SCRF Monthly WebEx Meeting March 9, 2011 1.Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.

Slides:



Advertisements
Similar presentations
ILC Global Design Effort 1 ILC SCRF (WG2) program GDE Status Debriefing Hitoshi Hayano 2008/2/25.
Advertisements

Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
Nick Walker Marc Ross Akira Yamamoto ALCPG’11 Eugene Oregon GDE Project Management Summary ALCPG Eugene, Nick Walker 1.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
SCRF Monthly WebEx Meeting June 2, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
A. Yamamoto, N. Walker, and M. Ross, ILC-GDE Project Managers S. Stapnes, CERN LC Studies Leader LCWS12 - Opening Accelerator Plenary, , 18:00.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Summary and Discussion AAP-SCRF-Summary.
Summary of SRF WG, LCWS14 H. Hayano, A. Yamamoto.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
Chair’s report (John) Editor status reports (editors) Special section on XFEL (Nick) AOB (all) 1 TEB Meeting 15 June 2012 Global Design Effort John Carwardine.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
SCRF Meeting Fermilab, April 21-25, 2008 Draft agenda updated, April-10 General Agenda: 4/21: Cavity: Gradient R&D, performance, diagnostics (S0), 4/22:
SCRF Parallel Sessions at TILC09 GDE 活動報告 3月30日(月)10時~ 3号館7階会議 室 設楽 哲夫.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
Nick Walker AD&I WebEx Meeting TeV Upgrade Study AD&I WebEx Meeting Nick Walker 1 Brief summary of ALCPG’11 discussions.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
On S1Global Writeup S1G Writeup Meeting Nobu Toge 1.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
WG3 : Superconducting Linac Session H. Hayano, C. Pagani Geneva,Oct.2010 summary.
Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross.
Accelerator Systems TAG Leaders’ Meeting PM Report –Planning for ALCPG –TDR preparations: Area System Baseline Technical Reviews –Recent e+ workshop experience.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
ILC Gradient R&D Rongli Geng Jefferson Lab ILC Main Linac WebEx Meeting July 28, 2010.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
Global Design Effort Controls LLRF EDR Kick Off Meeting View from the Project Management Office Fermilab / ANL August 20, 2007.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
FNAL SCRF Review R. Kephart. What is this Review? FNAL has argued that SCRF technology is an “enabling” accelerator technology (much like superconducting.
Plan for the First Baseline Assessment Workshop (BAW-1) Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers to be discussed at GDE/ADI.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
SCRF: Monthly WebEx Meeting Oct., 19, 2011
Agenda items TEB activities at KILC TDR SVN repository roll-out
SCRF WebEx Monthly Meeting Agenda and Reports from PM
SCRF Monthly WebEx Meeting May 6, 2010
ILC Cryogenics Work Package Status and Plans
Oct 22 Group Leaders Planning meeting
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Mike PAC Charge & Agenda ALCW15 Plenaries CERN SPC – September 2014
SCRF Monthly WebEx Meeting Sept. 22, 2010
SCRF Monthly WebEx Meeting May, 6, 2011
Global System Kick-off Meeting
SCRF Monthly WebEx Meeting Jan. 12, 2010
ILC-EDR Kick-off Meeting, Cryomodule and Cryogenics
BAW Prep S1 Global Status Pilot Plant Status
Yamamoto WG3: ML-SCRF Parallel Session,
2. SCRF General Preparation for the AD&I Preparation for AAP Review
Technical Design Report preparation
ML-SCRF: Monthly WebEx Meeting Dec., 19, 2012
, A. Yamamoto SCRF WebEx Meeting.
WG3: Main Linac SCRF(cavity,cryomodule)
Yasuhiro Okada, Executive Director, KEK
<month year> doc.: IEEE < e> <Mar 2018>
Presentation transcript:

SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan in 2011 (A.Y., M. R.) 3.Progress in PMs visiting industrial partners (A. Y.) 4.Status of TDP Interim Report (N. W.) 5.General preparation for ALCPG (M. R.) 6.Effort for SCRF-TA organization update (A. Y.) 2.Report from TA Group Leaders 1.Cavity Gradient R&D: R. Geng 2.Cavity Integration: H. Hayano 3.Cryomodule: N. Ohuchi (- >> P. Pierini since ALCPG)) 4.Cryogenics:T. Peterson 5.HLRF:S. Fukuda & C. Nantista 6.ML Integration:C. Adolphsen 3.Special Discussions(30 min.) 1.Preparation for ALCPG Parallel Session: H. Hayano, C. Nantista, and C. Pagani 2.Preparation for ILC-PAC, May 2011: A. Yamamoto SCRF 09 March 20111SERF WebEx Meeting

Schedule related to SCRF Jan :BAW2 at SLAC Feb. 8,9, 18:Visits to Asian SCRF C/C industry Feb. 9, :SCRF WebEX meeting, Feb. 28 – Mar. 3: TTC at INFN/Milano March 3, 4 :Visits to EC SCRF C/C industry March 9: SCRF WebEx meeting March 14-17:Visits to AMs SCRF C/C industry March 19 – 23:GDE/ALCPG, Univ. Oregon, Eugene, May 18 – 20: ILC-PAC, Taipei, China SCRF 09 March 2011SERF WebEx Meeting2

