Magnet Strategy Michael Lamm Technical Division/Magnet Systems Department Fermilab Muon Accelerator Program Review Fermilab, August 25, 2010.

Slides:



Advertisements
Similar presentations
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Advertisements

The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
Ramesh Gupta, BNL D1 Dipole Design / IR Magnet Study LARP Collaboration Meeting, Oct 5-6, D1 Dipole Design Task (terminated in 2005) IR Magnet Study.
Overview of Possible LHC IR Upgrade Layouts CARE HHH-2004 Workshop CERN 8-11 November 2004 J. Strait, N.V. Mokhov, T. Sen Fermilab bnl - fnal - lbnl -
Aug 29, 2006S. Kahn T HTS Solenoid1 A Proposal for a 50 T HTS Solenoid Steve Kahn Muons Inc. August 29, 2006.
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
Muons, Inc. AAC Feb. 4, 2009 V. Kashikhin 1 Fermilab AAC  V. Kashikhin for Superconducting Magnet Team Superconducting Helical Solenoids.
MCTF Alexander Zlobin MUTAC Meeting 8-10 April MCTF Magnet and HTS Conductor R&D.
Superconducting Magnet Division Ramesh Gupta High Field Magnet R&D with YBCO July 26, 2011Slide No. 1 EUCARD2 VIDEO CONFERENCE.
MCTF Michael Lamm MUTAC 5-Year Plan Review 22 August Magnet R&D for Muon Accelerator R&D Program Goals Proposed Studies Preliminary Effort and Cost.
1 A Joint Proposal for US-Japan Cooperation Program Proposal to JSPS US-Japan collaboration fund R&D of superconducting magnet technology for high intensity.
Storage Ring : Status, Issues and Plans C Johnstone, FNAL and G H Rees, RAL.
Magnets for muon collider ring and interaction regions V.V. Kashikhin, FNAL December 03, 2009.
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
Superconducting R&D – Now Strand and Cable R&D FERMILAB Magnet Systems Department – Now SC Materials Department (TD) HTS Insert Coil Test in External Solenoid.
Aug 9, 2008S. Kahn -- HCC Magnet Plans1 HCC Magnet Future Plans Steve Kahn Aug 9, 2008 NFMCC Friday Meeting.
HTS R&D for High Field Magnets
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Muon Acceleration Program Technology Development A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009 It is not a Project!
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Review of Quench Limits FermilabAccelerator Physics Center Nikolai Mokhov Fermilab 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011.
Fermilab 02/01/07NFMCC on MCTF Magnets1 Magnet R&D… through the MCTF Michael Lamm.
General Considerations for the Upgrade of the LHC Insertion Magnets
Open Midplane Dipole (OMD) Design for Dipole First Layout R. Gupta (BNL), N. Mokhov (FANL) bnl - fnal- lbnl - slac US LHC Accelerator Research Program.
LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday,
Harold G. Kirk Brookhaven National Laboratory High-Field Solenoids for a MC Final Cooling System AAC 2012 Austin, Texas June 11-15, 2012.
Dipole design at the 16 T frontier - Magnet R&D for a Future Circular Collider (FCC) at Fermilab Alexander Zlobin Fermilab.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
HTS High-Field Solenoid Development March xx, 2013 Presenter’s Name | DOE Mini-Review of MAP (FNAL, March 4-6, 2013)1 Advanced Quench Protection System.
BNL High Field and HTS Magnet Program Ramesh Gupta BNL, NY USA H T.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
Muon Cooling Channel Superconducting Magnet Systems Muon Collider Task Force Meeting on July 31, 2006 V.S. Kashikhin.
Magnet R&D for Muon Beam Cooling at FNAL Alexander Zlobin Fermilab Muon Collider Design Workshop, BNL December 1-3, 2009.
16 T Dipole Design Options: Input Parameters and Evaluation Criteria F. Toral - CIEMAT CIEMAT-VC, Sept. 4th, 2015.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
4/27/06 1 US LHC ACCELERATOR RESEARCH PROGRAM brookhaven - fermilab – berkeley - slac US LARP Inner Triplet Cryogenics and Heat Transfer LARP Collaboration.
Fermilab AAC MCTF 08/08/07MCTF Hardware Plans1 MCTF Hardware Development Plans Michael Lamm Focus on Support for Muon Collider Magnets at Fermilab.
Helical Solenoid Development
FCC EuroCirCol kick-off,CERN, 3 rd June 2015.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
Report from Session 2 Main Dipoles. P. McIntyre 2005 – 24T ss Tripler, a lot of Bi-2212, Je = 800 A/mm2 E. Todesco T, 80% ss 30% NbTi 55 %NbSn.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
IR Magnets for Muon Collider Alexander Zlobin and Vadim Kashikhin Muon Collider Physics Workshop, Fermilab November 12, 2009.
MCS meeting 20/11/2015 S. Guiducci. Introduction Yesterday meeting has shown an interest in a large physics community to incremental development of muon.
August 8, 2007 AAC'07 K. Yonehara 1 Cooling simulations for Muon Collider and 6DMANX Katsuya Yonehara Fermilab APC MCTF.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Aim and goals Mini Workshop of Accelerators Radiation Mini Workshop of Accelerators Radiation.
BNL solenoid capture workshop: magnet challenges are not trivial Summarized by Tengming Shen
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
CERN, 11th November 2011 Hi-lumi meeting
Generic technology development - High field magnet R&D
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Model magnet test results at FNAL
M. Migliorati, C. Vaccarezza INFN - LNF
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
At ICFA Mini-Workshop on High Field Magnets for pp Colliders,
Superconducting Helical Solenoids
Q0 magnet, cooling, support ideas
To be presented at Nb3Al R&D Review,
the MDP High Field Dipole Demonstrator
Beam-Induced Energy Deposition Studies in IR Magnets
PROGRESS TOWARDS AN OPEN MIDPLANE SEPARATION DIPOLE
HL LHC WP3 (magnets) TASK 2 ADVANCEMENT
Muon Collider Magnet Technologies/Challenges
Muon Collider SR and IR Magnets
Review of Quench Limits
Qingjin XU Institute of High Energy Physics (IHEP),
Electron Collider Ring Magnets Preliminary Summary
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Presentation transcript:

