Accelerator Design of CEPC PDR and APDR Scheme Dou Wang, Jie Gao, Feng Su, Yuan Zhang, Ming Xiao, Yiwei Wang, Bai Sha, Huiping Geng, Tianjian Bian, Na.

Slides:



Advertisements
Similar presentations
CEPC Machine Optimization and Final Focus Design Dou Wang, Jie Gao, Ming Xiao, Sha Bai, Yiwei Wang, Feng Su (IHEP) October 2013, CERN. Geneva, Switzerland.
Advertisements

Optics with Large Momentum Acceptance for Higgs Factory Yunhai Cai SLAC National Accelerator Laboratory Future Circular Collider Kick-off Meeting, February.
CEPC parameter choice and partial double ring design
Interaction region design for the partial double ring scheme
CEPC APDR Study Zhenchao LIU
Design study of CEPC Alternating Magnetic Field Booster
100km CEPC parameter and lattice design
The Studies of Dynamic Aperture on CEPC
CEPC parameter optimization and lattice design
The 13th Symposium on Accelerator Physics
Cavity-beam interaction and Longitudinal beam dynamics for CEPC DR&APDR 宫殿君
Issues in CEPC pretzel and partial double ring scheme design
CEPC pretzel scheme study
Pretzel scheme of CEPC H. Geng, G. Xu, Y. Zhang, Q. Qin, J. Gao, W. Chou, Y. Guo, N. Wang, Y. Peng, X. Cui, T. Yue, Z. Duan, Y. Wang, D. Wang, S. Bai,
Optimization of CEPC Dynamic Aperture
Lattice design for CEPC PDR
Status of CEPC lattice design
CEPC Booster Design Dou Wang, Chenghui Yu, Tianjian Bian, Xiaohao Cui, Chuang Zhang, Yudong Liu, Na Wang, Daheng Ji, Jiyuan Zhai, Wen Kang, Cai Meng, Jie.
Lattice design for CEPC PDR
CEPC Partial Double Ring Lattice Design and DA Study
CEPC-SppC Accelerator CDR Copmpletion at the end of 2017
CEPC APDR SRF and beam dynamics study
CEPC Partial Double Ring Lattice Design and DA Study
The design of interaction region
DA study for CEPC Main Ring
DA Study for the CEPC Partial Double Ring Scheme
CEPC APDR SRF considerations(3)
Some CEPC SRF considerations
CEPC partial double ring scheme and crab-waist parameters
CEPC Injector Damping Ring
CEPC parameter optimization and lattice design
Interaction region design for the partial double ring scheme
CEPC partial double ring scheme and crab-waist parameters
Comparison of the final focus design
CEPC main ring magnets’ error effect on DA and MDI issues
Lattice design for the CEPC collider ring
CEPC APDR and PDR scheme
CEPC partial double ring FFS design
CEPC advanced partial double ring scheme
CEPC partial double ring FFS design
Lattice design for the CEPC collider ring
CEPC parameter optimization and lattice design
Design study of CEPC Alternating Magnetic Field Booster
Design study of CEPC Alternating Magnetic Field Booster
CEPC DA optimization with downhill Simplex
CEPC Partial Double Ring Lattice Design and DA Study
Design study of CEPC Alternating Magnetic Field Booster
Update of DA Study for the CEPC Partial Double Ring Scheme
CEPC Partial Double Ring Lattice Design and DA Study
CEPC parameter optimization and lattice design
CEPC APDR SRF considerations(4) -LEP Cavity Voltage &BBU
CEPC parameter and DA optimization
Update of Lattice Design for CEPC Main Ring
CEPC Partial Double Ring Parameter Update
Update of Lattice Design for CEPC Main Ring
Lattice design for double ring scheme of CEPC main ring
Update of lattice design for CEPC main ring
CEPC APDR SRF and beam dynamics study
Update on CEPC pretzel scheme design
Lattice design and dynamic aperture optimization for CEPC main ring
Simulation check of main parameters (wd )
Lattice design for CEPC PDR
Lattice design for CEPC
CEPC APDR and PDR scheme
CEPC parameter optimization and lattice design
Sawtooth effect in CEPC PDR/APDR
CEPC SRF Parameters (100 km Main Ring)
Lattice design for CEPC PDR
CEPC Parameter /DA optimization with downhill Simplex
Sha Bai CEPC AP meeting Work summary Sha Bai CEPC AP meeting
Presentation transcript:

Accelerator Design of CEPC PDR and APDR Scheme Dou Wang, Jie Gao, Feng Su, Yuan Zhang, Ming Xiao, Yiwei Wang, Bai Sha, Huiping Geng, Tianjian Bian, Na Wang, Zhenchao Liu, Jiyuan Zhai, Xiaohao Cui, Yuanyuan Wei, Qing Qin 所创新项目 CEPC 预研中期进展报告会, June 21, 2016, IHEP

Difficulties of CEPC single ring scheme H Z Pre-CDRLow-HOM Number of IPs2 2 2 Energy (GeV) Circumference (km) 54 SR loss/turn (GeV) N e /bunch (10 11 ) Bunch number Beam current (mA) SR power /beam (MW) Bending radius (km) 6.1 Momentum compaction (10 -5 ) 3.4  IP x/y (m) 0.8/ / / Emittance x/y (nm) 6.12/ / /0.018 Transverse  IP (um) 69.97/ / /0.15  x /IP  y /IP V RF (GV) f RF (MHz) 650 Nature  z (mm) Total  z (mm) HOM power/cavity (kw) Energy spread (%) Energy acceptance (%) Energy acceptance by RF (%) nn Life time due to beamstrahlung_cal (minute) F (hour glass) L max /IP (10 34 cm -2 s -1 )

Machine constraints / given parameters Energy E 0 Circumference C 0 N IP Beam power P 0  y * Emittance coupling factor   Bending radius  Piwinski angle   y enhancement by crab waist F l ~1.5 (2.6) Energy acceptance (DA) Phase advance per cell (FODO) 3

Constraints for parameter choice  Limit of Beam-beam tune shift  Beam lifetime due to beamstrahlung  Beamstrahlung energy spread  HOM power per cavity F l :  y enhancement by crab waist *J. Gao, emittance growth and beam lifetime limitations due to beam-beam effects in e+e- storage rings, Nucl. Instr. and methods A533 ( 2004 ) p BS life time: 30 min A=  0 /  BS (A  3) V.I. Telnov 4

parameter for CEPC partial double ring ( wangdou ) Pre-CDRH-high lumi.H-low powerWZ Number of IPs22222 Energy (GeV) Circumference (km) 54 SR loss/turn (GeV) Half crossing angle (mrad) 0 15 Piwinski angle /7.6 N e /bunch (10 11 ) Bunch number Beam current (mA) SR power /beam (MW) Bending radius (km) Momentum compaction (10 -5 )  IP x/y (m) 0.8/ / / /0.001 Emittance x/y (nm) 6.12/ / / / / Transverse  IP (um) 69.97/ / / / /0.053  x /IP /0.006  y /IP /0.073 V RF (GV) f RF (MHz) 650 Nature  z (mm) Total  z (mm) HOM power/cavity (kw) Energy spread (%) Energy acceptance (%) 222 Energy acceptance by RF (%) nn /0.24 Life time due to beamstrahlung_cal (minute) F (hour glass) L max /IP (10 34 cm -2 s -1 ) /3.09 5

Beam-beam simulation Case: H-low power Case Z IBB: Strong-Strong Beam-Beam Code with Beamstrahlung effect Developed by Y. Case: Pre-CDR Case: H-high lum

CEPC Higgs luminosity vs. crossing angle

CEPC Higgs Luminosity vs beam power 8

CEPC PDR Luminosity vs circumference * Fabiola Gianotti, Future Circular ColliderDesign Study, ICFA meeting, J-PARC,