Plan for Visiting Vendor N o. DateCompanyMeeting PlaceTechnical sbjectNotes 12/8HitachiHitachi / TokyoCavity & Cryomodule 22/8ToshibaToshiba / TokyoCavity & Cryomodule 32/9MHIMHI / KobeCavity & Cryomodule 42/9Tokyo DenkaiTD / TokyoNb, NbTi Material 52/18NingXia, OTICOTIC / NingXiaNb, NbTi, Ti Material 63/3ZanonINFN / MilanoCavity & Cryomodule 73/4RIRI, KoelnCavity & Cryomodule 124/27Heraeus/PlanseeEUNb, NB-Ti Material 83/14AESAES,Cavitu & Cryomodule 93/15Niowave Cavity & Cryomodule 103/16PAVAC Cavity & Cryomodule 113/17Wah-ChangIn OregonNb, Nb-Ti material SCRF 09 March 2011SERF WebEx Meeting3 GDE members: PMs, and RDs / Cost-experts / Experts from Lab (shared regionally)

Integration of the Information through Communication with Industry (added, ) 1 st cycle (by April 2011): – GDE visits industrial partners to explain ‘request of information’, in Feb. ~ April, 2011 – GDE expects responses from industrial partners, by the end of April, nd cycle (by July 2011): – GDE individually communicate with the industrial partner, and propose some ways of cost-effective approaches, – GDE expect their responses and evaluation, 3 rd cycle (by November 2011): – GDE scopes the cost estimate up date. SCRF 09 March 2011SERF WebEx Meeting4

TDP Interim Report Distributed to ILCSC, 17 February ~ All chapters submitted to ILC Communicators to be published by ALCPG, March, 2011 Thanks for your cooperation and contribution. SCRF 09 March 2011 SERF WebEx Meeting 5

ALCPG – 2011: Preparation for the TDR New cost estimate and plan for the production of SCRF components and New cost estimate for conventional facilities. R&D aimed at cost-reduction - highlight of ALCPG11 agenda. also include a plan and a cost estimate for the energy upgrade to 1 TeV E_cm. – two special plenary sessions to discuss the energy upgrade strategy. one of the two annual GDE meetings to be joint with CLIC other (e.g. ALCPG11), just GDE emphasize ILC-specific aspects of linear collider design, especially SCRF, at GDE meeting. The next GDE plenary meeting, LCWS11, to be held jointly with the CLIC Study annual meeting, will be in late September 2011 in Granada, Spain. SCRF 09 March 2011 SERF WebEx Meeting 6

ALCPG11 – GDE Agenda Saturday 19 Mar.SundayMondayTuesdayWednesday 8.30Joint Plenary GDE Overview – Barry(40) Detector Overview – TBA (40) Communicators (10) Parallel sessions - Cavity R&D (1) Parallel Sessions - Cryomodule Parallel Sessions -Cryomodule Test -S1-Gobal GDE Plenary WG summaries 10.00Break 10.30Joint Plenary Physics talk: TBA (45) LHC experimental program –machine & detectors: TBA (45) Parallel Sessions - Cavity R&D (2) Parallel Sessions - Cavity Industrialization Parallel Sessions Cryomodule Test (S1-G, FNAL, XFEL) Joint Plenary GDE summary TBA WWS summary TBA 12.00Lunch – END 13.30GDE Plenary CLIC status TBA – 30 Baseline talk – TBA (30) GDE R&D program status TBA – Parallel Sessions - HLRF R&D Joint Plenary I Tev Upgrade: TBA Parallel Sessions FLASH 9 mA Test 15.30Break 16.00GDE Plenary TDR Organisatiion TBA - 90 GDE Plenary – SRF for 1-TeV L. Cooly, K. Saito, R. Geng C. Adolphsen Leave in buses for the Winery Parallel Sessions TDR Work Share -Cavity Gradient -Cavity Integratation -Cryomodule -Cryogenics -HLRF -ML Integration Slide 7 SCRF 09 March 2011SERF WebEx Meeting

ALCPG Parallel session goals: 1) Review and discuss ongoing R&D to understand how it is to be included in the TDR. Special focus should be given to those changes which could substantially impact system interfaces and/or project cost. 2) Evaluate the potential of R&D on alternates and upgrades to be carried out after the TD phase. This fits well with the emphasis on the 1 TeV upgrade and cost containment. 3) Develop a schedule for the next 12 months that leads to the start of the actual writing and editing of the TDR and allows the collection of key supporting documents. Slide 8 SCRF 09 March 2011SERF WebEx Meeting

ILC-PAC, Taipei, May, 2011 SCRF TA report required: – SCRF Cavity and System R&D Cavity Gradient : Rongli Geng Cavity Integration and Test: Hitoshi Hayano – SCRF Industrialization Progress in visiting Companies: Akira Yamamoto Cost estimate update Further plan SCRF 09 March 2011SERF WebEx Meeting9