Magnet Strategy Michael Lamm Technical Division/Magnet Systems Department Fermilab Muon Accelerator Program Review Fermilab, August 25, 2010

Outline Magnet Issues for the Muon Collider MAP Magnet Objective Specific R&D Plans, Cost and Schedules –High Field Solenoids for Final Cooling –Collider Ring Magnets –HCC Magnets Comments and Conclusions August 24-26, MAP Review-Magnet Strategy

Today’s Magnet Presentations Magnet Strategy (Lamm) –How Magnet Program meets the MAP goals Very High Field Superconducting Magnet Collaboration (VHFSMC) Status & Relationship with MAP (Larbalestier) Magnet R&D (Tompkins) –Present and Future Magnet R&D, how it relates to MAP strategy August 24-26, MAP Review-Magnet Strategy

25 Oct 2007 Topical Workshop on the Neutrino Factory and Muon Colliders 4 Collider ring/IR Magnets ~10 T, wide aperture/open midplane Wide aperture 20 T solenoids Helical cooling channel (HCC) solenoid rings 20 T and above (one of many options-most challenging magnet-wise) Very high field solenoids Interesting Magnets in Muon Colliders 6-D Cooling Channel The good news: Most magnets required for MC accelerator are simple to build Transverse Cooling up to 50 T

Objectives of Magnet Program Practical conceptual design and prototype plan Meets or defines MC design requirements Must be “manufacturable” reproducible and in a reasonable time frame Enough technology development to back up design either through MAP or leveraged from other DOE programs or industrial application August 24-26, MAP Review-Magnet Strategy

Focus on Difficult Magnets High Field Solenoid: 40 T nominal, up to 50 T –Mechanical complexity, quench protection Colliding Ring Dipoles and Quads –Field quality, mechanical support related to wide aperture and/or open midplane 6-D cooling Magnets if Helical Cooling Channel (HCC) –Logistics of incorporating RF with SC coils August 24-26, MAP Review-Magnet Strategy

Other Objectives/issues Target Solenoid: 20 T Magnet Energy deposition, radiation damage Rapid Cycling magnetic structures for Muon acceleration Power losses Cost estimation for magnets: Higher risk specialty magnets Very large number of low risk solenoids T solenoid R&D Moderate difficultly, issues with field leakage into adjacent RF structures August 24-26, MAP Review-Magnet Strategy

40-50 T Solenoids Up to about 50T, luminosity increases with higher field final cooling solenoids. The state-of-the-art for high field superconducting solenoids is about half of this field, i.e. ~25 T Potential for luminosity gain through higher field solenoids Goal is to demonstrate feasibility of high field solenoid that meet all muon collider requirements Preliminary studies suggest that a 40 T solenoid meets the field requirements (hence the T range) August 24-26, MAP Review-Magnet Strategy

