WP 6A Workshop Baseline scenario Functional Unit Existing/potential industrial networks
Workshop high-tech sectorWorkshop construction sector Tony CurranIan Williams Simon KempAndré Tischer Gerhard KastWesley Crock Claudia LuepschenAndreas Goetz Michael HeldAlexandra Gartmann Richard PeagamMichael Wolf Bernd KopacekWells Lin Angela TingFrank Becker Andreas MiddendorfNatalia Soldevilla Johannes DietrichThomas Nittka Matthias WabbelsStewart Hickey Colin FitzpatrickVera Durão Lutz ScheidtAlexandra Saraev Tim WoolmanMartyn Lambourne Phil WildingRenato Orsato Maria BesiouChristophe Jehoulet Clémence SiretPaul Maher Jose OspinaOriol Collell Ignasi LeonSixto Arnaiz Maitane Gallo
Functional units – laptop - examples Production of one laptop, technical specifications: –processor 1.6 GHz – 1 GB RAM –hard disk with 160 GB –etc.? Laptop use for 4 year (specifications as above)
Functional units – PV system - examples 1 kWh produced provision of electricity for a one family house (grid connected or off-grid)
Functional units - ReUse Network examples one end of life computer for handling (reuse/repair/dismantle/dispose) (given type of a computer, or an European average EOL computer?) one recovered computer for reuse prolongation of computer lifetime by one year
Waste streams from LCD production
Silicon and integrated circuits (IC)
PV modules – wafer cleaning