Tide from the viewpoint of ports Expectations and opportunities Toon Tessier Antwerp Port Authority.

Slides:



Advertisements
Similar presentations
BlackSea Region Meeting Varna Points raised by the EU Maritime Strategy of relevance for PlanCoast.
Advertisements

Confernece on transport, energy and environmental issues Dr. Gerhard Kuschnig, Vienna Waterworks Dr. Slobodan Miko, Croatian Geological Survey Vienna/
Vision For the Future of Water in Kansas. 1.Technology and Crop Varieties 2.Water Management 3.Water Conservation 4.New Sources of Supply Breakout Topic.
THE DIVERSITY OF INTERESTS IN ENVIRONMENTAL GOVERNANCE A CHALLENGE FOR THE RULE OF LAW By Professor D E Fisher.
CEDA Prof. Em. Eng. J.J. Peters | Consultant Engineer Morphological Dredging a tool to improve nature values in rivers and estuaries?
Managing Flooding Hard and Soft Engineering LO: to understand the types of hard and soft engineering used to control rivers and the advantages and disadvantages.
The EU Water Framework Directive and Sediments The Water Framework Directive was transposed into law in EU Member States at the end of Nearly two.
The Resilient Coasts Initiative A Partnership Response.
Q AVG US Army Corps of Engineers BUILDING STRONG ® Q AVG US Army Corps of Engineers BUILDING STRONG ® USACE Regional Sediment Management Program Linda.
Dams and Development Prof. Hem Raj Subedee, Ph.D. Conflict, Peace and Development Studies Tribhuvan University Kathmandu
Severn Tidal Power – a proposal A Barrage of Issues.
3.3 Energy Resources Human Population, Carrying Capacity, and Resource Use.
NRCS Watershed Rehabilitation
Watershed Assessment and River Restoration Strategies
Building Resilient Marine Protected Areas in Madagascar By Harifidy Ralison 31 January 2008.
For each question: what did you learn from the workshops? What matters are still left unanswered? 1.What are the main observations or conclusions - for.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
TIDE & Natura 2000: A partnership for sustainable tidal river development? Antwerp, 18 February 2010 François Kremer European Commission DG Environment,
Enver AKSOY, MSc Head of Strategy Development Board of MoFAL Policy approaches of Ministry of Food, Agriculture and Livestock to pasture management in.
NOAA Restoration Center Implementing the Gulf Regional Sediment Management Master Plan …responding to an ongoing emergency, improving responses to new.
TIDE Estuaries: Elbe, Humber, Scheldt & Weser Kick-Off Conference in Antwerp 18 th February 2010.
TIDE | Heinz Glindemann | Hamburg Port Authority Introduction to the TIDE Project Kick-Off Conference in Antwerp 18 th February 2010.
Integrated Coastal Management in the Baltic Sea A framework for better management of environment and resources Olof Linden World Maritime University.
The Severn Barrage Presentation to Severn Estuary Forum 8th June 2006
A Pivotal Moment for Leaders Across the Gulf Coast States and Connected Communities Throughout the Country.
“The minimum flow for a given watercourse shall be the limit at which further withdrawals would be significantly harmful to the water resources or ecology.
1 Port Development and the Reuse of Dredged Material in the Stour and Orwell Estuaries Dr Andrew Birchenough Dr Chris Vivian The Centre for Environment,
Commission Guidance on inland waterway development in the context of the EU Birds and Habitats Directives Kerstin Sundseth, Ecosystems LTD.
Key factors in the transport policy to encourage better integration Sixty-Third Session of UNECE, Geneva, 30th March 2009 "Economic Integration in the.
Presentation to the Ad-hoc Joint Sub-Committee on Parliamentary Oversight and Accountability Wednesday 20 March 2002 PUBLIC SERVICE MONITORING AND EVALUATION.
MRERP Missouri River Ecosystem Restoration Plan and Environmental Impact Statement One River ▪ One Vision A Component of the Missouri River Recovery Program.
DELAWARE NATIONAL ESTUARINE RESEARCH RESERVE Promoting stewardship of the nation’s coastal areas through science and education …
Hightown Dune Restoration Scheme and the River Alt Update – September 2013 Graham Lymbery Sefton Council.
Scenarios for territorial policy making The ESPON 2006 scenarios Moritz Lennert IGEAT - ULB.
Framework for Water Management – challenges at national/local and trans-boundary scale Water Framework Directive implementation Gordana Kozhuharova, REC,
Same dredger, different location: Environmental impacts of dredging
Collaborative Decision Making Module 5 “The Collaborative Environment”
Ecosystem Health & Sustainable Agriculture Project Definitions of Sustainability – sustainable rural development and sustainable agriculture Christine.
Toronto Waterfront Scan and Environmental Improvement Strategy Project - Economic Opportunity in a Sustainable Waterfront Presentation to the Federation.
Continuing Authorities Program
HELCOM objectives in shipping field
South-East European Space
Application Focus Area (AFA) 1: Discovering breakthrough science
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
Closed Loop Wind Farm Control
The Place Standard, housing and local environmental quality
1 PIANC and the Environment Working WITH Nature
Selecting the Level of Involvement
Fostering Dialogue to Support Community Resilience
5.2 Why must we preserve the coast?
Good Practices on Disaster Prevention in Europe
Draft revised terms of reference Working Group on estuaries and coastal zones conservation issues.
DG Environment, Nature Protection Unit (D3)
CGBN Co-ordination Group for Biodiversity and Nature
Kerstin Sundseth, Ecosystems LTD
Working Group on estuaries and coastal zones
Draft Methodology for impact analysis of ESS.VIP Projects
Working Group on estuaries and coastal zones
CASE STUDY: A SPECIFIC CASE OF NON-ACHIEVEMENT OF THE OBJECTIVE
A Blueprint to safeguard Europe’s waters
Which is the real scope of the Guidance ?
T i d a l R i v e r D e v e l o p m e n t
Overview of Article 6 procedures under the Habitats Directive
Meeting of the WFD Strategic Co-ordination Group 11 March 2009
RECOMMENDATIONS TO THE CONTRACTING PARTIES TO THE BARCELONA CONVENTION
PROVISIONS UNDER THE HABITATS DIRECTIVE RELEVANT TO NEEI
SWA Progress Review Initial Framing
BRD The Development Bank of Rwanda Plc (BRD) is Rwanda’s only national Development Finance Institution Public limited company incorporated in 1967 and.
What does it mean to have a forest in a Natura 2000 area?
CEng progression through the IOM3
Presentation transcript:

Tide from the viewpoint of ports Expectations and opportunities Toon Tessier Antwerp Port Authority

Tide from the viewpoint of ports | 18 February 2010 | Toon Tessier | Antwerp Port Authority 23. Februar 2010 Estuaries and ports in conflict? Goods transport deep into the hinterland by using estuaries as fairways for seagoing vessels is both the most economic and (is potentially) the most ecological way of transport The economic welfare of big parts of Northern Europe will depend on accessibility of its ports A major concern of the inland seaports is to maintain commercially viable water depths of the estuary navigation channel → need for dredging in estuaries

Tide from the viewpoint of ports | 18 February 2010 | Toon Tessier | Antwerp Port Authority 23. Februar 2010 Estuaries and ports in conflict? However, dredging and disposal can affect the hydrodynamic regime and morphology of an estuary >< Disturbing Estuarine natural balance >< Increased flood unsafety (penetration of the tide) >< Destruction of Habitats, disturbing Wildlife Ports receive most (if not all) of the blame

Tide from the viewpoint of ports | 18 February 2010 | Toon Tessier | Antwerp Port Authority 23. Februar 2010 Nature Untouched = Nature Best? Habitat quality sustained because of purposeful management “Working with nature”= Nature conservation Heath land North-American Prairies

Tide from the viewpoint of ports | 18 February 2010 | Toon Tessier | Antwerp Port Authority 23. Februar 2010 NEW! DELTA 2007, Issues and SystemUnderstanding Review of existing practices in dredging management of partner countries. Report 6.1 With regard to the environmental groups, the report tries to overcome the “rejection reflex” in the debate about the impact of the proposed activities. It shows, on the basis of concrete examples, that dredging work and disposal of dredged material aimed at improving shipping access do not necessarily have a negative impact on natural habitats or on the normal morphological dynamics of the river. The perception in ecological circles is that the best way to conserve nature is for human intervention in the estuary to be kept to a minimum. Since every intervention is normally viewed as one too many – especially if it is carried out with an economic objective – the debate concerning the relationship with the Birds and Habitats Directive is currently limited to the question of how 'significant' the negative impact on the estuary will be, in comparison with other developments. By contrast, this theme aims to go further, showing how a carefully designed dredging and disposal/use strategy that forms part of an holistic approach can, in appropriate situations, actually make a positive contribution towards reducing undesirable effects on the natural system.

Tide from the viewpoint of ports | 18 February 2010 | Toon Tessier | Antwerp Port Authority 23. Februar 2010 Estuaries of today: need for management Estuaries of today: management is essential to secure its different main functions –Ecology –Safety against flooding –Accessibility of the ports What is the best management strategy to reach sustainable estuaries?

