GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.

Slides:



Advertisements
Similar presentations
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
Advertisements

GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 1 GLAST Large Area Telescope: EM1 Data Analysis and Calibration Summary Report Eduardo.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.1 Ground Operations Software 1 Gamma-ray Large Area Space Telescope.
GLAST LAT Project Instrument Analysis Meeting– May 27, 2005 Hiro Tajima, TKR Bad Strips 1 GLAST Large Area Telescope: TKR Bad strips analysis update Hiro.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Elliott.
GLAST LAT Project Integration and Test SVAC Peer Review 1 GLAST Large Area Telescope: I&T Integration Readiness Review SVAC Peer Review July 21,
GLAST LAT Project 1 Tracker “mini-tower” Full Size Calorimeter module Face to Face IDT meeting March 20, 2002 Convener: E. do Couto e Silva Engineering.
GLAST LAT ProjectSVAC Peer Review July 21, 2004 E. do Couto e Silva 1/100 GLAST Large Area Telescope: Overview I&T Science Verification Analysis and Calibration.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT Project Managers F2F 5/11/ Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test.
SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 1/7 SVAC 8 tower testing+ACD Anders and Eduardo.
GLAST LAT Project Technical/Cost/Schedule Review 03/31/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Gary.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Section Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review 7.2.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 1/6 SVAC EM2 Goals Develop distributions for E2E tests that involve comparison of.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 1 Gamma-ray Large Area Space.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 K.Young 1 LAT Data Processing Facility Automatically process Level 0 data.
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 8 - Page 1 GLAST Large Area Telescope: I & T Peer.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
GLAST LAT Project IFC Tour – Sep 5,2003 Larry Wai 1 GLAST Large Area Telescope: Integration and Facility Status Larry Wai SU-SLAC Integration and Facility.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Instrument Configuration by File James Swain Stanford.
GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 8 EGSE, Performance Monitoring, Calibration 1 GLAST Large Area Telescope: AntiCoincidence Detector.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
I&T&C Organization Chart
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope
GLAST Large Area Telescope
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
Overview Goal Study GEM variables in SVAC ntuple
Commissioning of the ALICE-PHOS trigger
Mini Tower Preliminary Results
Integration and Test Organization Chart
GLAST Large Area Telescope: I&T Test Readiness Review
Introduction and Overview
GLAST Large Area Telescope
Status Report and highlights from workshop II
Integration & Test Instrument Operations Coordination
SVAC Configuration Verification
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Test Readiness Review
Presentation transcript:

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott Bloom I&T Manager Gamma-ray Large Area Space Telescope

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 2 OUTLINE SVAC requirements Current Status of Documentation Data Taking Plans Data Processing Chain (pipeline) Data Quality Monitoring Calibrations Data Analysis Future Work Main Concerns and/or Risks Planning Implementation Summary

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 3 List of Documents SVAC Plan LAT-MD –Master Plan : Level 3 –Covers pre and post launch activities –Expect updates after transition into FSW (during I&T) SVAC Plan LAT-MD –Describes implementation details : Level 4 –Covers all LAT integration at SLAC –Baseline for integration at SLAC is already described –Expect updates after 1 and 2 tower tests (lessons learned) SVAC Contributed Manpower LAT-MD –Captures existing commitments – Level 3

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 4 Cosmic Ray Data Taking

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 5 VDG Data Taking

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 6 SVAC Scripts (ECD by online 12/15) SVAC Requirements for Data Taking –Shall produce several data runs –30 to 60 min (TBR) : for one and two towers –Shall produce the data taking configuration for each run with information about the hardware under test –external info »VDG rate used, solicited trigger rate for E2E tests –internal info »to support calibrations and data analysis »e.g. zero suppression ON/OFF, etc »Full list provided in LA-MD –Shall produce data taking configuration in time reasonably small when compared with the duration of run –Snapshots of registers currently take ~ 1 min to be produced –rc.report (summary info)

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 7 Data Flow – 1 hr of Cosmics Single Tower (1 of 2) Record data Transfer Data within Firewall Data arrives In SLAC farm SVAC pipeline is launched 1 hr 20 min 5 min 10 min Data Taking Time is being improved by SLAC Network people. Online Pipeline

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 8 Data Flow – 1 hr of Cosmics single tower (2 of 2) Online Pipeline Configuration Reports on the Web Digi Reports on the Web Digi File processed Analysis Files processed Verification of H/W settings Analysis of reports Data Analysis Launch digi processing Recon Reports on the Web Recon File processed Analysis of reports Launch recon processing 15 min10 min20 min15 min 10 min360 min20 min15 min 10 min Hrs/weeks Launch analysis processes 10 min 25 min 15 min SVAC Pipeline Scheduler limited (5 min) CPU limited (~1 GHz) Human intervention

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 9 SVAC Reports The Quality Monitoring System –uses the pipeline to automatically generate reports –Reports are uploaded to the Web –We are adding more information an a per need basis Report format is designed for 16 towers (no ACD yet) and works for 1, 2, …16 towers. –Configuration Reports (parsed from online files) –CAL FLE/FHE/LAC thresholds –TKR GTRC splits –Etc –Digitized and Reconstruction Reports (parsed from offline files) –Hit multiplicities –Number of crystals hit –Trigger bits set –Number of reconstructed tracks –etc

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 10 Run selection (1) Select a run

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 11 Run selection (2) Get run info produced by the online Get digitization and reconstruction reports Get register configuration info

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 12 Instrument Configuration (1) CAL register configuration EM2 hardware (only 5 planes)

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 13 Instrument Configuration (2) Code accommodates missing elements (just in case…)_

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 14 Retrieval of Large Number of Runs For massive production needed for calibration all runs must be retrieved in a convenient format (application dependent) The infrastructure is in place and needs to be tailored to user needs

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 15 Data Quality – SVAC Reports Single tower data from PISA (of course not in the grid) Single tower data from PISA (of course not in the grid LAT MC

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 16 Calibration Requirements Calibration delivery shall include –Algorithms for calibrations –an executable that combines data from different runs –runs on the SLAC batch farm –reference datasets –Documentation describing usage and algorithm description –Metadata to address serial number and bay location in a grid SAS Calibration types are defined in the SVAC Plan LAT-MD – TKR –Dead and Noisy strips –TOT Conversion Parameter (produced by EGSE scripts) –TOT MIP Conversion (in progress) –CAL –Pedestals –Gains (muon peaks) –Light asymmetry (muon slopes) There is an operational version, but CAL-SAS calibration package is being rewritten. Delivery scheduled for 1 month prior to beginning of SVAC tests.

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 17 E2E Tests - Data Analysis Requirements Support the analysis of the data from trigger and data flow tests for the LAT when is fully assembled as recommended by the End-to-end Committee report Datasets Obtained using Cosmic Rays and VDG photons as particle sources will be produced by changing configuration settings as defined in the End-to- End Committee Report and captured in LAT-MD (See Particle Test Peer Review) Results Reports automatically generated at the end of the run Reports contain tables and plots to identify coarse problems and establish that data is analyzable Final acceptance and sign-off occurs at LAT level Timescale for Results few hours (TBR) after completion of the data taking –Turn around is determined by the complexity of tasks –Preliminary verification will be performed for 1, 2 and 8 Towers (TBR) during LAT integration

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 18 Monte Carlo Simulations Cosmic Rays and Van de Graaff photons

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 19 Examples of Monte Carlo Simulation (1) One tower Two tower

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 20 Summary If tower delivery occurs on Dec 22 –SVAC will be ready to start –Data Processing –Data Quality Monitoring –Calibrations –Data analysis