AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.

Slides:



Advertisements
Similar presentations
LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague1 LED notched fibre system at AHCAL Calibration system for SiPM Ivo Polák 1.Notched fibre.
Advertisements

Calice, UT ArlingtonJiri Kvasnicka, FZU, Prague1 LED notched fiber system Jiri Kvasnicka 1.Introduction 2.Test setup and fiber layout on HBU0.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
Optical calibration system for EUDET AHCAL module Jaroslav Cvach IPASCR 1.Calibration system for SiPM photodetectors 2.QRLED driver photoelectron spectra.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL Electronics. Status EUDET Prototype Mathias Reinecke for the DESY AHCAL developers EUDET Electronics/DAQ meeting London, June 9th, 2009.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
AHCAL Electronics. Front-end electronics and DAQ Mathias Reinecke CALICE meeting Hamburg March 21st, 2013.
AHCAL Electronics. Status and Outlook Mathias Reinecke AHCAL main Meeting D ESY Hamburg, Dec. 16th, 2014.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
AHCAL – DIF Interface EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
LCWA, ALCPG 2009 Albuquerque, NM Ivo Polák, FZU, Prague1 Calibration system of CALICE AHCAL detector Ivo Polák 1.Two calibration light distribution.
AHCAL updates: SPIROC and DIF Mathias Reinecke, Felix Sefkow CALICE/EUDET electronics meeting London, January 10, 2008.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
08/10/2007Julie Prast, LAPP, Annecy1 The DHCAL DIF and the DIF Task Force Julie Prast, LAPP, Annecy.
AHCAL Status. Electronics and DAQ Mathias Reinecke CALICE meeting Argonne ANL, Mar. 19th, 2014.
HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System.
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
Detector Interface (DIF) Status CALICE meeting – DESYDec Mathias Reinecke.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
5 July 2010Ivo Polák, FZU, Prague LED notched fibre distributing system Calibration system for SiPM Ivo Polák, Ji ř í Kvasni č ka
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
AHCAL electronics. Status Module Production an Power Pulsing Mathias Reinecke AHCAL main meeting DESY, Dec. 10th, 2013.
AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
Mathias Reinecke CALICE week Manchester DIF development – Status and Common Approach Mathias Reinecke for the CALICE DAQ and Front-End developers.
SPIROC update Felix Sefkow Most slides from Ludovic Raux HCAL main meeting April 18, 2007.
Visit to CALICE ECAL testbeam (by Shinshu) at DESY, 16 th – 19 th October 2012 Samir Arfaoui & Erik van der Kraaij 30 th October 2012.
Main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers HCAL main meeting, DESY.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
Mathias Reinecke AHCAL Main Meeting Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
AHCAL Electronics. integration status and open issues Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
Mathias Reinecke EUDET Annual Meeting 2008 – NIKHEF AHCAL Power Aspects P. Göttlicher, M. Reinecke, H.-J. Wentzlaff for the AHCAL developers.
14 jan 2010 CALICE/EUDET FEE status C. de LA TAILLE.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
Front-end Electronic for the CALICE ECAL Physic Prototype Christophe de La Taille Julien Fleury Gisèle Martin-Chassard Front-end Electronic for the CALICE.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
14.4. Readout systems for innovative calorimeters
LED notched fibre distributing system Calibration system for SiPM
STATUS OF SPIROC measurement
DIF – LDA Command Interface
LED notched fibre system short HBU0 party with QMB6
AHCAL Beam Interface (BIF)
Status of HBU, EBU and SM_HBU
CALICE meeting 2007 – Prague
HCAL task status report
Testbeam Timing Issues.
LED notched fibre system at AHCAL Calibration system for SiPM
HCAL Modules -First Ideas
CALICE/EUDET Electronics in 2007
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
UK ECAL Hardware Status
STATUS OF SKIROC and ECAL FE PCB
ECAL Electronics Status
On behalf of CEPC calorimeter working group
CALICE meeting 2007 – Prague
Stéphane Callier, Dominique Cuisy, Julien Fleury
Status of the EUDET Prototype
AIDA KICK OFF MEETING WP9
Scintillator HCal Prototype
Presentation transcript:

AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010

Mathias Reinecke | CALICE AHCAL / ECAL meeting | July 5th, 2010 | Page 2 Outline > Status Electronics / Hamburg Activities  Testbeam Setup (HBU_II)  Laboratory Setup (HBU_I) > Next Generation (Full Layer EUDET Module)  Status Redesigns Boards (DESY)  LED Systems for Calibration  Tiles > Status DAQ / Discussion about CALICE DAQ > Conclusion

Mathias Reinecke | CALICE AHCAL / ECAL meeting | July 5th, 2010 | Page 3 DESY Testbeam Setup – HBU_II Pedestal MIP Peak Pixels! > DESY 6GeV electron Testbeam operation: Setup optimization, Channel-wise calibration with MIPs: Mark Terwort > Integrated LED System, uniformity studies / optimiz.: Julian Sauer > For detailed results on both: See Julian’s talk

Mathias Reinecke | CALICE AHCAL / ECAL meeting | July 5th, 2010 | Page 4 Charge Injection Setup – HBU_I in laboratory

Mathias Reinecke | CALICE AHCAL / ECAL meeting | July 5th, 2010 | Page 5 SPIROC2 HOLD Scans – Internal Trigger (Autotrigger) Results for Autotrigger agree with the external trigger results. ‘Autotrigger’: Most important operation mode for SPIROC2 => ‘ILC mode’

Mathias Reinecke | CALICE AHCAL / ECAL meeting | July 5th, 2010 | Page 6 Autotrigger Threshold Adjustment ~172 DACtics / pC pedestal 1 MIP (1.602pC) Autotrigger studies (e.g. threshold definition) currently ongoing. Tests/studies/analysis are performed by Jeremy Rouene.

