Case Study 2 D4R PV System TRAMA TECNOAMBIENTAL, S.L. Ignasi León, TTA ZeroWIN Vision Conference Thursday 8th July 2010, Southampton, UK.

Slides:



Advertisements
Similar presentations
Interfacing Risk and Systems Engineering – Left Shift Risk Management
Advertisements

Make Commitment Milestone 1 Inventory Emissions Milestone 2 Set Target/Goal Milestone 3 Establish Local Action Plan Milestone 5 Monitor/Evaluate Progress.
Presented By Dr. Yousef Alyousef Energy Research Institute
Practitioners Network “Thematic Group on Climate Change, Energy Efficiency and Renewable Energies” Carbon Footprint Methodologies for Development Projects.
Carbon Footprint / Life Cycle Analysis September 29, 2009.
Rational Unified Process
Unit Slides by UK Versity.  Unit aims:  This unit aims to help the learner with an opportunity to develop their project management and research skills.
Life Cycle Analysis and Resource Management Dr. Forbes McDougall Procter & Gamble UK.
………………………. A perspective of life cycle thinking We believe in decision making based life cycle thinking. It results in: -no trade-offs in life cycle phases.
Workshop on Infrastructures Sustainable Infrastructure for Efficient Mobility: the Key Challenges Luc Bourdeau ECTP Secretary General Industrial Technologies.
Sustainability in the MOD IEMA Conference 2011 Dr Jon Freeman Sustainable Procurement Strategy.
DG Environment Green Public Procurement in UK Green public procurement (GPP) - Lead the change National Conference Barbara Morton 08 April 2010 Vilnius,
HE carbon reduction strategy Climate Solidarity Conference 25 November 2009 Andrew Smith Head of Estates and Sustainable Development.
Water Performance of Buildings A study being conducted for DG ENV by Bio Intelligence Service in cooperation with BRE and ICLEI Water Resource Efficiency.
Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG Barcelona May DISPOWER Distributed Generation with High Penetration of Renewable.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Green ICT activities of TTC & ITU-T toward low-carbon society Yoh SOMEMURA TTC, Prime PSO for ICT.
LIFE CYCLE ASSESSMENT IN AGROINDUSTRIES DIRECTORAT GENERAL FOR POLLUTION CONTROL AND ENVIRONMENTAL DEGRADATION.
LIFETIME ENGINEERING of Buildings and Civil Infrastructures Thematic Network LIFETIME in figures: Working period: 1/6/ /5/2005 Participation: 96.
National Reports An Example Roel Lanting (TNO). What was the question? National indicators and frameworks Indicators with national acceptance Other indicators.
Object Oriented Design and Analysis Rational Unified Process.
NEW VISION OF ENGINEERING ECONOMY COURSE (VISION) MODULE 3 LECTURE 1-2 Cairo, 13 July 2005.
The LOGICAL FRAMEWORK Scoping the Essential Elements of a Project Dr. Suchat Katima Mekong Institute.
Comparing Electricity Technologies ‘98 US Electrical Consumption ‘98 US Electrical Consumption 3.6 million Gwh e 35% of US Primary Energy.
Life Cycle Analysis of energy systems used in residential buildings Manoudis Alexandros Supervisor: Dr. Anastaselos Dimitrios SCHOOL OF SCIENCE & TECHNOLOGY.
CESI Barcelona May 2003 R.BERTI IT Session 1 – Block 2 1 Product Environmental Profile and Benefits for Electrical Utilities R. Berti CESI.
1 Responsible Care Partnering Workshop Industrial Waste Initiative 24, 25 September 2013 Manal Al Badawi On Behalf of the Industrial Waste Sub-Committee.
Overview of the NSF 375 Draft Sustainability for the Water Treatment and Distribution Industry October 30, 2012.
Life Cycle Environmental Impact Assessment of Nuclear Power Saadia Ansari 2 nd Year PhD School of Chemical Engineering and Analytical Science, University.
1 Berlin - 17 May 2003 THE CITY OF TOMORROW AND CULTURAL HERITAGE Berlin, 17 May 2003 Dieter H. HenzlerSteinbeis-Transfercenter Cultural Resources Management.
Federal Aviation Administration NextGen Environmental Management System (EMS)
© Module 4—Hazard Prevention and Control Safety Management Worksite Analysis Management Commitment and Employee Involvement Hazard Prevention and.
S. SOURD / M. LAURAIRE - FR- Invited - Alpha 1 - Block 3 Barcelona May Environmental consideration in product design proactive commitment.
Defra’s Research in Sustainable Agriculture Dr Sue Popple.
Embedding Carbon Management within Public Sector Organisations 17 th November 2015.
International Telecommunication Union Guidelines for Environmental Sustainability Standard for the ICT Sector Daniela Torres Chapter 6 General Specifications.
Input requirements for WP7 Andreas Pertl Gudrun Obersteiner Silvia Scherhaufer Peter Beigl 3 rd General Meeting 5 rd - 8 th July 2010 Southampton.
Austrian Society for Systems Engineering and Automation ZeroWINZeroWIN Towards Zero Waste in Industrial Networks Coordinator: SAT 31 partners from 11 countries.
How IT Transition can feed green growth and energy transition through innovation 25th MAY, 2016 Masaaki Yamamoto New Energy and Industrial Technology Development.
Sustainability in the Supply Chain 5 © 2014 Pearson Education, Inc. SUPPLEMENT.
Human-mimetic approach to the integrated monitoring, management and optimization of a symbiotic cluster of smart production units Project Coordinator:
BioEnergy Sustaining The Future 2 BESTF2 Briefing Event 11 th December 2013 Dr Megan Cooper, BESTF co-ordinator.
Testing throughout Lifecycle Ljudmilla Karu. Verification and validation (V&V) Verification is defined as the process of evaluating a system or component.
Overview and Update E7A Renewal Project. Exterior View E7A Renewal and Atrium Link to E7B.
Southampton (United Kingdom), 5th-8th July 2010 Southampton, 5th-8th July 2010 WP5. Zero Waste Entrepreneurship: Production Model.
1 Chinese Taipei’s DfE Practices Ray Y. B. Reu Center for Environmental, Safety and Health Technology, ITRI.
Baseline Andreas Pertl Gudrun Obersteiner Silvia Scherhaufer Peter Beigl 3 rd General Meeting 5 rd - 8 th July 2010 Southampton.
Making the Photovoltaic Industry ‘Double Green’ ZeroWIN Conference July 6th 2010, Southampton.
University of Belgrade-Faculty of mining and geology
Sustainable Future – Trends and Reality
Mitigation Targets and Actions under Sierra Leone’s NDC
CEF Action n° 2016-EU-SA-0009 "CYnergy"
NC AWWA-WEA 97th Annual Conference
Sustainability and the Built Environment
Ian Williams & Tony Curran
What role can Life Cycle Assessment play in the selection of green construction materials? N. L. AMPOFO-ANTI © CSIR
Clemens Schneider, Wuppertal Institute
DOE Data Center Energy Efficiency Program and Tool Strategy
Urban Pathways Conference
Commercial Refrigeration Trends and challenges for RECS
Thembi Kodisang-Sibanda
Building Efficiency Accelerator
Cañada College Sustainability Plan Past… Process/Structure…Goals..
Overall Project RAG Status
SCP in the 7th Environmental Action Programme
MEthane activation via integrated MEmbrane REactors
BIOSURF inter-association workshop Stefan Majer, DBFZ
Eric Peirano, Ph.D., TECHNOFI, COO
Cañada College Sustainability Plan Past… Process/Structure…Goals..
Content. Content Performance indicators based on the 3 pillars of sustainability.
How to tackle air pollution
Presentation transcript:

