MicroBooNE Experiment Gina Rameika Fermilab DOE Annual Science & Review July 12-14, 2010.

Slides:



Advertisements
Similar presentations
S4 Proposal for a Liquid Argon Detector at DUSEL Marvin L. Marshak/University of Minnesota Thanks to Bonnie Fleming for multiple slides. 1.
Advertisements

J. Strait Fermilab October 21, 2005 The Neutrino Detector of the Future: A Massive Liquid Argon TPC.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
P AUL N IENABER S AINT M ARY ’ S U NIVERSITY OF M INNESOTA FOR THE M INI B OO NE C OLLABORATION J ULY DPF2009.
Cryogenic discussion and update 30 October 2014Neutrino platform.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
4 years resident of Ukrainian Village, Chicago outline 1. Introduction
Particle Physics Design Group Studies Big Liquid Argon Neutrino Detector Subgroup Particle Physics Design Group Studies: The BLAND Subgroup BLAND.
K.T. McDonald DUSEL Workshop (BNL) Oct. 16, What Do We (I?) Know About Efficiency And Backgrounds in e Appearance Studies with a Large Liquid Argon.
K.T. McDonald June 18, 2009 DUSEL FNAL 1 Strategies for Liquid Argon Detectors at DUSEL Kirk T. McDonald Princeton University (June 18, 2009)
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
Doug Michael Jan. 12, First goal is to be ready to select an optimal technology in ~one year. –Demonstrate that fundamental technologies are ready.
2/21/2008 P5 neutrino session1 Conventional neutrino experiments Heidi Schellman P5 February 21, 2008.
1 MicroBooNE: LarSoft Simulation & PMT Response Tests Jessica Esquivel August Nevis Labs, Columbia University.
Designs of Large Liquid Argon TPCs — from MicroBooNE to LBNE LAr40 Bo Yu Brookhaven National Laboratory On behalf of MicroBooNE and the LBNE LAr Working.
LAr20 Goals & Plans Integrated R&D Plan Development Bruce Baller November 23, 2009.
Some Work on Liquid Argon Purity at Fermilab f 6/9/2011 S. Pordes TIPP 1.
July 19, 2003 HEP03, Aachen P. Shanahan MINOS Collaboration 1 STATUS of the MINOS Experiment Argonne Athens Brookhaven Caltech Cambridge Campinas Dubna.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
Optical System for MicroBooNE
CERN LBNE Test Experiment. Plan view of Bat
LBNE Reconfiguration Workshop – April 2012 FD Assumptions and Cost Estimate 1 Bruce Baller.
Detection of Cerenkov light emission in LAr Ettore Segreto University of L’Aquila Ettore Segreto University of L’Aquila Cryodet International Workshop.
The CAPTAIN Detector Liquid argon TPC – 5 instrumented tons – hexagonal TPC with vertical drift – 2000 channels, 3mm pitch – cryostat 7700 liter capacity,
A study of columnar recombination in the ArgoNeuT LArTPC arXiv:1306
MiniBoone Detector: Digitization at Feed Through Student: John Odeghe ; SC State, Fermi Lab Intern Supervisor: JinYuan Wu; Fermi Lab 1.
Liquid Argon is a bright Scintillator (40,000 photons/MeV) and allows free electrons to drift meters under electric fields of 0.5 kV/cm. Liquid Argon presents.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
Liquid Argon Time Projection Chamber: Purity and Purity Monitoring DAVID GERSTLE – LArTPC – YALE UNIVERSITY/FNAL 31 May 2006 – FNAL Users’ Meeting Materials.
Long Baseline Experiments at Fermilab Maury Goodman.
Future Neutrino Physics Mitch Soderberg Fermilab Institutional Review June 6-9, 2011.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans S. Pordes Argon Purity1Integrated R & D Plan Review.
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013.
