Time Meeting 2/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.

Slides:



Advertisements
Similar presentations
Muon g-2 and SLAC Detector Test T-519 Momentu m Spin e David Hertzog University of Washington.
Advertisements

Status of DHCAL Slice Test Data Analysis Lei Xia ANL-HEP All results preliminary.
Report ~first collision Kotaro Kijima 2010/01/25 Local lab meeting.
PHENIX local RUN9 RHIC meeting Manabu Togawa for the PHENIX 1.
MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April GeV pp (2+3 weeks) GeV pp (1+6 weeks)?
13/02/20071 Event selection methods & First look at new PCB test Manqi Ruan Support & Discussing: Roman Advisor: Z. ZHANG (LAL) & Y. GAO (Tsinghua))
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
Time Meeting 1/20/2015 PHENIX Run-15 Preparations Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Silicon Stripixel Detector Junji Tojo RIKEN Vertex2005 Lake Chuzenji, Nikko, Japan November 7-11, 2005.
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
Time Meeting 1/13/2015 PHENIX Run-15 Preparations Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Ladder QA manual. Check items 1 Interlock - Temperature of NOVEC. ✓ Check the difference from the value where the QA in RIKEN was performed is less than.
Jin Huang Los Alamos National Lab for the FVTX Group.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Simulation issue Y. Akiba. Main goals stated in LOI Measurement of charm and beauty using DCA in barrel –c  e + X –D  K , K , etc –b  e + X –B 
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
Time Meeting 2/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
FVTX Electronics (WBS 1.5.2, 1.5.3) Sergey Butsyk University of New Mexico Sergey Butsyk DOE FVTX review
PHENIX Run-13 status Hubert van Hecke 1Hubert van Hecke - 05 Feb 13 Time meeting.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Feb 13.
Run15 pp Achievement and pAu status Itaru Nakagawa RIKEN/RBRC.
Swadhin Taneja Stony Brook University On behalf of Vertex detector team at PHENIX Collaboration 112/2/2015S. Taneja -- DNP Conference, Santa Fe Nov 1-6.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
Time Meeting 3/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Solid State Detectors for Upgraded PHENIX Detector at RHIC.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
NIKHEF –D0 meeting, June 6, 2001 Freya Blekman, NIKHEF Amsterdam SMT pedestal management Weekly NIKHEF – NIJMEGEN – D0 meeting June 6, 2001 Freya Blekman.
FVTX Electronics (WBS 1.5.2, 1.5.3) Sergey Butsyk University of New Mexico Sergey Butsyk DOE FVTX review
PM Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
FNAL All Experimenters Meeting June 24, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Operations June 17 – 24, 2002  Notable “features”
Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
Columbia University IN THE CITY OF NEW YORK VTX Electronics Integration E.J. Mannel Columbia University DOE Review June 2-3, 2009.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
PHENIX Plan for Run13 Kieran Boyle RSC 01/11/20131.
Stability Hidemitsu Asano. pixel unstable point seg#
CALICE Collaboration Meeting Sept Roman Pöschl LAL Orsay - Data Collected with the Ecal - Ecal in July running - Collected Data and Glimpse on Quality.
FVTX High Multiplicity Trigger for Run15
RIKEN/RBRC Itaru Nakagawa
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
Pixel Status Mar 12nd 2012 Maki KUROSAWA RBRC.
Noise analysis of the 1m3 DHCal test beam
Radiation Laboratory Meeting
Maki KUROSAWA VTX Group 2014 Feb 20
ScECAL+AHCAL+TCMT Combined Beam FNAL
Run16 Y. Akiba.
Silicon tracker and sensor R&D for sPHENIX
Current status of run14 VTX alignment
Commissioning of the ALICE-PHOS trigger
E. Garutti - Main Meeting
VTX readiness for RUN15 Y. Akiba.
The CMS Tracking Readout and Front End Driver Testing
Current status Minjung Kim
Presentation transcript:

Time Meeting 2/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico

Time Meeting 2/10/2015 Collisions Timed in the BBC Took data from all (but one) subsystems. 12/10/2014Douglas Fields 2

Time Meeting 2/10/ /10/2014 Douglas Fields 3 BBCZ-VTXZ Beam Spot by VTX

Time Meeting 2/10/2015 ZDC Issues MCR (Angelika) reported that the ZDC rates were a factor ~2 lower than previous 200GeV p+p runs. Gain was too low, have raised by x1.5. Also saw ZDC rates fluctuate – not understood. 12/10/2014Douglas Fields 4 ZDC S singles

Time Meeting 2/10/2015 All fibers have sync, but NW5 because of a broken transceiver (top figure). Only 1 / 768 columns does not latch (top figure). No bias problems at this moment. Overall 95% hit efficiency according to the last calibration (bottom figure). Have ~7 wedges which do not properly receive a calibration signal but still perform fine for real data taking. FVTX Status

Time Meeting 2/10/2015 FVTX from last night’s data Working on understanding remaining issues, but relatively minor.

Time Meeting 2/10/2015 Chip Map of WEST (Commissioning in Run /1/16) Pulse Test (sent pulse to col10 and 20) 7 Col#0 is always hot for two chips. Cannot mask. New Problem – B1-L6 has lost communication, no data from this ladder Good chip -> 50% Dead VTX Pixel Status

Time Meeting 2/10/ VTX Pixel from last night’s data Number of hits per event mostly what we expect. The new missing ladder.

Time Meeting 2/10/ VTX Stripixel from last night’s data Number of hits per event mostly what we expect.

Time Meeting 2/10/2015 MPC-EX Both North & South are setup for PHENIX All Layers are being read out by DCMs – Still in standalone mode while firmware is being tested – Entire readout chain tested GTM->FEM->Detector->FEM->DCM Working on multi-event buffering: critical to high-rate, low dead time PHENIX DAQ – Some issues, but a lot of progress over the past few weeks Fake data from the Carrier Board -Tests the connection to the FEM Have (today) read some real data from SVX4s!

Time Meeting 2/10/2015 Detector performance Temperature & leakage current monitoring – Leakage current increases with temperature Cosmic MIP studies are ongoing at SBU – Calibration possibilities

Time Meeting 2/10/2015 Summary BBC is timed in. All existing detectors behaving as usual. MPC-EX is beginning to read real data into PHENIX DAQ. One new ladder in VTXP not reading out. ZDC issue to be resolved. 12/10/2014Douglas Fields 12