Case Study 2 D4R PV System TRAMA TECNOAMBIENTAL, S.L. Ignasi León, TTA ZeroWIN Vision Conference Thursday 8th July 2010, Southampton, UK

1. PV System Hitech – Construction Energy-production facility –Cost of energy (CoE) –Reliability –Safety –Availability of energy –Power Quality End product: Energy

2. The task Concept design (WP6A) + Prototype or demonstration (WP6B) for: PV system Component focus: power conditioning equipment In applications: With energy storage (i.e. “stand-alone”) Without energy storage (i.e. “grid-connected”) = 2 concepts + 2 prototypes + 2 demonstration systems

3. Scope Strict interpretation of project scope

4. Goals End goals: -30% reduction of GHG emission -70% minimum reuse of waste -75% reduction in fresh water use How? -Component life extension -D4R criteria in system / component -Symbioses with other industries -Performance Ratio optimisation in system /component * Performance Ratio Usable Performa nce Ratio (PR) Losses Performance Ratio Usable Performa nce Ratio (PR) Losses Performance Ratio (*decreasing energy intensity of production process)

4. Baselines Some considerations for establishing baselines Impact evaluation results are linked to: -Developed / undeveloped area -User training & load profile (production conditions) -Solar resource & ambient conditions - Scenarios with different baselines (and process) - Benchmarking against baseline must deal with project-specifics.

5. PV System Scenarios Parallel work lines with specific: -Baseline -Process model -End result assessment Developed area + without energy storage Developing area + with energy storage Developed area + with energy storage

6. How to achieve the goals (1) Technology type Stakeholder dialogue for - D4R - Industrial networks System optimisation (PR)

6. How to achieve the goals (2) Materials D4R Industrial networks

6. How to achieve the goals (3) EOL return Design - D4R - Industrial networks - Life extension - Component optimisation System optimisation (PR)

6. How to achieve the goals (4) EOL return Design - D4R - Industrial networks - Life extension (system design) System optimisation (PR)

6. How to achieve the goals (5) Technology type Stakeholder dialogue for - D4R - Industrial networks

7. Are we in control to achieve the goals? In Red: only possible if operation in scope GHGReuse of waste Fresh WaterIndustrial networks PV System -Structure -PV Type -System Optimisation -Repairability -Life extension -Structure -Battery? -PV? - BoS? -Repairability -Structure -Battery? -Life extension -Structure -Battery? - PV? Power Conditioning -Initial negative impact! -System Optimisation -Repairability -Life extension - Design -Life extension -? -Life extension - Design

8. Work plan - Tasks

Questions Comments … Thank you for your attention TRAMA TECNOAMBIENTAL, S.L. Avda Meridiana, 153 baixos Barcelona Tel: Fax: Ignasi León, TTA

Backup 1 – PV System LCA In the following figure the contribution of the main life cycle phases for selected PV systems are shown.  The construction phase is absolutely the main contributor to the impacts (mainly due to the energy requirements of the upstream processes related to the production of silicon and PV wafer).  Minor contribution comes from Dismantling  Operation and fuel have no effect,as expected Source: Project NEEDS (New Energy Externalities Development for Sustainability Year:2006 NEEDS Project

Backup 3 – PV System Process w/ batteries in developing area

Backup 4 – PV System Process wo/ batteries in developed area