High Field Solenoid Studies August 24-26, MAP Review-Magnet Strategy More details in the following two talks PBL SBIR Conductor R&D Magnet Design Studies VHFSMC Supported R&D Instrumentation Development

Magnet Complexity Grows with Increasing Bore Field Several magnet design studies over the past few years point to the difficulties of building high field solenoids Peak hoop stress grows faster than linear with field increase stress means larger % of magnet volume devoted to stress management Volume grows ~field 2  much more HTS even with hybrid magnets which employ NbTi and Nb 3 Sn outserts, most of the volume increase comes from HTS materials August 24-26, MAP Review-Magnet Strategy

“High Field Solenoid Strategy” August 24-26, MAP Review-Magnet Strategy Divide effort into 5 tasks…. 1)Develop functional specifications for the high field solenoid. 2) Evaluate/compile information on state-of-the-art of conductors. 3) Build HTS and hybrid inserts to prove technology. 4) Perform conceptual designs for highest field practical magnet. 5) Present plan for building magnets in years 1-3 post plan.

Magnet Specifications August 24-26, MAP Review-Magnet Strategy 1) Develop functional specifications for the high field solenoid. Preliminary Specification: Number of magnets ~ 20 More if field is lower Central Magnetic Fields > 30 T at start, > 40 T at end Lengths ~ 1m at start ~ 10 cm at end Minimum magnet bore 2 cm at start 1 cm at end Field Quality 0.2% at start 0.2% at end Time frame: First year (now)

HTS Conductor Studies 2) Evaluate state-of-the-art of conductors. The state-of-the-art in HTS conductor is the major factor limiting a practical High Field design. Parameters: engineering current densities > 500 A/mm2 at 30 T excellent strain tolerance available in long piece lengths We expect that there will be continued significant progress in conductor development during the multi- year window for the MAP design study. We expect to benefit from conductor studies conducted by other programs such as VHFSMC August 24-26, MAP Review-Magnet Strategy

HTS Conductor Studies 2) Evaluate state-of-the-art of conductors. Part II Significant effort in MAP will be devoted to short sample testing of promising materials. Studies include Ic as a function of temperature, field, field orientation strain magnetization MAP will focus on materials not covered specifically by other programs for example VHFSMC is studying Bi 2212 wires MAP will depend on outside programs such as the VHFSMC and SBIR’s to develop new conductor. Time frame: First half of program August 24-26, MAP Review-Magnet Strategy

Insert Program 3) Build HTS and hybrid inserts to prove technology. Economical approach to testing out coil technology Standalone tests or combined with facility outserts Study conductor/cable mechanical properties quench characteristics splice techniques Cabling technologies Time frame: Now throughout program Build~5-6 inserts/year in peak of program Detailed program will be dictated by needs of MAP August 24-26, MAP Review-Magnet Strategy Note: inserts are not a substitute for building full scale magnets

Conceptual Design 4) Perform conceptual designs for highest field practical magnet. Key design points utilizing the state-of-the art conductor advanced mechanical support approaches effective insulation schemes Quench protection strategies Insert development within and beyond MAP; build on results from SBIR Time Frame: Second half of program August 24-26, MAP Review-Magnet Strategy

Fabrication Plan 5) Develop plan for building full scale magnet after MAP is completed Extension of previous task Base on conceptual design Develop cost and schedule Time Frame: last 2 years of Plan August 24-26, MAP Review-Magnet Strategy

High Field Solenoid Milestones Fabricate small HTS test magnet FY 13 – This is meant to be a significant technology demonstration. Required progress: baseline magnet specs continued progress on application of state of the art conductor evolution of insert program, leverage SBIR progress Begin conceptual design of >30 T solenoid FY13 depends on progress on previous milestone Complete conceptual design of >30 T solenoid FY16 task 4 and Task 5 completed August 24-26, MAP Review-Magnet Strategy

Collider Magnet Issues IR and arc, dipoles and quadrupoles Strong arc magnets, reduce ring circumference, increase luminosity Baseline design calls for 10 T fields Significant energy deposition issues, electrons from muon decay ~0.1 kW/m in horizontal plane for storage ring Must be intercepted outside of the magnet helium vessel August 24-26, MAP Review-Magnet Strategy

Magnet Specifications 1) Develop functional specifications –i.e. Working with collider ring design group, define parameters for magnet central field field errors/size of “good field region” radiation damage/energy deposition aperture including internal beam absorber –Field and energy deposition indicate the need for Nb 3 Sn conductor August 24-26, MAP Review-Magnet Strategy