100km CEPC PDR vs Fcc-ee P HOM,CEPC =11.3 kw The large difference of Z is due to the constraint for RF HOM power. * Fabiola Gianotti, Future Circular ColliderDesign Study, ICFA meeting, J-PARC,

bypass (pp) Advantage: Avoid pretzel orbit Accommodate more bunches at Z/W energy Increase luminosity and reduce beam power with crab waist collision Advantage: Avoid pretzel orbit Accommodate more bunches at Z/W energy Increase luminosity and reduce beam power with crab waist collision 11

ARC lattice FODO cell Dispersion Suppressor Sextupole configuration

CEPC Partial Double Ring Lattice 13

Crab sextupole Critical energy: Ec=190 keV Dipole strength: B=0.019 T Critical energy: Ec=190 keV Dipole strength: B=0.019 T Partial double ring FFS design with crab sextupoles Betax=0.25m Betay= m K2hs=26.8 m -3 K2vs=32.2 m -3 IP  The second FFS sextupoles of the CCS-Y section work as the crab sextupoles. 14

Combine with partial double ring lattice 30 mrad 10 m 15

CEPC IR sextupole strength Ec=190keV Ec=100keV

DA of the whole ring (arc+PDR+bypass+FFS) Arc sextupole: 2 groups DA (on-momentum): 27  x  57  y DA (  0.5%): 2  x  2  y Crab sextupoles - off 17

Magnet field error on DA in CEPC PDR With bend B*L error (whole ring including FFS) μx= 0 μy= 0 Orbit in X With bend B*L error (whole ring including FFS) Orbit in Y With bend B*L error (whole ring including FFS) With bending magnet field errors, horizontal orbit has changed a lot, but vertical has no change Tune has changed to be an integer resonance, beam is not stable. Orbit correction is needed in horizontal Tracking in 240 turns, coupling factor κ=0.003 for ε y Could be cured by adjusting the current during commissioning  Main effect coming from the bending magnet no error

Multipole errors effect on DA in CEPC PDR Multipole errors of all magnets Multipole errors of bend Multipole errors of quadurpoles Multipole errors of sextupoles Multipole errors reduce DA a little bit, but not much. It seems to have not much effect on DA, especially of off-momentum DA. Orbit has no change due to multipole errors.

CEPC Advanced Partial Double Ring Layout I SU Feng IP1_ee IP3_ee IP2_pp IP4_pp 3Km RF 1/2RF RF 1/2RF IP1_ee/IP3_ee, 2.968Km IP2_pp/IP4_pp, m APDR, m 4 Short Straights, 141.6m 4 Medium Straights, 566.4m 4 Long Straights, m 4 ARC1, 124*FODO, m 4 ARC2, 24*FODO, m 4 ARC3, 79*FODO, m 2 ARC4, 24*FODO, m C= m 1/2RF Bypass about 42m ARC1 ARC3 ARC2 ARC3 ARC2 ARC4 ARC1 APDR

ARC CEPC Advanced Partial Double Ring Layout II SU Feng IP1_ee IP3_ee 3Km 1/2RF IP1_ee/IP3_ee, 2.968Km IP2_pp/IP4_pp, m APDR, m 4 Short Straights, 94.4m 12 Long Straights, 566.4m 4 Long ARC, 124*FODO, m 4 Medium ARC, 104*FODO, m 4 Short ARC, 14*FODO, 660.8m C= m 1/2RF APDR

CEPC Advanced Partial Double Ring Optics PDR1 APDR Bypass APDR PDR3 Bypass APDR

CEPC APDR SRF considerations The 8-double ring and 6-double ring seem available when using the same parameter as PDR(V RF =3.62GV) for HL. The 8-double ring has a lower phase variation than the 6- double ring. The phase region is from degree for bunches in a bunch train for the 8-double ring HL mode. The phase region is from degree for the 6-double ring HL mode. The bunch energy gain in each cavity is constant. The RF to beam efficiency is ~100%. The 8-double ring and 6-double ring seem available when using the same parameter as PDR(V RF =3.62GV) for HL. The 8-double ring has a lower phase variation than the 6- double ring. The phase region is from degree for bunches in a bunch train for the 8-double ring HL mode. The phase region is from degree for the 6-double ring HL mode. The bunch energy gain in each cavity is constant. The RF to beam efficiency is ~100%.

