QMWG June 2012 Generation Resource Energy and Regulation Deployment Summary.

Slides:



Advertisements
Similar presentations
IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
Advertisements

Proposal on Ancillary Service Deliverability Requirements QMWG January 6, 2012.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
SBBH Flag Implementation QMWG October 11, SBBH Flag - Background SBBH Flag - Background: –The SBBH acronym stands for “SCED Base Point Below HDL”
March 30, 2015 SCED Event Follow up: Proposed Improvements QMWG, May 08, 2015.
QSE Managers Working Group July 11, 2011 Base Point Deviation – NPRR377 ERCOT Settlement & Billing Group.
1 Cutover Daily Call 4:30 PM November 23, :30.
December 2, 2011 QMWG Summary of Potential Issues with NPRR385 Price Floor ERCOT.
Proposed Revision to the Shadow Price Cap and Power Balance Penalties in SCED Same Transmission Element.
July QMWG Update (WMS). GREDP Discussion GREDP is currently used as a compliance tool ERCOT is considering now just using it as an investigative tool.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
NPRR385, Security Violation Analysis and Reporting and Negative Price Floor WMS Meeting February 15, 2012.
1 Periodic Revision Request Implementation Review – Q January 17, 2013.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
NPRR 097 DSR and Small Capacity / Low Operating Level Issues for Compliance Monitoring.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
QMWG 10/7/13 Generation Resource Energy and Regulation Deployment Performance.
AWS MW Availability Scheduler Screen shots for the WGR MW Availability Demo produced by AWS as presented at the 7/7/09 QMWG meeting.
September 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
PDCWG Report to ROS David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy.
CMWG Update to WMS Report of CMWG Meetings of &
1 Market Trials Real-Time Market / LFC Weekly Update July 30, 2010.
QMWG Update to WMS S. Looney October 9, WMS Assignments NPRR564, Thirty-Minute Emergency Response Service – Discuss concerns expressed at last WMS.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
QSE Managers Working Group November 7 th 2011 NPRR 334 – Additional Analysis.
PRR525 SCE Method Comparison ERCOT Compliance December 3, 2004.
QMWG February 7, 2011 January 2011 GREDP Performance Summary.
Consider the function: Now, interchange the x- and y- coordinates in the set of ordered pairs above. This new set of ordered pairs is called the inverse.
1 Cutover Daily Call 10:30 AM November 23, :30.
© ERCOT and 2004 Fleet Deployment and Settlements WMS Meeting August 19, 2004 Ino Gonzalez ERCOT Settlements
WMS 1/9/20131 Priority Power Management, LLC Proposed Changes to Holistic Solution WMS January 9, 2013 James Z. Brazell Law Office of James Z. Brazell.
QSE Managers Working Group Meeting Notes 9 June, 2009 Report to WMS 17 June, 2009 David Detelich - Chairperson.
Analysis for the Determination of X, Y, and Z for Compliance Monitoring NATF.
RDTF June 1, Purpose “The effect of the Shadow Price cap for the Power Balance Constraint is to limit the cost calculated by the SCED optimization.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
1 Project Update and Summary of Project Priority List (PPL) Activity to Date June 11, 2014.
Project Funding Review February 7, Background ERCOT has a $15M project budget in 2013 (same as 2012) –To allow for new additions to the.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Proposal for Consideration Regarding Holistic Solution to Congestion Irresolvable in SCED Issue:How do you identify when constraint is irresolvable Proposal:Adopt.
Multi-Interval Real-Time Market (MIRTM) Updates SAWG Sean Chang Market Analysis February 22, 2016 ERCOT Public Version
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
GREDP Monitoring QSE Manager’s Working Group December 15, 2010.
QSE Managers Working Group October 12, 2010 Base Point Deviation Issues – Short Term and Long Term Solutions Nodal Settlement & Billing Group.
NPRR784 Mitigated Offer Caps for RMR Units Protocol Revision Subcommittee June 16,
Market Trials Update NATF March 2,
Generation Resource Energy and Regulation Deployment Performance Report for June 2017 QMWG 07/10/2017.
Non-IRR GREDP < 85% August 2017
Commercial Operations Subcommittee (COPS) Update to RMS 11/1/2016
Compliance Report to ERCOT BOD December 2006
NPRR833 Workshop: Contingency Processing in CRR, DAM and SCED
Current FRRS Language & Explanation of Posted Data
Real-Time Co-optimization of Energy & Ancillary Services
Texas Nodal EMS Forced Outage Detection Business Requirements Document Carlos Gonzalez-Perez – August 21st,
Market Notice Regarding Off-line Units
2006 NSRS Deployments* * Note: Post PRR650 Implementation (07/01/2006)
Role of Account Management at ERCOT
QSE Managers Working Group July 11, 2011 Base Point Deviation – NPRR377 ERCOT Settlement & Billing Group 1.
David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy
May 2012 Generation Resource Energy and Regulation Deployment Performance QMWG 6/8/2012.
Project Update and Summary of Project Priority List (PPL) Activity to Date July 17, 2014.
Review of Abnormal MCPEs
Missed Postings July 2016 through August 22, 2016: Summary
Compliance Report to ERCOT TAC February 2007
Market Trials Open Market Participant Call
WIND TURBINE GENERATORS.
Renewable subsidies: destroyers of low cost electricity supplies
Name _________________________ Date _______________
The Normal Distribution
Name _________________________ Date _______________
Presentation transcript:

QMWG June 2012 Generation Resource Energy and Regulation Deployment Summary

2 Non-IRR GREDP – Energy Deployments June GREDP Score below 85%: QSE NameResource NameFuel TypeTotal Intervals PassedTotal Intervals ScoredStd Dev (GREDP MW)GREDP Monthly Score SCLE SCLE SCLE SCLE

3 IRR GREDP Summary Total IRR GREDP Performance AprilMayJuneAprilMayJune Intervals Passed20,72717,72810,18669,15539,66542,325 Intervals Scored22,73419,28611,41974,79343,45546,373 GREDP Monthly Score91%92%89%92%91% Std Dev (ATG - Exp MW)5.43 MW6.61 MW8.13 MW8.23 MW8.41 MW9.22 MW

4 June IRR Failures QSE NameResource NameFuel TypeTotal Intervals PassedTotal Intervals ScoredStd Dev (ATG-Exp MW)GREDP Monthly Score WIND1,2671, WIND WIND WIND WIND WIND WIND WIND WIND WIND WIND WIND WIND WIND WIND WIND WIND IntervalsGREDP Failures Scored ≤ > Scored ≤ > Scored ≤ > Scored1

Manual HDL/LDL Override Summary QMWG

6 Daily Summary Graph For this analysis, we captured unique HDL/LDL overrides –An override is considered unique if that same Resource did not have an override within the last 10 minutes There were 14 total unique overrides in June – As compared to 8 in May and 1 in April

7 Daily Summary Table Date Total Number of Overrides Number of Resources with an Override Number of Unique HDL/LDL Overrides Jun 1, Jun 2, Jun 3, Jun 4, Jun 5, Jun 6, Jun 7, Jun 8, Jun 9, Jun 10, Jun 11, Jun 12, Jun 13, Jun 14, Jun 15, Jun 16, Jun 17, Jun 18, Jun 19, Jun 20, Jun 21, Jun 22, Jun 23, Jun 24, Jun 25, Jun 26, Jun 27, Jun 28, Jun 29, Jun 30,

8 Reasons for Manual HDL/LDL Overrides Outages required overrides as a result of local voltage issues The following constraint had SCED executions counted towards irresolvability: XBA3T89 : 2585_1 This constraint has not met the criteria for resetting the shadow price cap