GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester17.+ 18. November 2014 GSI Helmholtzzentrum für Schwerionenforschung GmbH.

Slides:



Advertisements
Similar presentations
GSI Helmholtzzentrum für Schwerionenforschung GmbH Platforms and Infrastructure Collaboration meeting GSI-CERN
Advertisements

Peter Spiller, IHEP, Protvino GSI, Peter Spiller IHEP FAIR in kind Contributions.
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Sergey Kozub Institute for High Energy Physics Protvino, Russia SIS300 meeting 19 March, 2009 Sergey.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
GSI Helmholtzzentrum für Schwerionenforschung GmbH Status of Super-FRS Construction M. Winkler CERN-GSI Technical Coordination Meeting.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
GSI Helmholtzzentrum für Schwerionenforschung GmbH LINK EXISTING FACILITY I n order to prepare the existing GSI accelerator facility (mainly the SIS18)
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
Spreaders & Recombiners Beam Transport Michael Bevins May 30, GeV Upgrade - Beam Transport Spreader/Recombiner Dipoles and Layout, & Installation.
TE-CRG Activities D. Delikaris, TE-CRG.
GSI Helmholtzzentrum für Schwerionenforschung GmbH FAIR Proton Linac Status and plans with France GSI Helmholtzzentrum für Schwerionenforschung GmbH
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
O. Kester, 11 th MAC meeting, Darmstadt, Status project planning and procurement O. Kester 11 th FAIR - Machine Advisory.
O. Kester, 8 th MAC meeting, Darmstadt, Towards a resource loaded schedule Status of project planning and procurement O. Kester 8.
O. Kester, NuSTAR annual meeting, 27/02/2013
Contents: -GSI organization structures -Tasks of GSI (accelerator) -Status of evaluations / technical developments -Overview -Note : (only) accelerator.
Delivery of FAIR In-kind items (feedback from India) Subhasis Chattopadhyay VECC-Kolkata & BI-Kolkata.
O. Kester, 10 th MAC meeting, Darmstadt, Status O. Kester 10 th FAIR - Machine Advisory Committee Meeting.
Peter Spiller MAC meeting Time Schedule SIS100 1.
Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.
Common Systems – Holger Kollmus Holger Kollmus FAIR - Machine Advisory Committee Meeting Common Systems and Controls.
GSI Helmholtzzentrum für Schwerionenforschung GmbH Super-FRS multiplet field.
ELENA installation progress F. Butin / ELENA collaboration.
GSI Helmholtzzentrum für Schwerionenforschung GmbH Super-FRS magnet configurations.
Peter Spiller, November 2012, Structure and Tasks of the Project Division Primary Beams Peter Spiller Machine Advisory Committee Meeting.
O. Kester, 6 th MAC meeting, Darmstadt, 10/10/2011 FAIR ACC planning and schedule O. Kester 6th FAIR - Machine Advisory Committee Meeting
The Super-FRS Multiplet, Magnetic and Cryogenic requirements
WP High Beta Cavities Delivery
Preparation Phase of the FAIR Project
Status of the FAIR Project
The Status of the CBM Experiment
High energy beam transport.
Oleksiy Dolinskyy December 1st, 2014
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
Beam diagnostics from GSI
Status of HESR 18th March Gießen Dieter Prasuhn.
Procurement, Measurement and Installation of 2 Octupoles for ATF
CSP 25th November 2010 Technical agreement number 3: overview
Testing of SC Magnets Status - November 2010
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
FAIR ACCELERATORS Peter Spiller EMMI workshop
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
(Procurement, testing of magnets)
REPORTS BY NEW PROJECT DIVISION HEADS: “Rare Isotope Beams”
EFREMOV INSTITUTE SAINT PETERSBURG RUSSIA
Status of the PANDA Magnet
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
Status of the PANDA Solenoid Magnet Production in BINP
ELENA Magnet Installation Planning
PERMANENT MAGNET QUADRUPOLE FOR THE LINAC 4 CCDTL
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
Status of the PANDA Solenoid Magnet Production in BINP
Daresbury ESS In-Kind Contributions
Ch. Boccard, M. Krupa, G. Schneider, R. Veness, M. Wendt
Budker Institute of Nuclear Physics,
Bunker Project Schedule/Budget
East Hall under construction
Presentation transcript:

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 GSI Helmholtzzentrum für Schwerionenforschung GmbH Status project planning and procurement O. Kester 12 th FAIR - Machine Advisory Committee Meeting

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 Outline 1.Some technical highlights 2.Project management and planning 3.Quality assurance Outlook 2

