Costo ~ 600 kE ATLAS: Frascati, Milano, Pavia, Pisa CMS: Firenze, Padova, Perugia, Pisa, Trieste Applicazioni: FTK Phase II, L1 Track Trigger, outside.

Slides:



Advertisements
Similar presentations
Phase 2 pixel challenges  ATLAS and CMS phase 2 pixel upgrades very challenging  Very high particle rates: 500MHz/cm 2  Hit rates: 1-2 GHz/cm 2 (factor.
Advertisements

22 settembre 2004A. Annovi1 SVT upgrade status A. Annovi - Assisi, 22 settembre 2004.
FTK poster F. Crescioli Alberto Annovi
June 19, Outcome of the CERN meetings Preparing the upgrade R&D proposal M. Shochet.
Cluster Finder Report Laura Sartori (INFN Pisa) For the L2Cal Team Chicago, Fermilab, Madrid, Padova, Penn, Pisa, Purdue.
G. Volpi - INFN Frascati ANIMMA Search for rare SM or predicted BSM processes push the colliders intensity to new frontiers Rare processes are overwhelmed.
INFN Activities on Pixel Phase 2 Electronics L. Demaria on behalf of INFN institutes: Bari, Padova, Pavia/Bergamo, Perugia, Pisa, Torino 1/28/2014 L.Demaria:
Alberto AnnoviFTK meeting - September 30, 2004 Ideas for a Fast-Track trigger processor - FTK... an evolution of the CDF Silicon Vertex Trigger (SVT) A.
ATLAS Trigger Development
SVT Nov 7, 2002Luciano Ristori - Vertex2002_7Nov02.ppt1 SVT The CDF Silicon Vertex Trigger Vertex 2002 Luciano Ristori Istituto Nazionale di Fisica Nucleare.
SVT April 2006Alberto Annovi- IFAE SVT L’upgrade del Silicon Vertex Trigger (SVT) di CDF IFAE 2006 Alberto Annovi Istituto Nazionale di Fisica Nucleare.
L2 CAL Status Vadim Rusu For the magnificent L2CAL team.
Performances of the upgraded SVT The Silicon Vertex Trigger upgrade at CDF J.Adelman 1, A.Annovi 2, M.Aoki 3, A.Bardi 4, F.Bedeschi 4, S.Belforte 5, J.Bellinger.
Applicazione con al centro dispositivi moderni elettronici FPGA combinati con ASIC specifici Le Memorie Associative 2 possibili applicazioni  Smart Systems.
Software for tests: AMB and LAMB configuration - Available tools FTK Workshop – Pisa 13/03/2013 Daniel Magalotti University of Modena and Reggio Emilia.
System Demonstrator: status & planning The system demonstrator starts as “vertical slice”: The vertical slice will grow to include all FTK functions, but.
Summary of Deliverables & reached Milestones History and explanation of steps Milestones this year Deliverables: who is going to write what Done & to be.
FTK high level simulation & the physics case The FTK simulation problem G. Volpi Laboratori Nazionali Frascati, CERN Associate FP07 MC Fellow.
Calliope-Louisa Sotiropoulou C OGNITIVE I MAGING U SING FTK H ARDWARE M EETING ON M EDICAL I MAGING.
Associative Memory design for the Fast Track processor (FTK) at Atlas I.Sacco (Scuola Superiore Sant’Anna) On behalf Amchip04 project (A. Annovi, M. Beretta,
Status of FTK & requests 2013 Paola Giannetti, INFN Pisa, for the FTK Group ATLAS Italia, Sep 5, 2012 Status of FTK work IMOU NEWS & Future steps TDR with.
Future evolution of the Fast TracKer (FTK) processing unit C. Gentsos, Aristotle University of Thessaloniki FTK FP7-PEOPLE-2012-IAPP FTK executive.
Status of FTK Paola Giannetti, INFN Pisa, for the FTK Group ATLAS Italia, Fabruary 2, 2010 Status & Evolution of FTK (impact on Italian groups) Schedule.
Global Costs based on TP (6-10 y): ~1150 K€ Italy ~1150 K€ USA ~200 K€ Waseda ~300+ extra K€ new institutions Costs for 2013 run ~400 K€ Italy ~500 K€
Paola TDAQ FTK STATUS (valid for both Option A & B) Paola Giannetti for the FTK collaboration  Work done for each milestone since the TDAQ.
Tracking Triggers Fabrizio Palla INFN Pisa. F. Palla INFN Pisa The Tracker and the Trigger n Trigger rates control is extremely challenging in high luminosity.
IAPP - FTK workshop – Pisa march, 2013 Marco Piendibene – University of Pisa & INFN FTK and the AM system.
L1 track trigger and pattern recognition applications Giovanni Punzi University & INFN-Pisa Thanks to: A. Annovi, F. Palla IFD2015 Torino, December 15-17,
Summary of Deliverables & Reached Milestones History and explanation of steps Milestones this year Deliverables: who is going to write what Outreach :
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Status of FTK Paola Giannetti INFN Pisa for the FTK Group ATLAS Italia November 17, 2009.
GUIDO VOLPI – UNIVERSITY DI PISA FTK-IAPP Mid-Term Review 07/10/ Brussels.
Paola Giannetti INFN Pisa Pisa Seminar, May
F. Palla INFN Pisa INFIERI (Intelligent, Fast, Interconnected and Efficient devices for frontier exploitation in Research and Industry) Fabrizio Palla.
New AMchip features Alberto Annovi INFN Frascati.
The AMchip on the AMBoard Saverio Citraro PhD Student University of Pisa & I.N.F.N. Pisa.
UPDATE ON HARDWARE 1 1.VERTICAL SLICE & COOLING TESTS 1.ONLY a TEST STAND or a SMALL DEMONSTRATOR ?? 2.CRATE.
Training Phase Implementation Simulation and Implementation Results Hardware Setup * Abstract We present an innovative and.
CMS Drift Tubes Gruppi di Bologna, Padova, Torino G.M. Dallavalle
Outline The Pattern Matching and the Associative Memory (AM)
The Associative Memory Chip
Status & plan for the Tracker R&D and Construction
IAPP - FTK workshop – Pisa march, 2013
T-simulation OUTLINE Inputs to the T-simulation: chips, boards, crate mechanics and fan T-simulation performed into two steps: On large scale: simple AM.
FTK: update on progress, problems, need
Saverio Citraro PhD Student University of Pisa & I.N.F.N. Pisa
The Associative Memory – AM = Bingo
FTK Update Approved by TDAQ in april
More technical description:
Pulsar 2b AMchip05-based Pattern Recognition Mezzanine
FTK infrastructure in USA15 Status and plans for 2015 A
Project definition and organization milestones & work-plan
Status and plan for the phase 2 Tracker Construction
Cost &Personnel Estimates Project Organization
ETD/Online Report D. Breton, U. Marconi, S. Luitz
Summary of Deliverables & reached Milestones
Calliope-Louisa Sotiropoulou on behalf of the IMPART Project
AM system Status & Racks/crates issues
An online silicon detector tracker for the ATLAS upgrade
2018/6/15 The Fast Tracker Real Time Processor and Its Impact on the Muon Isolation, Tau & b-Jet Online Selections at ATLAS Francesco Crescioli1 1University.
Pending technical issues and plans to address and solve
Update on CSC Endcap Muon Port Card
ATLAS L1Calo Phase2 Upgrade
Read-out of High Speed S-LINK Data Via a Buffered PCI Card
Valerio Re (INFN-Pavia) on behalf of the RD53 collaboratios
A Fast Hardware Tracker for the ATLAS Trigger System
ARAMIS Is it an interesting event?
KICK OFF meeting - project presentation
The Road Warrior: first use of the Pulsar for SVT
FTK Fibers Pixel & SCT RODS ATCA
Presentation transcript:

Costo ~ 600 kE ATLAS: Frascati, Milano, Pavia, Pisa CMS: Firenze, Padova, Perugia, Pisa, Trieste Applicazioni: FTK Phase II, L1 Track Trigger, outside Hep

(1) New Amchip (40 nm), (2) Multipackaging, (3) ATCA power FTK miniaturization: 3 areas of actions FTK What about this size ? Goal : build a Lamb that can fit in a PC or can be accessed by a PC. New Amchip 40 nm (200 MHz?, new functionalities for L1)

New Ideas for the future - FTK could become smaller and smaller Multi-packaging FPGA & Amchip – mini FTK 3 (1)We have a very interesting quotation for FPGA bare dies to be packaged with AMchips (2)IMEC support for feasibility studies (3)FTK SIP (System In Package) becomes a real possibility – large impact on AM bank sizes Pattern matching & track fitting (TF) sqweezed in a SIP (BGA 23x23) TF highly parallelized

R&D activities and costs Sviluppo schede e mezzanine ATCA, new Amchip & AM SIP – 2 CPU ATCA 12 keuro – 2 crates20 keuro – 6 Pulsars II30 keuro – 8 ATCA mezzanines 32 keuro – 128 Amchips10 keuro – 2 miniasics submissions (40 nm)44 keuro – MPW (40 nm)100 k$ – naked FPGAs50 keuro – Multipackaging = AMSIP150 keuro – Tests of AMSIP system150 keuro – New mezzanine with AMSIP10 keuro TOT ~600 keuro Demo for L1-tracking New AMchip AMSIP

GOALS To produce a modern-powerful hardware for  Level CMS & ATLAS  Level ATLAS  Applications outside HEP