Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,

Slides:



Advertisements
Similar presentations
2x2 module & stave layouts. 2 options “Small chip” “Big chip” Boundary between “small” and “big” is determined by the 6” sensor wafer layout that must.
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
ATLAS Module building at Glasgow
Notes and questions from a first integration in Catania of the DOM top hemisphere
Design Ash finished electric hybrid tracing to connector fields –Changes to allow for HCC-less and HCC running on one hybrid awaiting final confirmation.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 Stave.
Pneumatic Arm Assembly Instructions. Contents of Pneumatic Arm Kit Wooden pieces (⅜” cross-section): 1 X 24”; 1 X 21⅛”; 8 X 7½”; 4 X 7⅛”; 4 X 7”; 2 X.
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
November Vertex 2002 Kazu Hanagaki1 Layer 0 in D0 Silicon Tracker for run2b Kazu Hanagaki / Fermilab for D0 run2b Silicon Tracker group Motivation.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
RAD – The Radiation Assessment Detector for MSL Seimetz DLR November 30 – December 1, 2006 RSH Packaging Peer Review 1 11/12 – RSH Assembly Sequence and.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
M. Gilchriese Glued Fittings October 26, M. Gilchriese 2 Samples and Prep Three samples using Hysol 9396 Seven samples using Hysol 9394 Surface.
Vacuum chuck for probe station contacts: Howard Wieman work: cell: Eric Anderssen
Receive processed un-thinned wafers from E2V. Processed for bump bonding (dice, bump and attach read out chip)
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Co-Cure Stave Construction 11/10/2010. Co-Cure cables should have flashbreaker tape still covering the surface for this process. SO - don’t remove the.
A PRESENTATION on “ SUSPENSION SYSTEM ”
Wall Framing Grimsby Secondary School Technology Dept.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Jigs and procedure for ladder assembly BelleIInote #8 6 th Feb 2012 Yoshiyuki Onuki University of Tokyo 1.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
Shear Problem Defined There are no bolts on the inboard side of the coil structure to account for shear forces. Bottom Line: friction alone will not prevent.
PS Module Gluing Tests USCMS Outer Tracker Workshop Ulrich Heintz, Meenakshi Narain, Bill Patterson, Sinan Sagir, Adam Lanman, Eric Spencer, Juan Trenado,
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
SOME COMMENTS Ulrich Heintz Brown University 7/23/2015Ulrich Heintz - HF plan 1.
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
David Bailey Gluing. Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004.
1 Jim Thomas - LBL Sector Tools – a conversation with Jon Wirth and Eric Anderssen August 28 th, 2015.
Phase 2 Production Discussion We would like to review the conclusions reached at Caltech on US involvement in the phase 2 outer tracker This will be presented.
This is a self-propelled hovercraft, designed to use only one motor which will both lift the vehicle and propel it forward. The hovercraft works by creating.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Progress on the Prototype design Catania Goikoetxea, Mikel Navarro Medrano, Javier Mainz, March 31st,
Glenn Lopez P0Dule Production Planning. Glenn Lopez Overview Eventually want a detailed procedure for P0Dule production Workspace layout is efficient.
ATHENA - Module Construction P. Riedler, J. Rochet.
1.2 m Stave with Co-cured Facings Using Low Areal Density Fiber G. Viehhauser (Oxford) C. Haber (LBNL) T. Hurteau, W. Emmet (Yale) R. Rurns, D. Lynn (BNL)
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
The medipix3 TSV project
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80.
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
BM&N STS ladders assembly in VLHEP
Berkeley status Aug 10th, 2012.
ATLAS pixel module assembly flow
T. Bowcock University of Liverpool
Ladder Assembly All tools and jigs produced Glue dispensing works
From: Individually Controllable Magnetic Cilia: Mixing Application
Sector 002 Assembly status report
Ladder Assembly All tools and jigs produced Glue dispensing works
Status Caltech meeting – discussions of assembly centers, US responsibilities We will try to organize a PS module assembly workshop at Brown April 30 –
Equipment for Assembly – UK Experiences
Step-by-step assembly instructions
Module/Ladder Assembly
Basic Check Link Principles
Pixel module assembly tooling
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Presentation transcript:

Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz, Narain, Patterson, Spencer - PS Assembly 1

PS module 4/16/2015Heintz, Narain, Patterson, Spencer - PS Assembly 2 Assume electronics hybrids are preassembled Focus on sensor and base plate assembly

