0 Ion Beam Facilities at KOMAC 2014. 11. 13. Chan Young Lee on behalf of KOMAC 2014. 11. 13. Chan Young Lee on behalf of KOMAC ICABU2014, November 12~14,

Slides:



Advertisements
Similar presentations
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
Advertisements

R Scrivens, CERN, ABI Workshop, 12/2008 The Feschenko Bunch Shape Monitor User experience at CERN Developed by INR, Troitsk. High resolution bunch shape.
RaDIATE 1 st Annual Collaboration Meeting May Cost-effective Irradiations Discussion Radiation Damage In Accelerator Target Environments.
Study of sputtering on thin films due to ionic implantations F. C. Ceoni, M. A. Rizzutto, M. H. Tabacniks, N. Added, M. A. P. Carmignotto, C.C.P. Nunes,
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
LCWS2002G/H Joint Session Fabrication of a Silicon Pixel/Pad for dE/dx Measurement H. Park (Kyungpook National U.) I.H. Park (Ewha Womans U.)
Design of electrostatic septum for slow extraction from J-PARC main ring 2005, March 2nd ICFA septa workshop 2005 Acc. Lab., KEK M. Tomizawa, Y. Arakaki,
Visits to Chinese accelerator companies Peter Pearce (April 2004) Two companies were visited. Beijing Medical Equipment Institute at Chongping and Beijing.
Activities of Superconducting RF Accelerators at Nanjing University Sun An Proton Linear Accelerator Institute Institute of Energy Sciences, Nanjing University.
TTF-II Status & Prospectives Nick Walker DESY 5 th ITRP Meeting – CALTECH.
Title of the slide Operation and commissioning of IFMIF LIPAc Injector and J-M Ayala A), B. Bolzon B), P. Cara C), N. Chauvin B), D. Chel B), D. Gex C),
Heavy Ion Accelerators for RIKEN RI Beam Factory and Upgrade Plans H. Okuno, et. al. (RIKEN Nishina Center) and P. Ostroumov (ANL) Upgrade Injector Low.
Experimental part: Measurement the energy deposition profile for U ions with energies E=100 MeV/u - 1 GeV/u in iron and copper. Measurement the residual.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
Accelerator Physics in Finland RECFA A. Virtanen.
K. Matsuoka (Kyoto Univ.) for T2K muon monitor group
Radioactive Ion Beams CW 0.5 MW (for protons) 1 GeV (for protons) p to U Chiara, Manuel, Adam, HuiMay 2011, CAS, Bilbao.
0 Plenty Energy Clean Environment Healthy Life Commissioning and Initial Operation of the KOMAC 100-MeV Proton Linac KOMAC / KAERI Kyung-Tae Seol
1 mm 1.5 mm 2 mm 0.5 mm 1.5 mm ABSTRACT Within the framework of fusion technology research and development, a neutron source has long been considered a.
Effect of Re Alloying in W on Surface Morphology Changes After He + Bombardment at High Temperatures R.F. Radel, G.L. Kulcinski, J. F. Santarius, G. A.
Paul Scherrer Institut
Polarized source upgrade RSC, January 11, OPPIS LINAC Booster AGS RHIC ( ) ∙10 11 p/bunch 0.6mA x 300us→11∙10 11 polarized H - /pulse. ( )
Karolina Danuta Pągowska
T. Fleck, GSI, Darmstadt, Germany ICALEPCS Status of the Control System for HICAT at an advanced stage of Commissioning Functions, Restrictions.
