained separately from Equipment Database.

The Argh Experience

The Solution - 1 Upgrade to VISTA product from Aperture. –Web Access for multiple users (less Argh!). –Rack View – essential when it takes ½ hour to really view it. –RW access for designated individuals.

The Solution - 2

Tasks – 1 Web enable existing Aperture product. Continue assigning of space by CDO/Operations. Introduce provisioning, recording of use/connectivity of the assigned space by designated individuals in other CD Departments.

Tasks – 2 Implement equipment install workflow. Interface to existing MISCOMP Equipment Database. Provide a locator service for alert software, e.g.: –NGOP – show a floor, area, and rack display. –MetaSys – break out equipment according to circuit. –Remedy – locate failing equipment targeted by user report.

Issues Internet Explorer only for full functionality (not clear how limited for other browser) …?

Project Timeline and Scope Three phases: –Web access –Work flow implementation –EquipDB interfacing Three scoping options: –HDCF –HDCF and NML –HDCF, NML, FCC Data Centers, WH7SW(?)

The Matrix Notes: 1.Annual Maint. = 18% 2.Sq. ft. ($9.18 to $3.99) 3.Prof. Svcs. $9K/wk+T/E HDCF (4K sq. ft.) HDCF & NML (8K sq. ft.) HDCF, NML, FCC, WH7SW (29K sq. ft.) H/W (2 PC’s, IIS, SQL Server) ~$6K Web Access$36K$58K$115K (10% disc, 8K sqft “incentive”) Web Access & Workflow $159K (8K sq. ft. “incentive”) Prof. Services (Inst: 2d, Train: 8d, Prep: 2d) $28K 2 Weeks $28K 2 Weeks TBD (Non-self-install: 5-9 Weeks ~$45K-$85K) EquipDB I/FTBD

A Middle Strategy Stay within budget by. Delaying workflow and rely on designated individuals. Adopting middle scope which allows self-install in a clean slate.

Phase 1 Implement web accessible plan and rack view for the scope selected. Provide: power route (device to panel). networking route (board to switch). People: Phil Lutz, Designated CD Department tracking individuals.

Phase 2 Implement work flow piece so that separate CD organizational units of the CD can record their actions with more parallelism. People: Phil Lutz, David Ritchie, Designated CD Department install individuals.

Phase 3 Interface the Miscomp equipment database and the Vista database together so that relevant updates to one will be populated in the other and vice versa. People: David Ritchie, Phil Lutz as required. 1 FTE for 3 months from Database Systems Group. Aperture or other consultant.

Case Study: Target - 1 Yes, the retail store. –Four Data Centers ~ 90,000 sq. ft. –Strong support from CEO on down for way of doing business (“regulated access”). –A stringent need in their business for stability and reliability. Vista product - since v1.0. –Mainly interact through Equipment Install part. –Other (Eq. Move, Dispose, Change) too generic for their particular business processes.

Case Study: Target - 2 Very happy and positive on the core product Should expect to have to adapt the generic out of the box processes to our specific circumstances Amazing in what it let’s them do –50,000 network paths –3,000 power breakers

Case Study: Target - 3 They have locked down their data center; no one enters it w/o having registered their request through the appropriate form. Started at the time they built a new data center –Defined policies and procedures by which changes were to occur. –Track access through the Vista product. It’s very easy. Recommendation: get the individuals involved to define the processes

Case Study: Target - 4 Prior to Vista, they were running the place without defined processes. –Random people would put in devices. –Networking as a separate group. –People with devices to install making independent phone calls to the networking people. –To get Vista off the ground, Facilities Planning partnered with the Networking Group.

Case Study: Target - 5 Two people spent two days defining high level processes: –Who provisions what. –Who does what. –Avoided getting into nitty-gritty (I.e., specific fields). –Sat with “platform owners” and worked out specifics of processes.

Case Study: Target - 6 Aim was to have web forms. –not too difficult to fill out. –Reasonable balance with regard to data collection versus utility of info. Presently, their system works to the level of dropping symbols onto a drawing as a way of recording the installation. 70 – 80 installs/month.

Case Study: Target - 7 Knows no other products that do this level of data center tracking Others are too CAD-like and therefore more labor-intensive and less flexible

Case Study: Target - 8 Fall 2001: approached Aperture in with idea of implementing equipment install on top of Smart Pictures. January 2002: testing and development May 2002: Opened Data Center June 2002: Went production Another 6 – 8 months: shaking it down.

Market Analysis An afternoon with Google. Examined several products. –Either CAD-oriented. –Forms and “note card” oriented. –Little graphical and flexible.