Effective Problem Solving in Interpersonal Communications Lecture 4: Effective Communications Training.

Slides:



Advertisements
Similar presentations
Chapter 7 Managing Risk.
Advertisements

Project management Information systems for management1 Project Management.
Problem Solving.
1 1 Slide © 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
BSBIMN501A QUEENSLAND INTERNATIONAL BUSINESS ACADEMY.
Chapter 7: Managing Risk
Decision Making, Learning, Creativity, and Entrepreneurship
Dr. Ron Lembke SCM 462.  Financial return  Impact on customers and organizational effectiveness  Probability of success  Impact on employees  Fit.
Business Studies Grade 11.
Human Relations Creative Problem Solving and Decision Making.
The Rational Decision-Making Process
6/5/2007SE Survival Exercise Recap1 Team Software Project (TSP) June 05, 2007 Planning, Quality, Risks.
1 Risk and Uncertainty Management. 2 Rather than passively accepting risks, many managers see it as their duty to take actions to reduce them Indeed,
Managing Project Risk.
An Approach to Case Analysis
Copyright c 2006 Oxford University Press 1 Chapter 7 Solving Problems and Making Decisions Problem solving is the communication that analyzes the problem.
Assignment 2 Case Study. Criteria Weightage - 60 % Due Date – 11 th October 2012 Length of Analysis – 2500 words Leverage % including appendices,
PRM 702 Project Risk Management Lecture #28
Decision-Making In Project Management Decision Framing Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada Tel: +1(403) Fax:
Managing Risk. Objectives  To Describe Risk Management concepts and techniques  To calculate and analyze a project using Probability of completion 
Risk management process
9-2  Problem: a discrepancy between the current state – what actually is happening – and a desired goal – what should be happening  Undesirable situation.
Management & Development of Complex Projects Course Code MS Project Management Risk Management Framework Lecture # 22.
Decision making, FUIEMS, 29 December, Decision-Making Process Engineering Economics Lecture # 15.
10/25/2015 IENG 471 Facilities Planning 1 IENG Lecture 08 Teaming and Effective Meetings.
Teamwork Goal 4.01: Demonstrate characteristics of effective leadership.
Risk management (lecture). D efinitions of risk General: standard deviation Finance: volatility of return and costs Risk in project management (Lockyer.
MBTI and Decision Making: The Z Model (
Project Management All projects need to be “managed” –Cost (people-effort, tools, education, etc.) –schedule –deliverables and “associated” characteristics.
A Critical Thinking Problem Solving Model
Approaches to Problem Solving. There are many approaches to problem-solving. What follows in this PowerPoint are several that provide an opportunity for.
Lecture : 5 Problem Identification And Problem solving.
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Introducing Project Management Update December 2011.
International Marketing Final Term Presentation: Presented to: Presented to: Mr. Ali Saeed Mr. Ali Saeed Presented by: Presented by: Ibrar Ahmed Hunzai.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Risk Management. 7–2 Where We Are Now 7–3 Risk Management Process Risk –Uncertain or chance events that planning can not overcome or control. Risk Management.
MODULE 9 MANAGERS AS DECISION MAKERS “Decide first, then act” How do managers use information to make decisions and solve problems? What are the steps.
Adeyl Khan, Faculty, BBA, NSU 1. Sorting, Categorizing, Rating and Evaluating a large quantity of ideas. Simple checklists To complex weighted scoring.
Teams succeed when members have:  commitment to common objectives;  defined roles and responsibilities;  effective decision systems, communication and.
Presented by The Solutions Group Decision Making Tools.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
CIW Lesson 10 Part A NAME:____________________________.
Project Management Planning and Scheduling. “Failing to plan is planning to fail” by J. Hinze, Construction Planning and Scheduling Planning: “what” is.
Managing Project Risk – A simplified approach Presented by : Damian Leonard.
PROBLEM SOLVING. Definition The act of defining a problem; determining the cause of the problem; identifying, prioritizing and selecting alternatives.
Decision Making LESSON 6 Well-considered decisions are essential for team success. If a poor decision is made, the team may risk failure, resulting in.
+ CIW Lesson 10 Part A. + IT Project and Program Management Successfully managed IT projects increase productivity and increase profits IT projects differ.
Management & Planning Tools
The Logical Framework Approach
Operations Management
BUSINESS AND MANAGEMENT
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
Employability Skills Unit introduction Ainsley Smith
Input your Massage Text / Input your Massage Text
SWOT Analysis Use this space for description of Strengths: Point 1
Assignment Name:-Planning Tools Submit To:- Sir Fahad Maqbool Submit By:-Zunera Latif Roll No: (1.5 year) Registration No:-2017-GCUF- Government.
کنکور کارشناسی ارشد 93 مدیریت
Software Project Management (SPM)
Session objectives Identify strengths and weaknesses of cross-cultural teams Learn to identify potential trouble-spots in cross-cultural teams Develop.
Use and Practice of SWOT Analysis
Risk management.
Tools for Implementation
Step-by-Step SWOT Toolkit:
Tools for Implementation
1 Hour Training Bubbles Problem Solving Techniques
Step-by-Step SWOT Toolkit:
33rd BAT, Module I: Organization Behavior
Risk management.
Problem-Solving Communication
Presentation transcript:

Effective Problem Solving in Interpersonal Communications Lecture 4: Effective Communications Training

Problem Solving Content Issues Description of Problem Factors: Constructive vs Limiting Ownership Scope of Problem Consequence of Problem Alternative Solutions Rank Ordered Solutions

Process Issues in Problem Solving Individuals in relationship are seen as the problem solvers Motivation of the problem solvers Decision making involved in selecting solution Execution of the solution decided upon

Problem Solving Model

Components of Problem

Visceral Components of the Problem Size of Problem - costs, risks, losses Sensory Input How’s it look? How’s it sound? How’s it taste? How’s its smell? How’s it feel?

Personal Components of the Problem Inside perspective of relationship members of the problem Relationship members as a whole seen as as problem solvers

What’s Needed to Improve Relationship Problem Solving Process Unconditional acceptance & non-judgmental attitude of participants in relationship Respect for each participant’s input Freedom to openly express emotional response to the problem & solutions Defined limits and boundaries on problem solving process

Reality Testing of Possible Solutions to Problem Brainstorming Critical Path Analysis Decision Trees Force Field Analysis PMI Plus – Minus – Interesting SWOT Analysis – Strengths, Weaknesses, Opportunities, Threats

Brainstorming Set a time frame to be completed Be clear what problem you are trying to solve All ideas should be heard. No idea is too wild to be expressed. Quantity is wanted; each idea coming to mind should be expressed. Combining ideas for improvement is highly desirable. Criticism or negative discussion regarding ideas is absolutely forbidden.

Critical Path Analysis Calculate length of time to complete project List all activities in plan by: start date, duration, if parallel or sequential If dependent on what do they depend Graph it out, Plot tasks on graph Schedule Activities Critical path-longest sequence of dependent activities that lead to completion of plan

Decision Trees Start with the decision which needs to be made draw a box Draw to right possible solutions on lines At End of each line if result is uncertain draw circle if other decision draw box From the other decisions draw lines for options which can be taken Calculate decision which has greatest worth to you and give it a value Estimate probability of each uncertainty

Force Field Analysis List all forces for change in one column List all forces against change in other Assign a score to each force 1(weak)-5(strong) Draw diagram showing forces for & against and size of forces Helps weigh importance of factors as to if pursue or not the plan

PMI- Plus/Minus/Interesting Plus Column: all positive points of taking the action Negative Column: all negative effects Interesting Column: extended implications of taking action, whether positive or negative Assign positive or negative scores

SWOT Analysis Strengths: advantages, what you do well Weaknesses: could be improved, done badly, should be avoided Opportunities: good chances, interesting trends Threats: obstacles, competition, are required specifications changing

Stimulus Question So what limits and boundaries would you implement for effective relationship problem solving?