Challenges & Issues for SBNE Nigel S. Lockyer 4/4/14.
Preliminary Results from the MINER A Experiment Deborah Harris Fermilab on behalf of the MINERvA Collaboration.
Poster Design & Printing by Genigraphics ® Neutrino Interactions Studying the properties of neutrinos will shed light on the origin of the.
1 Liquid Argon Dark Matter: Synergies with R&D for Neutrino Detectors: Chemically clean Argon for drifting electrons and light output (Oxygen and H20 relevant.
1/26/2009 S. Pordes LAr R & D Briefing 1 Liquid Argon R & D work at Fermilab neutrinos WIMPS.
Questions and challenges of an underground multi-kton LAr TPC detector Outline Introductory Remarks Detector Optimization Vessel construction and integration.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
NuMI Off-Axis Experiment Alfons Weber University of Oxford & Rutherford Appleton Laboratory EPS2003, Aachen July 19, 2003.
David Finley, Fermilab / October 3, 2005 on LArTPC Slide 1 LArTPC: Large Liquid Argon TPC for the NuMI Off-axis Beam First Point: Try to recognize intellectually,
LAr1 Plans at FNAL Bruce Baller - Fermilab. Outline LAGUNA Meeting - Mar  LBNE LAr detector overview  Prototyping plan  1 kton prototype.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
Medium baseline neutrino oscillation searches Andrew Bazarko, Princeton University Les Houches, 20 June 2001 LSND: MeVdecay at rest MeVdecay in flight.
Preliminary results on Copper filters, with FLIC test chamber F. Pietropaolo, A. Zani, M. Meli CENF General Meeting – 22/10/2015.
1/26/2009 S. Pordes LAr R & D Briefing 1 Liquid Argon presents prospect of continuously live Imaging Calorimeter C. Rubbia.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
David Finley / PPD Engineering Meeting / June 24, Fermilab Slide 1 R&D Toward Large Liquid Argon Time Projection Chambers “Large” means up to 100.
The ModuLAr Project LoI discussion INFN-LNL 21/11/2007 Legnaro (PD)
MicroBooNE Experiment Cat James – MicroBooNE Project Manager DOE Managers Site Visit August 23, 2010.
Science Requirements and Instrumentation for Future Neutrino Experiments Gina Rameika, Fermilab Instrumentation Frontier Community Planning January 9 –
Cryogenic Test Stand Facilities at PAB: Stephen Pordes Neutrino R&D Workshop January 20 –
Stephen Pordes – DOE Review of Laboratory Detector R&D, July 24, Liquid Argon is a bright Scintillator (40,000 photons/MeV) and allows free electrons.
1 Cary Kendziora Fermi National Laboratory Cary Kendziora Fermi National Laboratory CEC-ICMC 2013 Anchorage Alaska – June, 2012.
Fermilab Budget Briefing FY 2014 Intensity Frontier Proton Research KA Breakout February 28, 2013 Office of High Energy Physics Germantown, MD.
Daniel H. Gutiérrez Velázquez Fermi National Accelerator Laboratory PPD – Neutrino MicroBooNE.
ΜTPC Reconstruction Status Report (…mostly a late night / weekend project … ) D. A. Jensen March 1, 2007.
ICARUS-LBNE project A. Guglielmi 1.LBNE-ICARUS Padova meeting 2.SPS-C C. Rubbia presentation.
WA105 6x6x6 Cryogenics David Montanari / Johan Bremer Sep 21, 2015 Rev. 1.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
DOE review slide 1 MINOS Software and Data Analysis Peter Litchfield, U. of Minnesota DOE Review, 28 th August 2003  Progress on Offline Software  Detector.
Installation of the T600 at Fermilab
LAr TPC: Status and progress in data analysis efforts
Albert Einstein Center for Fundamental Physics
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Presentation transcript:

