Development Plan for Reliable Card-size IOC N. Kamikubota and S.Yamada, J-PARC/KEK May 2015 in MSU, kami, KEK/J-PARC.

Slides:



Advertisements
Similar presentations
EPICS at SSRF/Shaghai in March.2008, n.kami, KEK J-PARC Status N. Kamikubota, KEK and J-PARC Control members at Mar.2008.
Advertisements

1 J-PARC and T2K 1.Accelerator construction status and commissioning 2.Accelerator upgrade plan in first 5 years 3.Experiments with slow extracted beam.
2013 Apr.30-May.03 Shuei EPICS Collaboration Meeting 2013 Spring 1 Acquisition of Long Waveform using Yokogawa SL1000 Shuei YAMADA KEK / J-PARC.
Current Status of Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda,
Real-time Performance Improvement of “EPICS on F3RP61” Yokogawa Electric Corporation.
1 J-PARC Overview Shoji Nagamiya J-PARC Center High Energy Accelerator Research Organization (KEK) Japan Atomic Energy Agency (JAEA) October 15, 2008 ATHIC2008,
Development of new power supplies for J-PARC MR upgrade Yoshi Kurimoto (KEK) for J-PARC accelerator group.
KEK / Fujio Naito How J-PARC recovered from the big earthquake Outline About J-PARC The earthquake Damage on J-PARC Recovery plan Beam study results Summary.
KEK, High Energy Accelerator Research Organization.
Kazuro Furukawa, KEK, Oct EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.
FFAG Fixed Field Alternating Gradient synchrotrons, FFAGs, combine some of the main advantages of both cyclotrons and synchrotrons:  Fixed magnetic field.
Multiplicity and Energy of Neutrons from 233U(nth,f) Fission Fragments
Chalmers University of Technology, Sweden
BPM DAQ for KEK Linac EPICS IOC using WindowsXP-based Oscilloscope for BPM DAQ System in KEK e-/e+ Linac Masanori Satoh (KEK Linac) June 13-16, 2011 EPICS.
K.Furukawa, Feb Controls Activity at KEK Controls Activities at KEK Issues for ILC Kazuro Furukawa, KEK.
ICALEPCS 2007 WOAB041 Web-Based Electronic Operation Log System Zlog System K.Yoshii and T.Nakamura Mitsubishi Electric System & Service Co., Ltd., Tsukuba,
EPICS meeting in Taiwan, June.2011, kami, KEK Demonstration of Embedded EPICS on F3RP61 PLC N. Kamikubota, J-PARC/KEK.
Beam diagnostics control for J-PARC LINAC Guobao SHEN J-PARC Center Japan Atomic Energy Agency Mar
EPICS at APS in June.2006, n.kami, KEK J-PARC Status N. Kamikubota, KEK and J-PARC Control members * Try to enhance updates in the last 1 year.
Dec 8-10, 2004EPICS Collaboration Meeting – Tokai, Japan MicroIOC: A Simple Robust Platform for Integrating Devices Mark Pleško
Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda, H. Sako, H. Suzuki,
050928ICFA seminar Daegu 1 Inter-University Research Institute Corporation High Energy Accelerator Research Organization KEK Yoji Totsuka.
1 Status and Plans at J-PARC Linac Kazuo Hasegawa J-PARC Center/Japan Atomic Energy Agency Collaboration meeting between CERN and J-PARC December 18, 2013,
Q&A on T2K construction of beam line near detectors budget collaboration (contribution from each) T2KK.
EPICS Collaboration Meeting, Dec.2004, Tokai, by N.Kamikubota, KEK miniEPICS N.Kamikubota, J.Odagiri, G.Shen, N.Yamamoto, K.Furukawa and T.Katoh KEK.
March 2008EPICS Meeting in Shanghai1 KEKB Control System Status Mar Tatsuro NAKAMURA KEKB Control Group, KEK.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
Development of the beam loss monitor for beam halo measurement in the J-PARC RCS Masahiro Yoshimoto *, Hiroyuki Harada, Shinidhi Kato, Kota Okabe, Michikazu.
1 Linac 2010 Status Sep 12-17, 2010, Tsukuba Hiroyuki Sako Japan Atomic Energy Agency JACoW Steering Committee Kyoto 27 May 2010.
Prospects for Hadron Physics in Asia H. Shimizu Laboratory of Nuclear Science Tohoku University,
Oct 8-9, 2005ACS Collaboration Meeting – Archamps, France The MicroIOC From Custom To Production First customer: PSI 25 pieces.
Asian Test Beam Facilities Satoru Uozumi Kyungpook National University Mar-29 th 2010 Beijing China IHEP Beijing TBF Russia.
1 Progress of the J-PARC Shoji Nagamiya Director, J-PARC Center at KEK/JAEA July 6, GeV PAC.
WG 2 Organizations ……. Items …. Proton driver (ex. For NuFact) Proton(hadron) accelerator (ex ELIT) Electron accelerator (ex.SBIR)
Present Status of EPICS Development at the 3GeV Proton Beam Transport Facility Control System in J-PARC JAERI Motoki OiTetuya KaiSinichiro Meigo Sinichi.
1 Current Status of The Control System for J-PARC Accelerator Complex Hiroshi YOSHIKAWA J-PARC Center at KEK/JAEA October 16, 2007 ICALEPCS2007 at Knoxville.
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
29 September 2006M.Sakuda NuFact06 Asian Regional Outlook (Japan) -by Y.Kuno (Osaka) (1) SuperBeam (T2K) (2) J-PARC current upgrade plan (3) T2HK or T2KK.
J-PARC Accelerator and Beam Simulations Sep. 7th, SAD2006 Masahito Tomizawa J-PARC Main Ring G., KEK Outline of J-PARC Accelerator Characteristics of High.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
1 Status of the T2K long baseline neutrino oscillation experiment Atsuko K. Ichikawa (Kyoto univeristy) For the T2K Collaboration.
T2K radioactive drainage treatment Nov Geneva Yuichi Oyama (KEK)
Recent Status and Future Plans at KEK Computing Research Center Nov. 28 th, 2007 at the 3rd CC-IN2P3 - CRC-KEK Meeting KEK Computing Research Center Setsuya.
LLRF Activities at KEK/J-PARC Zhigao Fang 1 SuperKEKB 2 cERL (compact Energy Recovery Linac) 3 STF (Superconducting RF Test Facility) 4 J-PARC LLRF workshop.
Python based particle tracking code for monitor design Kenichirou Satou J-PARC/KEK.
1 Heavy-Ion Physics at J-PARC Shoji Nagamiya RIKEN / KEK / JAEA January 20, 2016 Tokai 1) Motivation 2) J-PARC vs. FAIR.
1 J-PARC Status - Conquering the earthquake disaster and a new step forward to MW J-PARC operation - Yujiro Ikeda J-PARC Center JAEA & KEK
Presenter : Yang Wu McMaster University Work conducted at IHEP.
perfSONAR on Low Cost Hardware
Irradiated T2K Ti alloy materials test plans
Shuei YAMADA (KEK / J-PARC)
Simulation of secondary beam production at RISP
Accelerator control at iThemba LABS
Presented by Li Gang Accelerator Control Group
Laboratorio per dottorandi 2017 Particle Accelerators Control System
Atsushi Manabe and Takashi Sasaki
EPICS Activities in Japan N. Kamikubota, KEK/J-PARC
Development of new power supplies for J-PARC MR upgrade
Table 1: The specification of the PSICM and the ePSICM Prototypes
Interoperability of Digital Repositories
The EPICS running envirionments in the five accelerator projects
T2K water drainage / exhaust air
W. T. Weng Brookhaven National Laboratory
LAL meeting on e+ studies, Oct. 2010
Status of SuperKEKB May 11, 2007 SuperB Workshop Masa Yamauchi KEK.
Introduction to Single Board Computer
Industrial Use at J-PARC
Command and Data Handling
EPICS status and future at KEK Control Group / Commissioning Group e-/e+ Injector Linac, KEK, Japan Masanori Satoh.
What is “Control System” or “Framework”?
Presentation transcript:

Development Plan for Reliable Card-size IOC N. Kamikubota and S.Yamada, J-PARC/KEK May 2015 in MSU, kami, KEK/J-PARC

May 2015 in MSU, kami, J-PARC/KEK In KEK, Blueberry-Raspberry-BeagleBone Blueberry By T.Kato-san (retired), in his farm (in Mt. Tsukuba) By N.Yamamoto and others, in J-PARC CCR (KEK-Tokai) Homemade Jam Hobby, training ・ 4 BBB controllers, each has 4 RS232C ports ・ 16 radiation-monitoring devices ・ trial to use low-cost card-size PC as an EPICS IOC By T.Obina, in 2014 in cERL (KEK-Tsukuba) Raspberry pi BeagleBone Black cERL, radiation monitoring Fig.s by T.Obina

May 2015 in MSU, kami, J-PARC/KEK Reliabiliy ? ・ BBB controllers in cERL, KEK-Tsukuba, have been working without any problem since early 2014 ・ But.. potential risks to introduce many BBB pieces - hardware weakness, long-term reliability and availability, etc. Develop a Customized Card-size IOC ・ J-PARC/KEK started design study with a company in Japan ・ aims “reliable BBB” ; with simple I/O, not much CPU power ・ Attentions toward higher reliability - selected parts (long-life CPU, careful choice of C,R, etc.) - against EM noises (ferrite in DC line, bi/bo photo isolation, etc.)

