CORP3341 Clarification Meeting Technical Evaluation of Metering Substation panels and modules Enquiry Date: 27 November 2015 Presenter: Henri Groenewald.

Slides:



Advertisements
Similar presentations
Task 3.
Advertisements

 Contracts  Subcontracting  Suppliers  Complaints  Corrective and preventive actions (CAPA)  Internal audits  Management reviews Management requirements.
Regional Development Australia Fund Round Two Guidelines Overview This presentation is intended as an overview only. For the full guidelines visit
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00031 Date: 15 January 2013 Time: 09:00.
Tender Briefing Session Skills Audit of Sub-sectors to the W&R Sector to determine critical review and skills analysis CQO/2013/0006.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00007 Date: 22 May 2015 Time: 11:00.
Quality Consulting Adaptive Processes Consulting Pvt. Ltd. An ISO 9001:2008 Certified Company This document is the property of.
Company Confidential Registration Management Committee (RMC) OP Assessors Need to Know 1 Other Party (OP) Assessor Workshop Palm Beach Gardens, Florida.
Resources Group Specialist Transport Pre-tender Event 7 th October :30am -1:30pm Northgate House Conference Centre, Warwick.
ZHRC/HTI Financial Management Training Session 8: Annual Procurement Plans, Procurement Contracts, and Contract Management.
Welcome to presentation on Contract Management System ( Primavera Software Solutions) (EPPM & CMS)
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
ROAD ACCIDENT FUND NON COMPULSORY BRIEFING SESSION RFP /2013/00021 Date: 22 July 2013 Time: 11:00.
Implementing a Calibration Management System Cory Otto Principal Metrology Engineer, Boston Scientific 10 October 2012.
© 2011 T.C. Kamu İhale Kurumu. © 2011 T.C. Kamu İhale Kurumu Public Procurement Authority Electronic Public Procurement Platform E-Procurement: Legal Framework.
REPUBLIC OF CROATIA STATE OFFICE FOR METROLOGY Conformity Assessment Procedures of the „New Approach“ of EU illustrated by the Measuring Instruments Directive.
POWER PLANT USED IN TELECOM
REPUBLIC OF ALBANIA PUBLIC PROCUREMENT AGENCY E-procurement in Albania, up to date…
1 Evaluation of the quality By committee of 3 or more specialists  Specific experience of firms ( points) Relevant assignment, similar size, complexity,
Solar PV Tender Overview Ministry of Livestock, Fisheries and Rural Development Department of Rural Development Place - Sule Shangri-La Hotel Date- 4 -
Week 8 End Use Breakdown. Elements of Breakdown Understand various methods to calculate energy use and savings Understand the purpose and various types.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
ENQUIRY NO. CORP 3140R CLARIFICATION SESSION FOR REQUEST FOR QUOTATION FOR THE DESIGN, MANUFACTURE, TESTING, SUPPLY, DELIVERY AND OFF- LOADING OF ESTIMATED.
ENQUIRY NO. CORP 3035 CLARIFICATION SESSION FOR REQUEST FOR QUOTATION FOR THE DESIGN, MANUFACTURE, TESTING AND SUPPLY OF ESTIMATED QUANTITIES OF COMPOSITE,
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
GROUP TECHNOLOGY & COMMERCIAL TACTICAL PROCUREMENT PROCUREMENT PROCESS PRESENTED BY MARTHA DE BRUYN 24 NOVEMBER
UnionPay Card Manufacturer Certification Introduction.
Teleprotection Equipment Clarification Meeting Tejin Gosai PTM&C 24 th April 2015.
Transforming Procurement E- GP Planning and change management Action Plan for E- GP implementation in Kenya Jerome Ochieng Public Procurement Oversight.
3 Million CFL Rollout Technical Clarification 17 June 2015 : Thobela Lelibana Rajay Ramgoolam.
Tender Clarification Meeting for Batteries: CORP3320 Date: 18 September 2015.
Group Technology HV Plant By: Sakkie van AardeDate: Slide: 1 of 5 Fault Path Indicators CLARIFICATION MEETING Presented by: Sakkie van Aarde.
2016/06/211 Provision of Civil Works at Simmerpan Substation PS(PDP)2015/FM/15 Date : 10 July 2015.
ENQUIRY NO: MPPPSC The drilling of boreholes, supply and installation of windmills. Prepared by: Hector Mabaso Date: 05 May 2016.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
CORP3397 Clarification Meeting Technical Evaluation of Meters Enquiry Date: 5 February 2016 Presenter: Mohamed Omar.
Kusile Power Station Project Enquiry clarification meeting Kusile Power Station Project Provision of two (02) independent environmental control officers.
16 March 2015 RFP GEN3261 Clarification meeting: Tutuka Coal Terminal Handling Service.
IT-4135/EN Supply of Air Handling Units for Industrial HVAC Projects at CERN Technical Specification Paul Pepinster / EN-CV.
Quality Management Supplier Quality Requirements The Manufacturer, testing at works and supply of various distribution cut- outs for wires business on.
ENQUIRY NO. CORP 3282 CLARIFICATION SESSION FOR REQUEST FOR QUOTATION FOR THE MANUFACTURE, TESTING, SUPPLY AND DELIVERY (TRANSMISSION, DISTRIBUTION AND.
1. Engineering 2. Purchasing 3. Other department package assistances 4. Site supervision Instrument Department Activities:
Tender Briefing Session COR34/2016
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Action Items List at PM#7
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RFP /2017/00033 Supply and delivery of Corporate Uniform Date: 07 July 2017 Time: 11:00.
Procurement & Strategic Sourcing Commercial Print Services
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00007
Procurement & Strategic Sourcing
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00031
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF /2015/00012(III)
ROAD ACCIDENT FUND NON COMPULSORY BRIEFING SESSION RFP /2013/00021
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF /2015/00012(IV)
Joint Parking Task Force Update Procurement & Strategic Sourcing
Architecture, Interior and Project management consultant
Award Contract.
Procurement & Strategic Sourcing FMLA Administration Services
Procurement & Strategic Sourcing Charter Bus Transportation Services
Joint Parking Task Force Update Procurement & Strategic Sourcing
Procurement & Strategic Sourcing (Law School Media Wall)
Procurement & Strategic Sourcing
Project: 33kV Substation Refurbishment Customer: NEEPCO Site : Ranga Hydro Electric Plant, P.O. Ranga Project, Arunachal Pradesh.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00007
Purchasing cycle Purchase request
Fasset Briefing Session
LAMAS Working Group December 2013
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
FPM CM Services Scott Hall Vivarium Updates October 3, 2019
PLAN OF WORK Plan of work is the general scheduling of program according to major activities (or phases) such as planning, implementation and evaluation.
Presentation transcript:

CORP3341 Clarification Meeting Technical Evaluation of Metering Substation panels and modules Enquiry Date: 27 November 2015 Presenter: Henri Groenewald

Metering substation panels and modules Enquiry DescriptionSAP 1 SWING FRAME CABINET (FRONT ENTRY) SWING FRAME CABINET (BACK ENTRY) METER CABINET – SLIMLINE WALL MOUNT METER MODULE – OLD SURFACE MOUNT 4-WAY METER MODULE – SURFACE MOUNT 4-WAY METER MODULE – 19” RACK MOUNT 4-WAY METER MODULE – SURFACE MOUNT 6-WAY METER MODULE – 19” RACK MOUNT 6-WAY VOLTAGE SELECTION MODULE A VOLTAGE SELECTION MODULE B

3 Metering substation panels and modules Enquiry DescriptionSAP 11 VOLTAGE SELECTION MODULE C VOLTAGE SELECTION MODULE D INTERPOSING MODULE A INTERPOSING MODULE B QUALITY OF SUPPLY MODULE MODEM MODULE WITH TRUNKING

4 Metering substation panels and modules Enquiry : Standard for substation meter panels: HV/MV indoor D-DT-5804 Manufacturing drawings for metering substation panels : Specification for standard (19 inch) equipment cabinets 0.54/1833: 2400(H) X 600(W) X 600(D) back entry substation cabinet DST : Distribution specification for a swing frame panel (19 inch rack) and blanking plates D-DT-5400 Distribution 2400(H) X 800(W) X 600(D) swing frame cabinet

5 Technical evaluation Technical evaluation will be conducted over two phases Phase 1: Gatekeeper evaluation, Product A&B Schedules, Risk and Support Duration: 1 month (end of January) Phase 2: Panels and modules evaluation Duration: 2 months NB: No previous evaluations, supply agreements and contracts has any input on this evaluation. Completely independent process

6 Tender Evaluation Technical scoring breakdown Technical Evaluation CriteriaWeightingMinimum Threshold Product A&B Schedules, Risk and Support (phase 1) 5085% Panels and modules Evaluation (phase 2)5095%

7 Gatekeeper, A&B Schedules and Risk & Support Questionnaire – Excel Sheets The excel sheet, contains the following sheets that need to be completed: General questionnaire Technical gatekeepers (per item) A&B schedule (per item) Risk and Support Questionnaire (per item) All information must be completed in electronic format in the Excel sheets requested. Excel sheets should also be completed in PDF/Hard copy for audit trail purposes Example: Excel sheetsExcel sheets Do not password protect the Excel sheets.

8 Phase 2 – Metering Panels and Modules Evaluation Suppliers / manufacturers shall be advised of their qualification for the evaluation where after they will prepare the samples. The samples must be ready for inspection six weeks after notification. The evaluations shall be conducted at the supplier / manufacturer premises. The successful tenderers shall be required to provide samples of the following items for technical and quality evaluations: 1.Item 5 - METER MODULE – SURFACE MOUNT 4-WAY 2.Item 8 - METER MODULE – 19” RACK MOUNT 6-WAY 3.Item 12 - VOLTAGE SELECTION MODULE D 4.Item 1 – SWING FRAME CABINET (FRONT ENTRY) Note: The modules shall be mounted in the swing frame cabinet for inspection

Thank you