MicroBooNE Experiment Gina Rameika Fermilab DOE Annual Science & Review July 12-14, 2010

Gina Rameika, Fermilab - DOE Science &Technology Review July 12-14, 2010 Introduction  MicroBooNE is –  A liquid argon Time Projection Chamber (LAr-TPC), situated on the Booster Neutrino Beam.  It combines physics and hardware development goals, using both to demonstrate the technology as an option for massive neutrino detectors.  The detector design, fabrication and installation is managed as a DOE Project, with financial contributions from NSF  Total DOE project cost (TPC) is set to be under $20M 2

Gina Rameika, Fermilab - DOE Science &Technology Review July 12-14, 2010 MicroBooNE Collaboration  Brookhaven Lab: H. Chen, J. Farrell, F. Lanni, D. Lissauer, D. Makowiecji, J. Mead, V. Radeka, S. Rescia, J. Sondericker, C. Thorn, B. Yu  Columbia University: L. Camilleri, C. Mariani, M. Shaevitz, B. Willis**  FermiLab: B. Baller, C. James, S. Pordes, G. Rameika, B. Rebel, D. Schmitz, J. Wu  Kansas State University: T. Bolton, G. Horton-Smith, D. McKee  Los Alamos Lab: G. Garvey, J. Gonzales, B. Louis, C. Mauger, G. Mills, Z. Pavlovic, R. Van de Water, H. White, S. Zeller  Massachusetts Institute of Technology: W. Barletta, L. Bugel, J. Conrad, C. Ignarra, B. Jones, G. Karagiorgi, T. Katori, H. Tanaka  Michigan State University: C. Bromberg, D. Edmunds  Princeton University: K. McDonald, C. Lu, Q. He  St. Marys: P. Nienaber  University of California, Los Angelas: H. Wang  University of Cincinnati: R. Johnson, A. Wickremasinghe  University of Texas at Austin: S. Kopp, K. Lang  Yale University: C. Anderson, B. T. Fleming*, S. Linden, K. Partyka, M. Soderberg, J. Spitz *=Spokesperson, **=Deputy Spokesperson 3 13 institutions 58 collaborators NSF funded/DOE funded

Gina Rameika, Fermilab - DOE Science &Technology Review July 12-14, 2010 Why LAr-TPC  Detectors for neutrino appearance experiments need good e -  separation, to identify CC e signal events from NC background events 4 LAr-TPC detectors produce bubble-chamber like visualization of events One can have particle ID capability, from dE/dx along a track In particular, electron-  separation Monte Carlo  An attractive detector technology for neutrino physics  Fine-grained tracking, and energy deposition information ArgoNeuT anti-neutrino event, 2010

Gina Rameika, Fermilab - DOE Science &Technology Review July 12-14, 2010 LAr – Water Cherenkov comparison  Neutrino Oscillation Sensitivities  Factor of ~6 in Mass (100kT WC ~ 17kT LAr) 5

Gina Rameika, Fermilab - DOE Science &Technology Review July 12-14, 2010 LAr-TPC Development Program at FNAL  In principle, these detectors are scalable to large sizes  Future neutrino experiments will require massive detectors  “Integrated Plan for LAr-TPC neutrino detectors in the U.S.” submitted to DOE in December  Produced by a committee of enthusiasts from the Lab and University community  The MicroBooNE detector is a part of this plan 6

Gina Rameika, Fermilab - DOE Science &Technology Review July 12-14, 2010 MicroBooNE Physics Goals  MiniBooNE low energy neutrino excess  Suite of low energy cross section measurements  Oscillation search 7 6 x POT

Gina Rameika, Fermilab - DOE Science &Technology Review July 12-14, 2010 MicroBooNE Detector Development Goals  Develop tools for analysis  Demonstrate photon – electron identification (reconstruction)  Refine sensitivity estimates for next generation detectors (analysis)  Demonstrate ability to run at shallow depth  Purity: Test of GAr purge in large, fully instrumented vessel  Implementation of cold electronics in Gaseous Argon (GAr)  Collect scaling data for larger detectors (construction costs, operations, etc.) 8

Gina Rameika, Fermilab - DOE Science &Technology Review July 12-14, 2010 Development Goals: Challenges  Argon purity – parts per trillion  High purity necessary for long drifts  Electronics  Signals are small, so sources of electronic noise must be strictly controlled  Wide range of pulse sizes and shapes  High sampling rate + many wires = large amount of raw data  Vacuum & cryogenics environments take special care  Every penetration into the cryostat must be leak-tight  Every penetration increases the heat load on the system  Safety issues  ODH hazards  Pressure vessel – (MicroBooNE is evacuable) 9

Gina Rameika, Fermilab - DOE Science &Technology Review July 12-14, 2010 Project Status  Experiment given Stage 1 approval in July 2008  Project timeline  CD-0 in September 2009  Initial Director’s Review in November 2009  DOE CD-1 Review in March 2010  ESAAB/CD-1 approval : July 9, 2010  Baseline Review, CD-2, by early 2011  Currently performing internal reviews, assessing costs and schedule  Construction  Installed and running in 2013 – transition to operations  Collaboration and Project closely linked  Collaborators hold management roles  Complete participation in the design  NSF-funded contributions to the detector 10