Mathias Reinecke | CALICE AHCAL / ECAL meeting | July 5th, 2010 | Page 7 Rate dependency (SP22, LG, small input charge) Injected Charge: 10.47pC signal on memcell1 is stored the longest time. More results on SPIROC2 tests in “electronics/DAQ” session (there are quite some unknown effects that need clarification). No signal loss during storage in analogue memory can be observed!

Mathias Reinecke | CALICE AHCAL / ECAL meeting | July 5th, 2010 | Page 8 New generation’s modules Designs to be done: CIB, SIB, DIF, CALIB2, POWER2, HBU2, (Flexleads)

Mathias Reinecke | CALICE AHCAL / ECAL meeting | July 5th, 2010 | Page 9 AHCAL Layer – Cross Section (Height Limitations) Compliant with Steel and Tungsten options.

Mathias Reinecke | CALICE AHCAL / ECAL meeting | July 5th, 2010 | Page 10 Status Redesigns done in preparation not started yet > Most critical part: HBU2 (depends still on results from ASIC tests, input from Wuppertal and Prague, complex PCB production). > SIB is not needed for layer module => delayed. > all modules needed for EUDET layer-module. DESY Redesigns: M. Zeribi, H. Wentzlaff, M. Reinecke

Mathias Reinecke | CALICE AHCAL / ECAL meeting | July 5th, 2010 | Page 11 CALIB2 module (in production) 10cm ~7.3cm Connector to CIB ARM7 µController JTAG- and test- connectors

Mathias Reinecke | CALICE AHCAL / ECAL meeting | July 5th, 2010 | Page 12 EUDET Tiles The first 50 have arrived from ITEP in Hamburg – Thank You!!!

Mathias Reinecke | CALICE AHCAL / ECAL meeting | July 5th, 2010 | Page 13 EUDET Tiles - Dimensions Nominal tile distance: 100 µm

Mathias Reinecke | CALICE AHCAL / ECAL meeting | July 5th, 2010 | Page 14 EUDET Tiles – Definition for HBU redesign > If dimensions of tile-series production differs from this table, the tiles won’t fit into the HBU. > New strategy for dimension-checking: See Karsten Gadow’s talk!

Mathias Reinecke | CALICE AHCAL / ECAL meeting | July 5th, 2010 | Page 15 LED Calibration Systems I – ASCR Prague QRLD6x board (ASCR Prague) HBU (DESY) Fiber TCALIB (CALIB to QRLD6x)

Mathias Reinecke | CALICE AHCAL / ECAL meeting | July 5th, 2010 | Page 16 LED Calibration Systems I – ASCR Prague > Dynamic range under investigation. > HBU2 will have room for 3 fibre rows > CALIB2 triggers the QRLD6x > Problems: fiber routing, channel uniformity, dynamic range See next talk!!

Mathias Reinecke | CALICE AHCAL / ECAL meeting | July 5th, 2010 | Page 17 LED Calibration Systems II – DESY + Uni Wuppertal > LED uniformity under investigation (see Julian’s talk). > Wuppertal recommended new LED driving circuit and new LED type with lower spread in output. > HBU2 will contain solder parameter field in order to adjust LED power per channel. > Problems: LED light output spread, dynamic range (saturation) LED 1 Cent

Mathias Reinecke | CALICE AHCAL / ECAL meeting | July 5th, 2010 | Page 18 AHCAL DAQ – currently still Labview and USB > CALICE DAQ integration still not scheduled  hardware missing (e.g C&C to LDA, not all LDA outputs work)  DAQ operation/firmware: LLR did great progress, but parallel development does not make sense. > DIF firmware structure/block definition within DIF task force  first step for CALICE DAQ integration  AHCAL DAQ runs with specified command set. > AHCAL layer module cannot really run with USB DAQ – data taking is too slow. > See talks from Matthew, Remi and Vincent about DAQ status/schedules. Discussion about DAQ integration strategy necessary in my opinion.

Mathias Reinecke | CALICE AHCAL / ECAL meeting | July 5th, 2010 | Page 19 Conclusions and Outlook > 2 prototype setups running in parallel in Hamburg: testbeam & lab. > redesigns are ongoing, but are delayed by ongoing system tests and a bottleneck in layouter menpower resources. > CALICE DAQ integration strongly delayed due to situation in UK. > LED calibration system development ongoing with 2 options.