Components of PS module 1. CF base 2. P sensor assembly Consists of P sensor, bump-bonded readout chips, spacers glued to readout chips. Assume that alignment targets on the four corners of the P sensor are visible from the top. 3. S sensor Assume that there are alignment targets on all four corners of the S sensor 4/16/2015Heintz, Narain, Patterson, Spencer - PS Assembly 3

Assembly sequence Mount electronics hybrids after gluing sensors to CF base ROICs protrude beyond sensor/spacer preventing insertion of sensor into a preassembly of CF base + electronics hybrids Hybrid spacer and sensor spacer need to be glued together Is support of bottom sensor/ROIC good enough for wire bonding? 4/16/2015Heintz, Narain, Patterson, Spencer - PS Assembly 4

Assembly sequence Why not like this? Alan suggested the following to simplify hybrid spacer design plus some protrusions to make contact with sensor spacer 4/16/2015Heintz, Narain, Patterson, Spencer - PS Assembly 5 The dimensions of the sensors precisely fit inside the useful area of a Si wafer. Increasing the dimension in length direction would require reducing it in the width which reduces the acceptance of the module. Not much overlap between neighboring modules and larger gaps. Suspect this statement is based on 6” wafers?

Assembly sequence Glue spacers to top sensors Maybe use similar procedure being developed for 2S modules Allows us to pull silicon sensor flat with vacuum chuck How to define position of spacers? We are working on some ideas… 4/16/2015Heintz, Narain, Patterson, Spencer - PS Assembly 6

Assembly sequence Glue bottom sensor to CF base plate Apply uniform pressure to bottom sensor when gluing it to CF base How flat is the bottom silicon? How coplanar are the surfaces of the ROICs? How good are the edges of the ROICs? How much pressure do we need? How much pressure can we apply w/o breaking ROICs or bump bonds? There are no prototypes yet so we don’t know. Do sensor and CF base have to be electrically isolated? How? Yes. The plan is to cover the CF base with parelene. What are the specs for the glue? How to apply it? No specs yet. Maybe use glueing stamp (ala FPIX phase 1) avoid bubbles over the large area? 4/16/2015Heintz, Narain, Patterson, Spencer - PS Assembly 7

Assembly sequence Glue top sensor/spacers to bottom sensor/ROICs Use vacuum chuck to flatten silicon Apply pressure to spacers to squeeze glue joints It might be useful if we can see alignment marks on both sensors simultaneously Could the bottom sensor be a little longer than the top sensor? Raises the same acceptance problem as changing the size of top sensor 4/16/2015Heintz, Narain, Patterson, Spencer - PS Assembly 8 Vacuum chuck

Assembly stage 4/16/2015Heintz, Narain, Patterson, Spencer - PS Assembly 9 Linear stage ≈ 6 inch travel in x Pins to position CF base Vacuum to pull down CF base x y z Linear stage travel in z Fine adjust in y Fine adjust in Vacuum to pick up sensors Weight to apply pressure to glue joints

Assembly stage 4/16/2015Heintz, Narain, Patterson, Spencer - PS Assembly 10 Microscope  6 inch travel in x Relative alignment of sensors x y z

Step 1 Load CF base assembly and align using pins so that CF base is aligned with x direction 4/16/2015Heintz, Narain, Patterson, Spencer - PS Assembly 11

Step 2 Load bottom sensor/ROICs Maybe initial alignment using edges Fine align using microscope and y/ adjustments in pickup 4/16/2015Heintz, Narain, Patterson, Spencer - PS Assembly 12

Step 3 Apply glue to CF base Move base under sensor Align in x with linear stage Lower sensor onto base Use weight of sensor pickup to compress glue joint 4/16/2015Heintz, Narain, Patterson, Spencer - PS Assembly 13

Step 4 After glue has cured lift vacuum pickup Move assembly from under pickup 4/16/2015Heintz, Narain, Patterson, Spencer - PS Assembly 14

Step 5 Apply glue to bottom of spacers Load top sensor/spacers (with spacers facing down) Maybe initial alignment using edges Fine align using microscope and y/ adjustments in pickup 4/16/2015Heintz, Narain, Patterson, Spencer - PS Assembly 15

Step 6 4/16/2015Heintz, Narain, Patterson, Spencer - PS Assembly 16 Move base under sensor Align in x with linear stage Lower sensor onto base Use weight of sensor pickup chuck to compress glue joint It might be useful if we can see alignment marks on both sensors simultaneously

Conclusion First thoughts on assembly sequence and alignment procedure for PS module Fixtures should not be too expensive It should be possible to automate alignment procedure with pattern recognition software Plenty of questions… We will start to try out some steps in this sequence 4/16/2015Heintz, Narain, Patterson, Spencer - PS Assembly 17