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 Production of SIS100 Dipoles  Production of SC-wire and cable production are ongoing  UHV-vacuum chamber ready for cold tests  Production of the FOS is not according to specs! New production plan  implemented for 2. pre-series dipole (Talks of P. Spiller and E. Fischer) 3 Image: pre-series dipole chamber [P. Spiller]

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 Cryo-plant of the Series Test Facility (STF)  Civil construction including media supply is ready  Cryo components are installed  Commissioning starts in Dec  STF ready for testing in spring SH5 November 2014 [H. Kollmus]450 kW compressor 1.5 K cold box

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 Test Benches of the STF m² floor space for preparing and testing 4 independent test benches for a performance of 1 magnet per week Space for the SIS100 string test

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 SIS100 Quadrupole Modules (QDM) 6 Module with QP, chrom. SP, BPM Doublet with Cryo-Catcher module Functional elements installed in common girder  talk of S. Kostromin

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 SIS100 QDM Tests JINR, Dubna Infrastructure at JINR in preparation m 2 main hall 700 m 2 auxiliary facilities Contract on QDMs JINR-GSI in preparation

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 Status HEBT I Magnets :  Batch 2 - specifications released, draft version contract sent to EFREMOV Institute and Budker Institute  Batch 3- specifications prepared; specs ready for EDMS approval until Q4/2014  Batch 1 - manufacturing of tooling and purchase of materials for pre- series dipole magnets started, first coil produced by EFREMOV  Delivery of pre-series dipole magnets dip1s_0 and dip13_0 and vacuum chambers Q1/2015 Coil Assembly of Pre-Series (Batch 1) 8 [F. Hagenbuck]

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 Yoke Steel: Purchase of Materials for HEBT Copper conductors Tooling for compression and impregnation of coils [F. Hagenbuck] 9

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 Status HEBT II Power converters:  First In-kind contract with India (Bose Institute, producer ECIL – Electronics Corporation of India Limited) for quadrupole power converter (78 pieces) of 18/13 Tm beam lines signed.  2nd draft of CDR for pre-series power converter received Spulen des Vorserien-Magneten (Batch 1) 10 Beam Instrumentation:  Procurement of Bose Institute (India) 66 diagnostic vacuum chambers  Contract of Slovenian In-kind ready for signing (DAQ, pneumatic drives and controls)

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 Beam Instrumentation Scintillating Screen:  A new, fully FAIR-conformal system for standard scintillating screen based beam diagnostics including digital image acquisition, remote controllable optical system and mechanical design commissioned with beam  CUPID (Control Unit for Profile and Image Data) is based on the Front-End Software Architecture (FESA) to control beam diagnostic devices. 11 [M. Schwickert]

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 Super-FRS Multiplets Combination of quadrupoles, sextupoles, steerers, and superimposed octupols  25 long- and 8 short multiplet units Procurement Status:  Assigned as German In-kind contribution  Specifications completed  Tendering running, several offers received  Contracting planned for the end of 2014  length: up 7 m  beam axis height: 2 m  iron dominated, cold iron (up to 40 t)  common helium bath  warm beam pipe (38 cm inner diameter)  per magnet 1 pair of current leads  max. current < 300A for all magnets 12 [M. Winkler]

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 Super-FRS CERN  Layout of planned test facility at CERN (building 180) ready  Cryogenic-infrastructure with 2 pre-cooler  CERN Controls and data acquisition  3 test benches in Q1/  Talk of P. Schnizer

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014  Specifications for Procurement under Preparation by CEA (Saclay, France)  PDR completed  Tendering start planned for December 2014 via FAIR GmbH  Branching dipole are not yet included  option Super-FRS SC-Dipoles 14

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 Super-FRS Developments Slit system: Collaboration with KVI-CART in Groningen (NL) GEM TPC test set-up Alignment radiation resistant magnet 15

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014  ECR proton source and LEBT under construction at CEA Saclay  4-vane RFQ development  discussion on collaboration with INFN-Legnaro  Copper plating of the prototype CH-cavity  Talk of W. Vinzenz Status on the proton-LINAC 16

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 Status of the CRYRING installation  Installation at GSI started  Completion planned for summer

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 Outline 1.Some technical highlights 2.Project management and planning 3.Quality assurance Outlook 18

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 FAIR ACC Project Structure 19

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 Proposed line management structure 20

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 Major Milestone Plan 21 Sept Aug FAIR Building Milestones 2012

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November  M11 in month * * Corrections in planning March 2021 Febr Major Milestone Plan Drees&Sommer estimates from June 2014