Studies on 2.45 GHz microwave ion sources Abhishek Nag IISER, KOLKATA Presented By: G.O. Rodrigues IUAC, New Delhi Supervised By:
Recent progress of RIKEN 28GHz SC-ECRIS for RIBF T. Nakagawa (RIKEN) 1.Introduction RIKEN Radio isotope factory project 2.RIKEN 28GHz SC-ECRIS Structure(Sc-coils,
1 Plenty Energy Clean Environment Healthy Life ICABU 2013 Invited Talk Industrial Applications in KOMAC by Accelerator Technology Jae-Sang.
LOGO Status and activities of the Korea Proton Accelerator Users Association *Korea Proton Accelerator Users Association S. J. Noh Department of Applied.
Seungyu Rah (Pohang Accelerator Laboratory, POSTECH, Korea) Nov
Overview of Tandem Accelerator Facility and related R&D Work at NCP Ishaq Ahmad
Improved performance of Variable Energy Cyclotron(VEC) Variable Energy Cyclotron Centre Kolkata P S Chakraborty, B Ch Mandal, S K Thakur, M Das, S Som,
Paul Scherrer Institut 5232 Villigen PSI EURISOL/BENE_2007, PSI /GF34 Joint High Power Target Meeting EURISOL/BENE , CERN Direct target irradiation.
Ion Accelerator Activities at VECC
PXIE Ion Source & LEBT Commissioning Update Lionel Prost on behalf of A. Shemyakin, R. Andrews, B. Brooker, K. Carlson, J. Czajkowski, R. D’Arcy, B. Hanna,
Outline Introduction : KOMAC & RI production plan Beam line design
Report Technical Director Storage-Ring-Installation Completed
DC Sputtering Disadvantage #1 Low secondary electron yield
S. A. Rastigeev , A. R Frolov, A. D. Goncharov, V. F. Klyuev, E. S
NICA injection complex status
Dielectric Wakefield R&D programme at Daresbury Lab.
The BLAIRR Irradiation Facility Hybrid Spallation Target Optimization
A. Martynov on behalf of accelerator division.
HIAF Electron Cooling System &
MeV Ion Microbeams and Radiation Biology at the University of Surrey
Status of the CERN chopper.
How to run ions in the future?
The Frascati Neutron Generator
Design of a PET-isotope-based hadron therapy facility
EffiCAS Efficient Facility for Ions at CAS
Corial 200R 11/17/2018 Simplicity, performance, and upgradability in a system designed for R&D environments RIE capabilities over a variety of materials.
Bubble Chamber Planning Meeting
Easy-to-use Reactive Ion Etching equipment
The Cornell High Brightness Injector
Machine Operation and Progresses in SSRF
Anisotropic RIE etching supported by a wide range of processes
ADS Accelerator Program in China
Magnetized Electron Beam for Ion Cooling at JLEIC
Simple-to-use, manually-loaded batch RIE system
Easy-to-use Reactive Ion Etching equipment
Bubble Chamber – Beam Requirements
Simple-to-use, manually-loaded batch RIE system
Advanced Research Electron Accelerator Laboratory
Considerations on Beam Diagnostics Physics
A. Freyberg Aug 2016 ECT’16 =>
November 7, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
Explanation of the Basic Principles and Goals
Physics Design on Injector I
The Nanosecond bunching system at KIGAM Tandem Accelerator
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
A DLC μRWELL with 2-D Readout
Presentation transcript:

0 Ion Beam Facilities at KOMAC Chan Young Lee on behalf of KOMAC Chan Young Lee on behalf of KOMAC ICABU2014, November 12~14, 2014, DaeJeon, KOREA

1 Contents I.Ion Beam Facilities at KOMAC II.Upgrade of Ion Beam Facilities III.Future Plan IV.Summary I.Ion Beam Facilities at KOMAC II.Upgrade of Ion Beam Facilities III.Future Plan IV.Summary

2 I.Ion Beam Facilities at KOMAC

3 Metal Ion BeamGaseous Ion BeamDual Ion Beam Metal Ion Beam Gaseous Ion Beam Dual Ion Beam Development stage Daejeon User promotion stage branch Practical application stage Metal Ion BeamGaseous Ion BeamHigh Current Ion Beam Beam service opening Improvement of operation stability Increase of beam energy Metal ion beam service Beam service opening Improvement of operation stability Increase of beam energy Metal ion beam service Beam service & R&D activity Various metal ion beam Ion beam etching Radiation license Beam service & R&D activity Various metal ion beam Ion beam etching Radiation license History of Ion Beam facilities

4 High Current Ion Beam Facility (2003)  Beam Energy : ~22keV/~60mA  Available Ions : N, Ar, Xe etc.  Irradiation Area : 10cm x 5cm High Current Ion Beam Facility (2003)  Beam Energy : ~22keV/~60mA  Available Ions : N, Ar, Xe etc.  Irradiation Area : 10cm x 5cm Metal Ion Beam Facility (1995)  Beam Energy : 20~100keV/~2mA  Available Ions : Cu +, Cr +, Fe +, Co +  Irradiation Area : 10cm x 10cm Metal Ion Beam Facility (1995)  Beam Energy : 20~100keV/~2mA  Available Ions : Cu +, Cr +, Fe +, Co +  Irradiation Area : 10cm x 10cm Gaseous Ion Beam Facility (1989)  Beam Energy : 20~120keV/~5mA  Available Ions : H, D, He, N, Ar, Xe, Kr etc.  Irradiation Area : 10cm x 10cm Gaseous Ion Beam Facility (1989)  Beam Energy : 20~120keV/~5mA  Available Ions : H, D, He, N, Ar, Xe, Kr etc.  Irradiation Area : 10cm x 10cm Current Status of Ion Beam Service [User statistics] [Beam services] Industry (47.3%) University (23.4%) Institute (29.2%)

5 User demands ◎ Higher energy for deep implantation. ◎ Large irradiation area with high uniformity for large size samples. ◎ Dose control with high reliability. More ion species Higher quality ion beam

6 II.Upgrade of Ion Beam Facilities

7 Gaseous Ion Beam Facility Upgrade contents  Beam Energy Increase : 120keV → 200keV  Beam current measuring system : BPM, F/C, Slit  Installation X-Y scanner & MQD for Beam uniformity : > 90%  Replacing deteriorated P/S  Improvement of Vacuum System  Labview-based remote control system Ion Source BPM Beam Stopper Slit Accel. Tube MQD Scanner F/C Chamber BPM Beam Stopper Specification  Beam Energy : 200keV / 5mA  Gaseous Ion : H, He, N, Ar, Xe etc.  Irradiation Area : 100mm x 100mm  Uniformity : > 90%

8 Metal Ion Beam Facility Scanner Chamber BPM Scanner MQD Accel. Tube Slit Ion Source Analyzing Magnet Beam Stopper F/C Upgrade contents  Beam Energy Increase : 120keV → 150keV  PID control system for metal compound temperature control  Beam current measuring system : BPM, F/C, Slit  Installation X-Y scanner & MQD for Beam uniformity (±5%)  Replacing deteriorated P/S  Labview-based remote control system Specification  Beam Energy : 150keV / 1mA  Metal Ion : Cr +, Fe +, Co +, Cu + (Al +, Ti +, P +, Ag + etc.)  Irradiation Area : 100mm x 100mm  Uniformity : >90%

9 Vertical Ion Beam Facility Ion Source Beam Stopper BPMF/C X-Y stage Constant Velocity distance280mm×280mm Accel. & decel distance70mm Uniformity area280mm *280mm Resolution ±50 ㎛ Accuracy ±20 ㎛ Upgrade contents  60keV Ion Source  Beam current measuring system : BPM & F/C  X-Y stage for large area & Uniform area  Upgrade of P/S  Labview-based remote control system Specification  Beam Energy : 60keV / 20mA  Gaseous Ion : H, He, N, Ar, Xe etc.  Irradiation Area : 250mm x 250mm  Uniformity : >90%

10 Upgrade contents  Bucket-type Ion Source : 22keV/150mA  Additional Duo-PIGatron (30keV, 20mA) for Hybrid IBSD processing  Labview-based remote control system High Current IBSD Facility * IBSD : Ion Beam Sputter Deposition Specification  Beam Energy : 22keV/150mA + 30keV/20mA  Gaseous Ion : N, Ar, Xe  Irradiation Area : 150mm x 150mm  Target material : STS, Cr, etc. Ion Source 1F/CIon Source 2IBSD Target System