8 double ring APDR(HL V RF =3.62) APDR (H-low power V RF =3.53) APDR (Z) Number of IPs222 Energy (GeV) Circumference (km) 54 SR loss/turn (GeV) Half crossing angle (mrad) 15 Piwinski angle N e /bunch (10 11 ) Bunch number 17x411x4275x4 Beam current (mA) SR power /beam (MW) Bending radius (km) V RF (GV) /0.12/0.12 f RF (MHz) 650 Cavity No /768/19248/16/16 Cavity gradient /20/2016.2/16.3/32.6 Accelerating phase / / / / CW power/cavity ( kW ) /81.6/ /350/350 Peak power/train (kW) Total Power ( MW ) Cell/cavity 22/1/42/2/1 Cavity/module 66/12/36/2/2 Module/station 88/8/81/1/1 Total module 6464/64/648/8/8 R/Q ( Ω) /103/412206/206/103 G 268 HOM loss factor/cavity (V/pC) /0.27/ /0.54/0.27 HOM power/cavity (kW) /0.24/ /0.36/0.18 Working Temperature ( K ) 222 Q0 2E10 τ ( ms ) /0.76/0.76 QL 1.656e62.53e64.58e6/1.55e6/1.55e6 Bandwidth(kHz) /0.209/0.209 Detuning F (kHz) /-0.347/ Stored energy/cavity(J) /65.3/133 Frev(kHz) Gap length TB (us) 20 η(RF to beam efficiency)(%) ~100 Vc decrease(%) /5.3/2.5 TB/τ /0.0263/ DR Z mode 8 DR H-Low power mode

CEPC full double ring scheme is also under look… (In Feng Su’s talk)

MDI layout and issues : single  partial double ring Beam background Shielding design Collimator design SC magnet design Beam pipe Solenoid compensation Lumical & fast lumi measurement & feedback …….. Partial double ring MDI Single ring MDI (In Sha Bai’s talk)

CEPC booster design  Wiggling Bend Scheme  Normal Bend Scheme Both design fulfil the requirement toward CDR  For injection, emit of should be about 3.5E-9 m*rad.  1 percent energy acceptance for enough quantum lifetime.  DA_x and DA_y should bigger than 5~6 sigma for injection. Both design fulfil the requirement toward CDR  For injection, emit of should be about 3.5E-9 m*rad.  1 percent energy acceptance for enough quantum lifetime.  DA_x and DA_y should bigger than 5~6 sigma for injection.

CEPC Injector 0.21 mm-mrad 左边为电子枪 + 聚束系统 + 加速段( 200 MeV ) 右上为电子打靶,能量沉积 右下为正电子收集及加速系统结果

International collaboration 1 )王毅伟 2015 年 10 月 4 日 -11 月 2 日 ( KEK Super-KEK B, Japan) 2 )边天剑 2016 年 1 月 23 日 ~2016 年 4 月 22 日 (SLAC, USA)) 3 )苏峰 2016 年 3 月 15 日 -4 月 15 日 (BNL, USA) 4 )白莎 2016 年 3 月 15 日 -4 月 15 日 (LAL, France) 5 )赵同宪 2016 年 2 月 22 日 年 4 月 30 日 (KEK, Japan)

summary A consistent calculation method for CEPC parameter choice with carb waist scheme has been created. Larger ring has the potential to reach higher luminosity. Based on partial double ring scheme, we can get higher luminosity (  50% ) keeping Pre-CDR beam power or to reduce the beam power (30 MW) keeping same luminosity. FFS with crab sextupoles and lower emittance arc has been designed. On-momentum DA of whole ring is good enough and the optimization of DA bandwidth is ongoing. Advanced partial double ring scheme has been proposed in order to improve the RF efficiency. 100% efficiency can be achieved. CEPC full double ring scheme is also under look…