Gina Rameika, Fermilab - DOE Science &Technology Review July 12-14, 2010 Detector Overview  Single-walled insulated cylindrical vessel ~10 m long, ~3.5m diameter  Holds ~150 tons of liquid argon  ~70 ton fiducial volume, inside the TPC  2.6m drift (500 V/cm E-field =1.6 ms drift time 11  3 readout planes (+/-30 degrees, vertical)  ~8000 channels  pre-amplifiers, sitting in cold argon gas, above TPC; digitizing electronics located outside the vessel  ~30 PMTs for trigger  Cryogenic system for purification and recirculation

Gina Rameika, Fermilab - DOE Science &Technology Review July 12-14,

Gina Rameika, Fermilab - DOE Science &Technology Review July 12-14, 2010 Project Work Breakdown Structure 13 Reworking the WBS to incorporate more Project Management and Integration Tasks James, Rameika FNAL Kilmer FNAL Thorne BNL Fleming Yale Chen BNL Alber FNAL- FESS Voirin FNAL Conrad MIT

Gina Rameika, Fermilab - DOE Science &Technology Review July 12-14, 2010 Project Work Breakdown Structure 14 Reworking the WBS to incorporate more Project Management and Integration Tasks James, Rameika Kilmer Thorne Fleming Chen Alber VoirinConrad NSF Funded

Gina Rameika, Fermilab - DOE Science &Technology Review July 12-14, 2010 Current Work  Cryogenics and Vessel  System layout design  Purification filter tank assemblies  Pump assemblies  Integrated Vessel design  R&D at FNAL (PAB Lab) has produced a good understanding of how impurities get introduced and operating methods to filter them out 15

Gina Rameika, Fermilab - DOE Science &Technology Review July 12-14, 2010 Current Work  Wire Chamber  Detailed design of the wire planes  FEA analysis of mechanical structures  Development of wire winding machine 16

Gina Rameika, Fermilab - DOE Science &Technology Review July 12-14, 2010 Current Work  Electronics  Constructing prototype boards based on the conceptual design 17

Gina Rameika, Fermilab - DOE Science &Technology Review July 12-14, 2010 Current Work  Infrastructure and Installation  The assembly of the detector elements inside the vessel will be done at the D-Zero Assembly Bldg  Move the assembly into the MiniBooNE enclosure, after D&D and infrastructure updates 18

Gina Rameika, Fermilab - DOE Science &Technology Review July 12-14, 2010 Schedule Analysis – Work in Progress 19 ??? Complete installation

Gina Rameika, Fermilab - DOE Science &Technology Review July 12-14, 2010 Post-Project Planning – Transition to Operations  The Project is completed once the detector is installed and approved for operations  All operational clearances and safety approvals completed  Initial filling of the vessel is a test of the ability to perform a gas purge of a large vessel, fully instrumented, with no prior evacuation, and reach a purity level needed to operate within a “reasonable time”  The controlled cool-down and purge process may take 3-6 weeks  Developing estimates for annual operating costs  Dominated by maintenance of the cryogenic system  Both materials and labor costs 20

Gina Rameika, Fermilab - DOE Science &Technology Review July 12-14, 2010 Post-Project Planning – Data Analysis  LArSoft is a collaborative software development effort, involving members of the ArgoNeuT, MicroBooNE and LBNE collaborations, with Computing Division participation  Developing both simulation and reconstruction software packages  The ArgoNeut LArTPC collected NuMI neutrino beam interactions when it was operated underground in the MINOS ND Hall for a few months in  Have real data to develop reconstruction algorithms on  Several graduate students are on the front-lines 21

Gina Rameika, Fermilab - DOE Science &Technology Review July 12-14, 2010 Reconstruction Software Development cleaned up using Computer Vision Software Fuzzy event Displays 22 A field in computer science that seeks methods of extracting information from images and video  Algorithms developed for shape and feature detection, and face recognition  Open source algorithms

Gina Rameika, Fermilab - DOE Science &Technology Review July 12-14, 2010 Summary MicroBooNE combines detector development with physics Operating with physics goals in a neutrino beam provides an excellent assessment of the strengths and weaknesses of this detector technology Pursues development questions relevant to operation and analysis of massive LArTPC detectors 23 Running

Gina Rameika, Fermilab - DOE Science &Technology Review July 12-14, Backup Slides

Gina Rameika, Fermilab - DOE Science &Technology Review July 12-14,

Gina Rameika, Fermilab - DOE Science &Technology Review July 12-14,

Gina Rameika, Fermilab - DOE Science &Technology Review July 12-14,