Design study for customized IOC Fig. by M.Nishizawa, Beat System Service, Japan 1 LAN for EPICS CA, 1 LAN for a device Heat contact (no fan, 7W) 12V DC in w. ferrite bead Display+2 USB For maintenance 2 serial ports for devices (RS232C and RS485 as default) Intel E3815 (1.46GHz 1 core, 1 thread) 2-GB DDR3L-SDRAM memory 1 disk-slot (SSD mSATA) 4 bi and bo ports w. photo isolations A plan view, not the final design

May 2015 in MSU, kami, J-PARC/KEK Two Chassis Plans Schedule and Cost ・ FY2015: Design study -> produce a few pieces of prototype - arrange them as EPICS IOCs, field tests in J-PARC Initial Cost: \?,000k # (not decided yet) ・ FY2016: mass production (here “mass”= pieces) - replace VME-bus IOC for networked PLC etc. - ~10 pieces for newly introduced devices after 2016 expected cost: ~\120k(USD1k) per piece + chassis (\30k or \120k) Fig. by M.Nishizawa, Beat System Service, Japan Single Multi (Rack-mount)

May 2015 in MSU, kami, J-PARC/KEK To friends in EPICS Community ・ give us a good name for this customized IOC ex) Blueberry ? ・ ask volunteers to join “mass production” in 2016: producing more pieces turns to cheaper cost per piece Thank you for your attention

Appendix: Customized PC Spec (by Beat System Service)

Sept. 2012, kami, KEK/J-PARC by M.Nishizawa, Beat System Service, Japan

Appendix: Card-size PCs (comparison by T.Obina)

From the presentation by T.Obina [1] T.Obina, "Development of Compact Device Server with EPICS", PASJ2014-MOOL08, 11th Annual Meeting of Particle Accelerator Society of Japan, 2014 May 2015 in MSU, kami, J-PARC/KEK

From the presentation by T.Obina [1] T.Obina, "Development of Compact Device Server with EPICS", PASJ2014-MOOL08, 11th Annual Meeting of Particle Accelerator Society of Japan, 2014 Note: now (May 2015), Raspberry Pi2 with improved CPU (900MHz Q-core ARM Cortex-A7) is available

Appendix : J-PARC Facility

J-PARC Japan Proton Accelerator Research Complex A joint project between JAEA and KEK JAEA – Japan Atomic Energy Agency (Nuclear Facility) KEK – High Energy Accelerator Research Organization (Academic Institute like Universities) 400MeV Linac, 3GeV RCS, 50GeV MR –and 3 Experimental Facilities (MLF, HD, NU) –Exp. user-run started Dec.2008-Apr.2009 Site is in JAEA in Tokai, Ibaraki, Japan by JAEA by KEK

J-PARC Facility J-PARC = Japan Proton Accelerator Research Complex 3 GeV RCS (25 Hz, 1MW) Hadron Beam Facility (HD) Materials and Life Science Experimental Facility (MLF) Neutrino to Kamioka (NU) 30 GeV MR (0.75 MW) Linac (330m) High- Inten. Proton

J-PARC Facility (KEK/JAEA ) Bird’s eye photo in January of 2008 South to North Neutrino Beams (to Kamioka) JFY2009 Beams 30 GeV Main Ring Hadron Exp. Facility Materials and Life Experimental Facility JFY2008 Beams 3 GeV RCS CY2007 Beams Linac CCR (Central Control Room)

J-PARC and KEK Sites Tsukuba KEK- Tsukuba Tokyo Tokai Tokyo-Narita Int’l Airport JAEA-Tokai 50km KEK- Tokai J-PARC is a Joint project: -> JAEA - Linac and RCS -> KEK - MR Shuttle Bus (90min.)

Recent Trials toward High-Power High-Power Trials –RCS: Dec.2014, success in transporting 1-MW equivalent beam to the MLF Target LI/RCS/MLF’s design goal is 1MW –MR: Mar.2015, one-shot trial reached at 390kW MR design goal is 750kW User Operations –MLF: 400kW user-run since Mar.2015 (before 300kW) 500kW user-run since Apr.2015 –MR: over 300kW for NU since Mar.2015 (before ~250kW) kW for NU in May 2015 * we will continue efforts to reach to the design goals May 2015 in MSU, kami, J-PARC/KEK