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 Status personnel (MSP) 23 FTE-numbers per year: Required resources from MS-Project planning  Required personnel (FTE) construction and operation (DreSo data 06/2014)  Profile for required FTEs is significantly flatter with a maximum in 2016  Only 509 FTEs become effective in Effective resource needs 2014: 581 FTEs 509 operation lead average FTE / year estimates 2012

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 No. of FTEs in FTEs: actual numbers from HR  No. of FTEs still below the requirements  The proposed stop of recruitment from GSI management will lead again to a large gap in man power. permanenttemporary students from MS-project 24

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 Milestone Trend Analysis (MTA) update start of milestone tracking 25 Milestones: M4 – Contracts closed, M81 – Series Production started M10 – Component Ready for Installation M102 – Component Assembled and Aligned M11 – Component accepted without beam

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 Major milestone trends Machine Delta since June 2013Delta since June 2014 SIS10021 HEBT0-2 SFRS31 pLINAC-1,54,5 pbar2,50 CR64 HESR-- CS-0,5 SIS1800 UNILAC1,5 Relative change of M11 since June 2013 in quarters (refers to FAIR building timeline 2012)  Successful, extensive beam time and lack of manpower provoke delays  New estimate of building time line requires a major revision of the planning 26 [W. Bayer]

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 Status of Specifications Offen Draft in internem Review Draft im Freigabe- prozess Freigegeben Technical Guideline 3 (-1) 0 (+0)12 (+4)174 (+0) Common Spec.12 (+1)8 (+0)3 (-2)20 (+1) Detailed Spec.261 (+ 20)10 (+0)54 (-1)89 (+13) Total276 (+20)18 (+0)69 (+1)283 (+14) Status: : (Numbers is brackets indicate the difference compared to ) 27 [G. Hickler, P. Busch]

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 Progress of Specs and Orders availability of released specs [number] 09/ / GSI in-kind for FAIR: Orders placed > 500 k€ [number] / /

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 Configuration Management Systems Configuration:  Ongoing rollout of change management process  Experiment requirements are recorded, currently in coordination with MPLs and will be maintained in CDB Component Database (CDB):  Content of the component groups is gathered according to the defined basic structure of the database, supported by 2-3 external FTE Perspective CDB 2014/2015 with the above mentioned resources:  Q4/2014  nc magnets, sc magnets and power converters  Q1/2015  Electrical power data (FAIR S&B)  Q2/2015  Implementation of vacuum components  Q3/2015  RF components 29 [B. Schönfelder]

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 Outline 1.Some technical highlights 2.Project management and planning 3.Quality assurance Outlook 30

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 Results of measuring system analyses at HEBT vacuum chambers:  Previous equipment for checking chamber walls was not capable of controlling the tolerance specified: (µ rel ≤ 1,010).  QA has tested a new measuring instrument, proved its capability, and purchased it. Benefits for other parts of the project:  Specifications for SIS100 vacuum chambers are modified accordingly (µ rel ≤ 1,010)  standardization.  Training sessions were organized for GSI and in-kind partners.  SIS100 FOS dipole vacuum chamber has been tested and released during SAT using this instrument. 31 SAT SIS100 Dipole Chamber FOS [A. Harer, W. Bonin]

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 Regular monthly reporting and trilateral video conferences are established with NIIEFA (Efremov, St. Petersburg) and BINP (Budker, Novosibirsk) since July:  Dedicated directories were created in EDMS for mutual interaction and data exchange between all partners  3D models of magnets dip1s_0 and dip13_0 and their vacuum chambers are checked, reviewed and commented  Coil and magnet lamella for dip1s_0 were released  Drawings of dip1s_0 are being reviewed Further progress together with Efremov:  Production and quality plans are available  Material and welding certificates can be presented  Machine and process capabilities are given HEBT NC Dipoles & Chambers 32

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 General Concept and Status:  A permanent Quality Assurance office in Moscow will be established, dealing with all Russian suppliers or institutes delivering components to the project  Job-offer was placed for the team leader, reporting directly to the head of Quality Assurance at GSI in Darmstadt  ~ 40 applications have been received  Selection process has already started  QA methods like Q-Planning, control plans, acceptance, approval- and release processes will be equal to all other FAIR & GSI suppliers. Use of defined standards. Russian QA Office in Moscow 33

GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 Outlook (Key Points – 6 Months) 1. Recruitment of personnel, external support 2. FAIR ACC master schedule for different scenarios of civil construction milestones 3. Tracking of milestones and budget  project steering via release processes 4. Follow up of the specification process and procurement 5. Implementation of Component Data Base and change management 6. Series production start of SIS100 dipoles 7. SIS100 QDMs – pre-series unit production 8. To order the Super-FRS multipletts and procurement of the Super-FRS dipoles 34