Tide from the viewpoint of ports | 18 February 2010 | Toon Tessier | Antwerp Port Authority 23. Februar 2010 Can we develop a management strategy that is beneficial for the different main functions of an estuary? Ports believe that Tide will add to the answer: By integration of knowledge By gathering new information By interestuarine comparison By performing specific pilot measures By enhancing ongoing sustainable plans By dialogue across borders and perspectives

Tide from the viewpoint of ports | 18 February 2010 | Toon Tessier | Antwerp Port Authority 23. Februar 2010 Morphological management strategy Keys to win-win solutions Not only taking into account the short term societal benefits and costs of the moment Goal is to generate a flexible geometry conserving morphological diversity, complexity and mobility of a multiple channel system Strategy should aim at the following operational targets: –Controlling the propagation of the tidal wave –Increasing self-erosive action of the currents at sills –Maintaining (or possibly improving) the diversity of biotopes

Tide from the viewpoint of ports | 18 February 2010 | Toon Tessier | Antwerp Port Authority 23. Februar 2010 Measures for morphological management –Morphological dredging –Morphological disposal –Modification of hard bordering that obstruct natural river flow –Construction of new “soft” measures that could be adapted easily if needed (dynamics of the system) Working with nature, not against Morphological management strategy Keys to win-win solutions

Tide from the viewpoint of ports | 18 February 2010 | Toon Tessier | Antwerp Port Authority 23. Februar 2010 Example: counterposing disposal strategies Traditional disposal strategy –Disposed sediments will be transported to the sills anyway –Efficient disposal: time between disposal and “re-dredging” need to be as large as possible Morphological disposal strategy –Morphological evolutions of the estuary are observed –Disposed sediments are used to initiate (local) morphological evolutions of the estuary trying to improve the overall morphology (ecology, safety, accessibility)

Tide from the viewpoint of ports | 18 February 2010 | Toon Tessier | Antwerp Port Authority 23. Februar 2010 Developing a Morphological disposal strategy in the Western Scheldt. A pilot project on the shoal of Walsoorden

Tide from the viewpoint of ports | 18 February 2010 | Toon Tessier | Antwerp Port Authority 23. Februar 2010 Sill of Hansweert Disposal location Waarde Disposal location Biezelingse Ham Shoal of Walsoorden: introduction

Tide from the viewpoint of ports | 18 February 2010 | Toon Tessier | Antwerp Port Authority 23. Februar 2010 Shoal of Walsoorden: history

Tide from the viewpoint of ports | 18 February 2010 | Toon Tessier | Antwerp Port Authority 23. Februar 2010 Distribution of flood current (multiple channel system) Increasing self-eroding capacity of flow on sill Reduction flow velocities on shoal Shoal of Walsoorden: proposal

Tide from the viewpoint of ports | 18 February 2010 | Toon Tessier | Antwerp Port Authority 23. Februar 2010 Morphological disposal strategy in the Western Scheldt Pilot project Walsoorden Feasibility study ( ) 2 in situ disposal tests (2004 & 2006) Extensive monitoring programme ( ) => Conclusion: the morphological disposal strategy at the shoal of Walsoorden is feasible

Tide from the viewpoint of ports | 18 February 2010 | Toon Tessier | Antwerp Port Authority 23. Februar 2010 Morphological management strategy The cause of erosion of the shoal tip in the past needs to be taken care off as well! ↓ Morphological disposal strategy is only part of morphological management strategy of the Scheldt estuary

Tide from the viewpoint of ports | 18 February 2010 | Toon Tessier | Antwerp Port Authority 23. Februar 2010 Enlargement of the navigation channel in the Western Scheldt Elements of a morphological disposal strategy

Tide from the viewpoint of ports | 18 February 2010 | Toon Tessier | Antwerp Port Authority 23. Februar 2010 Enlargement of navigation channel Tide independent accessibility to port of Antwerp for ships with draught up to 131 dm Capital dredging works: 7,7 Mm³ in Western Scheldt Environmental impact assessment: creation of ecologically valuable ecotopes through morphological disposal on the edges of sandbars

Tide from the viewpoint of ports | 18 February 2010 | Toon Tessier | Antwerp Port Authority 23. Februar 2010 Morphological disposal locations

Tide from the viewpoint of ports | 18 February 2010 | Toon Tessier | Antwerp Port Authority 23. Februar 2010 Conclusions Tide offers a good opportunity to enhance the sustainable development of estuaries One specific point of interest is learning from each other with regard to sustainable morphological strategies Win-win solutions should prevail: morphological management should be economically viable, decrease flooding risks and promote nature conservation simultaneously

Tide from the viewpoint of ports | 18 February 2010 | Toon Tessier | Antwerp Port Authority 23. Februar 2010 Conclusions A paradigm shift can support these solutions: careful, purposeful management, based on excellent know-how as a means to reach a better estuarine nature than leaving it as it is Ultimately morphological management strategies, including maintenance dredging and disposal, could be accepted as instruments to preserve valuable estuarine ecology, and no longer as a threat

Tide from the viewpoint of ports | 18 February 2010 | Toon Tessier | Antwerp Port Authority 23. Februar 2010 Questions?