Collider Magnet Concepts August 24-26, MAP Review-Magnet Strategy Blah Note: These studies build on significant Nb 3 Sn technology development from LARP and DOE core programs Zlobin IPAC 10 Novitski ASC ) Develop baseline designs IR Quads IR Separation Dipole Arc Dipole

Technology Development 3) Technology Development –1 meter long magnets are not part of MAP scope expensive program based on LARP experience –MAP Plan depend on core programs FNAL and LBNL benefit from knowledge gained on other projects and programs –LARP wide aperture quads for future LHC upgrades in particular  120 mm Nb 3 Sn quad models being built now…. small R&D projects will be considered depending on design directions, such as radiation hardened insulation August 24-26, MAP Review-Magnet Strategy

Design Studies 4) Conceptual design –Primary goal is demonstrate feasibility of magnet fabrication issues: –details of energy dissipation –radiation damage –mechanical structure, especially with open plan dipoles –field quality (not as big an issue because of muon lifetime) IR dipole looks to be the most challenging –Develop designs far enough along for cost estimate August 24-26, MAP Review-Magnet Strategy

Collider Magnet Milestone Begin conceptual design of collider magnets FY 13 –Preliminary design work is of course progressing now –Final conceptual design depends on specifications based on lattice design continued technology development, mostly outside of MAP August 24-26, MAP Review-Magnet Strategy

HCC Magnets 6- dimensional cooling is one of the highest technological risks of the muon collider –O(10 6 ) cooling required –Several technologies are being considered –Of these choices, Helical Cooling Channel (HCC) has the most challenging magnets because of the complicated field and close proximity to RF and cooling media. –These field can be generated elegantly by using solenoid rings offset in a helical pattern August 24-26, MAP Review-Magnet Strategy

HCC Magnet Strategy Over the past few years, studies have been performed between Fermilab and Muons Inc. –Paper study cooling channel have been designed and studied. require magnets ranging from ~6 T to 25 T on conductor –Cooling efficiency as a function of geometric and conductor parameters –Integration of magnets with RF and absorber media –Coil fabrication techniques both for high field and low field section of coils August 24-26, MAP Review-Magnet Strategy

“Helical Solenoid Magnets” August 24-26, MAP Review-Magnet Strategy Correction Schemes Model Magnet Program NbTi Basic HC Design Model Magnet Program HTS

HCC MAP Program Continue to support magnetic design studies to determine if HCC is the best solution of the muon collider Continue on a low level magnet development program: Key issues: –Economical and reliable coil fabrication –NbTi, Nb 3 Sn and HTS coil technology –Quench protection for very long strings of solenoid rings August 24-26, MAP Review-Magnet Strategy

HCC MAP Program II Future of program completely depends on technology decision in the next few years If HCC is not chosen –Program closed If HCC is adapted for all or part of Cooling –Continue magnet demonstration program Either way –Effort will segue to magnet support of 6-D demonstration (which is the only relevant milestone) August 24-26, MAP Review-Magnet Strategy

Rapid Cycling Dipoles 30MAP Review-Magnet Strategy

Rapid Cycling Dipole Results August 24-26, MAP Review-Magnet Strategy D. Summers U. Mississippi Prototype BuiltPrototype Tested

Rapid Cycling Dipole Program 32MAP Review-Magnet Strategy

Proposed Resource Allocation August 24-26, MAP Review-Magnet Strategy

Comments As this is an R&D program, within a larger R&D program, there must be some flexibility in planning –Program must adapt to evolving ideas in the muon collider design –Program must adapt to anticipated and unanticipated technology breakthroughs –Possibility to redistributing funds in later years with the broader magnet view as best needed. August 24-26, MAP Review-Magnet Strategy

Examples of future decisions Technology decision for 6-D –might scrap HCC altogether=>focus on 6-D magnet/RF integration –Hybrid 6-D focus on HCC in higher energy regime=> Nb 3 Sn or HTS Development of HTS materials or high field solenoid technology might argue for a more significant demonstration in the later years Refinement of IR design and LARP breakthrough in Nb 3 Sn might affect IR dipole technology decision August 24-26, MAP Review-Magnet Strategy

Conclusion There are significant magnet challenges for the Muon Collider A strong magnet program within MAP is essential to building a convincing muon collider design – Program targets key magnets with the highest technical risk. (highest % of resources to “high field solenoid”) – Reliance on DOE programs outside of MAP for support particularly for conductor development and collider magnet R&D – Additional resources needed for any significant magnet demonstration within MAP August 24-26, MAP Review-Magnet Strategy