11 1-MV Electrostatic ion accelerator ELV type HVPS  Purpose General purpose irradiation  Specifications p, d, He, N, … Current > 1mA Voltage <1MV  Plan To be commissioned in the middle of m RF Ion source Accelerating Tube Irradiation Chamber air test stand for RF ion source & acc. tube Ref) poster session AP-72

12 He RFQ Microwave ion source (He, d) Electrostatic LEBT 200MHz RFQ 4 vane, 3.2m Multipurpose irradiation chamber Beam transport system  Purpose He or d beam for semiconductor Fusion material test  Specifications A/q : 2 (He, d) 1MeV/u 200MHz RFQ  Plan To be commissioned in the middle of 2016 Ref) poster session AP-73

13 -1MV : 200kV~1MV -4MeV : >1MeV -1MV : 200kV~1MV -4MeV : >1MeV -High Current IBSD : 10~20keV -Gaseous Ion Beam : 20~200keV -Metal Ion Beam : 20~150keV -Vertical Ion Beam : 10~60keV -High Current IBSD : 10~20keV -Gaseous Ion Beam : 20~200keV -Metal Ion Beam : 20~150keV -Vertical Ion Beam : 10~60keV Widening Application Fields ~ 2015 (keV Energy) 2016 ~ (MeV Energy) Research with keV ions Surface modification of materials Nano fabrication and etching Semiconductor doping Research with keV ions Surface modification of materials Nano fabrication and etching Semiconductor doping Research with MeV ions Material modification for thick layer Radiation damage test Surface analysis High functional membrane High speed power semiconductor devices

14 Relocation to Beam Utilization Building Gaseous Temporary Building Beam Utilization Building Metal High current Beam Utilization Building  To be completed in Dec  Two-story building : 72x36x12.6 m 3  Supported by Gyeongju-Si Beam Utilization Building  To be completed in Dec  Two-story building : 72x36x12.6 m 3  Supported by Gyeongju-Si 2014 /11/ 07

15 Installation Plan of Ion Beam Facilities  To be commissioned in 2016 Vertical ion beam facility 1MV Accelerator He RFQ Accelerator High current IBSD facility Metal ion beam facility Gaseous ion beam facility Resume beam service in March, 2015  To be commissioned in 2016

16 III.Future plan

17 - Prototype machine fabrication/utilization - Supporting space and utility - Training operator and commissioning - Providing radiation safety management - Prototype machine fabrication/utilization - Supporting space and utility - Training operator and commissioning - Providing radiation safety management Expected Effect : Minimize investment risk → activate investment of company Basic Technology R&D Dedicated ion beam facility Production CompanyKOMAC Prototype (Ion beam facility) Trial Production Technical support system for Industry Integrated R&D Support Center for Industry [1]

18 Machine shop HP Room Proto-typing lab to develop mass-production facility High Energy Room 2 High Energy Room 1 Ion Beam Room 1 Ion Beam Room 2 Ion Beam Room 3 Ion Beam Room 4 Ion Beam Room 5 Ion Beam Room 6 72,000 36,000 Perform feasibility studies for mass-production Support proto-typing mass-production system Fundamental R&D (Simulation & experiment) Support Facility at KOMAC Fundamental R&D Labs Ion Beam Facilities & simulators Integrated R&D Support Center for Industry [2]

19 Continuous improvement of ion beam facilities - To meet users’ requirements for new applications - Ion source R&D Quality assurance of ion beam service - To achieve high quality beam service with high reliability Operation of integrated R&D support center for industry Future R&D

20 Ion source R&D Microwave ion source 2.45GHz, high brightness gaseous (p, d, He, …) RF ion source 200MHz, compact gaseous (p, d, He, …) Bernas-type ion source Enhance the reliability metal (Cu, Co, …) and p TCP ion source 13.56MHz, large area gaseous (N, O, Ar…)

21 Summary Almost completed upgrading existing ion beam facilities Two new machines under development Beam utilization building will be completed in December 2014 Resume beam service in March 2015 Integrated R&D support center for industry will be established in 2015

22 Thank you for your attention!