October 6, 2009Bill Wisniewski1 State of drawings Remedies? Forward Region DIRC/DCH/EMC interplay Road Trip Discussion Beam pipe & forward cone plug ‘Quick’

Slides:



Advertisements
Similar presentations
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Advertisements

Beam-plug under M2 and HCAL shielding studies Robert Paluch, Burkhard Schmidt October 9,
Engineering Division 1 HFT Middle Support Cylinder Eric Anderssen, LBNL.
PANDA Mechanical Workshop Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Mechanical Workshop GSI
GlueX Simulations Status Report on CD3 geometry Richard Jones GlueX Collaboration Meeting, Newport News, January 10-12, 2008.
BaBar: The Detector Richard F Boyce 21 October 2003.
Global Design Effort Detector concept Plenary introductory talk IRENG07 Kurt Krempetz September 17, 2007.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
October 21, 2003H.J. Krebs1 LST Mechanical Design Review Handling & Installation Fixtures Design and Fabrication Status H.J. Krebs October 10, 2003.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
EBD existing crane details and future bridge crane upgrade Alev Ibrahimov June
1 Jim Thomas - LBL The Mechanical Integration Challenge for New Tracking Detectors in STAR Jim Thomas 07/10/2006.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
September 18, 2007H. J. Krebs1 SiD Collaboration One Piece End Door Design Concept plus Forward Equipment Interfaces H. James Krebs SLAC September 18,
Zian Zhu Magnet parameters Coil/Cryostat/Support design Magnetic field analysis Cryogenics Iron yoke structure Mechanical Integration Superconducting Magnet.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Adrian Bevan Queen Mary, University of London SVT Mechanical Support and Strip Sensors.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Blair Ratcliff, SLACUS R&D Meeting, Sept. 3, 2008 Blair Ratcliff SLAC Detector R&D: Overview and Opportunities Detector Overview (some old news!). Present.
GLD experimental hall and detector assembly Y.Sugimoto KEK 27 Sep
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
DON LYNCH OCTOBER 28, October 28, 2014 sPHENIX Detector Integration & Assembly Concept.
William Lockman UC Santa Cruz May 6, 2005MDI meeting G4 simulation: status and validation strategy Goals Contributors Status Needed plots Future tasks.
SPHENIX MECHANICAL D. Lynch & R. Ruggiero July 31, /29/2014sPHENIX Mechanical Design.
May 31, 2010Bill Wisniewski1 Mechanical Integration Issues.
October 7, 2009H.J. Krebs1 Super B WorkShop Overview of BaBar Detector Assembly/Installation Documentation Jim Krebs.
Integration Prototype1 BaBar Integration as a Prototype for SuperB Bill Wisniewski SuperB Workshop at LNF 6 April 2011.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
SuperB Meeting XVII May 28 – June 2, 2011 IR design status 1 IR Design Status and Update M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
Comments on Services Elba Comments on Services & … Bill Wisniewski SLAC.
01 June 2011F. Raffaelli1 Super B Mechanical integration. List of reference persons and institutions for the mechanic of the sub detectors. Review of the.
ATLAS ID Services Mock Up - Proposal Presented by Ian Wilmut at DESY, update from John Hill 4th May, 20101ATLAS Upgrade - RAL.
Backward EMC Task Force Report – Elba Backward EMC Task Force Dave Aston, Gianluigi Cibinetto, Steve Robertson, Achille Stocchi, Bill Wisniewski.
SuperB Gen meeting Oct 5-9, 2009 IR Interface 1 IR Interface Issues M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni, P. Raimondi, et al.
Straw man layout for ATLAS ID for SLHC
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
M Sullivan SuperB Workshop Elba, Italy May 31 - Jun 3, 2008
Interaction Region and Detector
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
Introduction BaBar Components The Problem IFR Upgrade: 2004 & 2005
M. Sullivan SuperB General Meeting Perugia, Italy June 15-20, 2009
ETD summary D. Breton, S.Luitz, U.Marconi
Present status of the flux return yoke design
Facilities, Assembly, Integration
Bill Wisniewski SuperB Frascati Meeting September 30, 2010
Transport Issues for EMC Barrel
Workshop Goals for the Detector Groups
WBS: : Tracking for CLAS12
SuperB EMC Computing Foreseen activities and software/computing needs
IFR detector mechanics
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
ILD-0 overall dimensions C.Clerc ILD meeting, Seoul 17/02/09
Integration and IR Hall
Francesco Forti SuperB Workshop LNF, March, 2006
DET. Integration Inner detector envelope Radial clearances.
SuperB Integration Summary of previous integration sessions.
Inner DET. Integration Inner detector envelope Radial clearances.
as a prototype for Super c-tau factory
SuperB Integration Summary of the Integration Status
Some of the Points Raised During my JLAB Visit
F.Pasdeloup, H.Prin, L. Williams
Presentation transcript:

October 6, 2009Bill Wisniewski1 State of drawings Remedies? Forward Region DIRC/DCH/EMC interplay Road Trip Discussion Beam pipe & forward cone plug ‘Quick’ SVT removal The picture at the backward end: DIRC SOB joint Region for backward endcap & DCh electronics Backward plug mods? Assembly and Integration Drawing to be updated with current info.

October 6, 2009Bill Wisniewski2 BaBar had attempted to use one CAD package, but executed the drafting project poorly (revolving door for designers). At the end of the construction project, there was no effort available to clean up the drawings, since upgrades intruded. Jim Krebs knowledge: He does not know of any 3-D models that pertain to detector assembly and installation. He knows of 1 2-D CAD drawing for assembly and installation: the y-z cross section of the detector. A CD exists with 2-D AutoCAD drawings of the Flux Return. SLAC has a central drawings archive. Since this was developed in the age of paper and microfilm, it offers limited 2D drawings that would need to be ‘re-drawn’ to be useful: a dreadful task. Drawings exist in PDF format: This may present problems of its own, perhaps, in ability to get onto this site and extract drawings. State of Drawings

October 6, 2009Bill Wisniewski3 The place of particular interest now is the forward endcap region. Before removal of the forward EMC endcap, its position will be surveyed with respect to the steel and EMC barrel. After removal, the cone of the EMC barrel will be surveyed, and the position of the end of the DIRC support cylinder and DCH will be surveyed. An updated drawing will be made. Drawings for many subsystems exist, often in CAD as well as paper. CAD drawing packages will be hunted out for the EMC (ProE files exist, but do we have them all?). DIRC structural support drawings may exist at LBNL, SOB and local region in France. Design folks for systems will be contacted more systematically. Retirements, distance in time, disposal of drawings a few years after construction, incompatibility of files may limit the success of this effort…but we need to try. Remedies

October 6, 2009Bill Wisniewski4 A conceptual design for the Forward TOF detector has been worked on by Orsay engineers. In the concept developed, the detector is mounted off the forward end of the drift chamber, assuming a cone shaped DCH endplate. Forward Region

October 6, 2009Bill Wisniewski5 This is a problem for the EMC: For best performance, material should be placed as close to the crystals as possible(ie, mounted on the EMC endcap) But… Face of the endcap is perpendicular to a ray from close to the IP at the face’s center Best performance of the TOF requires that the outer radius be normal. To be understood…. Forward Region

October 6, 2009Bill Wisniewski6 Beam Pipe & Forward Cone BaBar situation: needed to magnetically shield the forward Q2 magnet. The consequence was a very complicated forward plug that has a very small aperture into the magnet.

October 6, 2009Bill Wisniewski7 Beam Pipe & Forward Cone For SuperB, the beam pipe is rather larger, and the opening angle forces it to be substantially larger at the forward door/forward plug. The plug will need to be modified to accommodate the beam pipe. Consequences: will need to analyze effects on the field, forces on both forward and backward plugs. Superconducting beam elements help set scale for DCH ID

October 6, 2009Bill Wisniewski8 D&D Progress

October 6, 2009Bill Wisniewski9 Quick Removal Installation schemes considered for the SVT and the magnet components may be leveraged to allow easy retraction of the SVT, making repairs less of a danger than in BaBar. A rail system will do well here, as seen in the next slide for BaBar. Before the rail system, removal was a nail-biting day. With rails, a couple of hours. Forward end cables for SVT can ride out with beam line elements, relieving forward services congestion, perhaps.

October 6, 2009Bill Wisniewski10

October 6, 2009Bill Wisniewski11 DIRC support tube/camera interface looked at The Sage of North Carolina (Jim Krebs) described the gap between current backward plug and the DCH electronics: there was ~10-15cm gap for the never built BaBar backward EMC endcap! Life may be easier…. It may be we can eliminate the plug and simplify life. In any case, it must be modified to account for forces from changes to the forward plug. The backward plug makes cabling painful. Backward Region Picture