GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 8 EGSE, Performance Monitoring, Calibration 1 GLAST Large Area Telescope: AntiCoincidence Detector.

Slides:



Advertisements
Similar presentations
Glast italian software meeting, Udine 01/30/2003 Luca Latronico The GLAST online software Gamma-ray Large Area Space Telescope Luca Latronico Glast Italia.
Advertisements

GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 1 GLAST Large Area Telescope: EM1 Data Analysis and Calibration Summary Report Eduardo.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.1 Ground Operations Software 1 Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectI&T/Online Workshop October 29 to November 1, 2002 R. Claus1 EM1 EGSE Configuration VME/cPCI Chassis LAT-COMM Electronics/OnlineSubsystem/simulator.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 1 GLAST Large Area Telescope: I&T Integration Readiness.
A.Chekhtman1 GLAST LAT ProjectCalibration and Analysis group meeting, April, 3, 2006 CAL on-orbit calibration with protons. Alexandre Chekhtman NRL/GMU.
GLAST LAT Project IA weekly meeting, February 3, 2006 ACD subsystem Alex Moiseev 1 ACD Pedestals ACD Team at Goddard: Alex Moiseev Dave Thomspon Bob Hartman.
GLAST LAT Project 1 Tracker “mini-tower” Full Size Calorimeter module Face to Face IDT meeting March 20, 2002 Convener: E. do Couto e Silva Engineering.
GLAST LAT ProjectOnline Roadmap Progress Report – April 22, 2004 R. Claus1 Online Roadmap to the July 2004 Freeze Progress report for April 22, 2004 (to.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 1 GLAST Large Area Telescope: ACD Integration & Test Jim La/ACD I&T Lead.
GLAST LAT ProjectGLAST Flight Software IDT, October 16, 2001 JJRussell1 October 16, 2001 What’s Covered Activity –Monitoring FSW defines this as activity.
GLAST LAT Project IA Workshop, July 14, 2005 ACD subsystem Alex Moiseev 1 GLAST Large Area Telescope: IA Workshop July 14, 2005 AntiCoincidence Detector.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
Alex Moiseev NASA/GSFC 12/16/2005 Some ACD Calibration issues I.ACD mip peak monitoring 1. ACD mip peak monitoring requires the measurements to be done.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
ACD calibrations Pedestals Measured from online script Measure PHA w/ HV off, no charge injection Use cyclic triggers ~ ADC counts, very narrow.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 6 - Page 1 GLAST Large Area Telescope: I & T Peer.
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
Tracker Subsystem1 GLAST LAT Project Production Readiness Review, 25 August, 2004 GLAST LAT Tracker TOWER-A PRR TKR Tower Electrical Test Plan Luca Latronico.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: On-Orbit Calibration and.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.2 Visualization Tools 1 Gamma-ray Large Area Space Telescope GLAST.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT ProjectI&T Face-to-Face Online Presentation – May 30, 2002 R. Claus1 I&T Online Status and Plans Ric Claus.
Preparation Examples ACD has provided a website of their CDR preparation status I encourage everyone to view posted material, including the CDR Dry Run.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Overview.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 4 Tile Detector Assemblies 1 GLAST Large Area Telescope: AntiCoincidence Detector (ACD) WBS
GLAST LAT ProjectI&T Test Planning Telecon, 8 Nov 2004 CAL Test and Calibration DefinitionJ. Eric Grove GLAST LAT GLAST LAT Calorimeter Subsystem Gamma-ray.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectPMT Procurement Review May 24, 2002 AntiCoincidence Detector Design Overview 1 GLAST Large Area Telescope: AntiCoincidence Detector (ACD)
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
GLAST Large Area Telescope:
GLAST Large Area Telescope:
I&T&C Organization Chart
Gamma-ray Large Area Space Telescope ACD Final Performance
Commissioning of the ALICE HLT, TPC and PHOS systems
Gamma-ray Large Area Space Telescope
Electrical Ground Support Equipment Verification Test Support
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
Gamma-ray Large Area Space Telescope
GLAST Large Area Telescope
The IFR Online Detector Control at the BaBar experiment at SLAC
GLAST Large Area Telescope: I & T Peer Review EGSE/Online System
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
GLAST Large Area Telescope:
Mini Tower Preliminary Results
GLAST LAT System Engineering
Integration and Test Organization Chart
Introduction and Overview
Integration & Test Instrument Operations Coordination
Presentation transcript:

GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 8 EGSE, Performance Monitoring, Calibration 1 GLAST Large Area Telescope: AntiCoincidence Detector (ACD) EGSE, Performance Monitoring, and Calibration Dave Thompson, Alex Moiseev, Bob Hartman Performance Monitoring and Calibration Bob Baker, Dave Sheppard EGSE for Electronics Verification Connie Houchens, Sharon Orsborne ACD Subsystem EGSE Gamma-ray Large Area Space Telescope

GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 8 EGSE, Performance Monitoring, Calibration 2 Applicable Documents ACD Performance Monitoring and In-Flight Calibration, LAT-TD D1 ACD Functional Test Plans (Comprehensive Performance Test), LAT-TD D1 ACD Gain Calibration Test with Cosmic Ray Muons, LAT-TD D1 GLAST-LAT SVAC Plan, LAT-MD GLAST LAT I&T Online Requirements Document – Level 3, LAT-SS

GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 8 EGSE, Performance Monitoring, Calibration 3 Electrical Ground Support Equipment - EGSE Purpose: configure, command, exercise, and analyze the operation of the ACD, starting with the basic electronics and expanding to the full ACD, the LAT, and GLAST. The LAT I&T group often uses the term “Test Stand,” reserving EGSE for the computer portion of the set-up. Approach: The LAT I&T group supplies ACD the EGSE computer and basic software package The LAT Electronics group supplies ACD the interface electronics The ACD team is responsible for writing test scripts and displays and for analyzing the results.

GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 8 EGSE, Performance Monitoring, Calibration 4 VME Chassis DC Power ACD Test Stand Configuration – One Version LAT-COMM: AEM & GLT Electronics/Online Groups provide hardware/software ACD Phototube (or simulator) Ethernet Router and Firewall LAN Ethernet Main Dataflow LAN Ethernet Back door debug RS-232 WAN EGSE Workstation CPU Central Database GARC GAFE/ADC FREE Card High Voltage Supply

GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 8 EGSE, Performance Monitoring, Calibration 5 EGSE Software  LAT Project Programming Languages  Python : Object oriented scripting language  XML: Describes hardware configuration and data  Qt : Graphical user interface API  HippoDraw : Plotting/Drawing API  ACD EGSE Software Development  Test Scripts to exercise hardware components (Python, XML)  GUI Application to display science data (Qt, HippoDraw)

GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 8 EGSE, Performance Monitoring, Calibration 6 from gLAT import * from gSchemaConfig import * from cmdCli import * from operator import * #AEM Test uses garcSchema.xml and TestConf.xml def MaxPhaReturn(cmd=None, disconnectOnExit=1, cfile=0): """ global aem, glt, arc, afe if cmd == None: cmd = CmdCli(123) cmd.connect() lat = readSchema('garcSchema.xml') aem = lat.downAEM() arc = aem.downARC(0) aem.setCmd(cmd) arc.CMD_RESET=1 arc.VETO_DELAY=150 1 of 3 Example Python Script

GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 8 EGSE, Performance Monitoring, Calibration 7 Qt Graphical User Interface

GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 8 EGSE, Performance Monitoring, Calibration 8 Performance Testing Status Hardware  “Home-built” EGSE for GAFE and GARC testing  First generation LAT Test Stand – limited testing for one FREE card  Next generation of LAT Test Stand due in April  Full flight-like interface needed for assembled ACD  Test Plans  Test plans for GARC, GAFE, and FREE Card  Test procedure/script for GARC  Test plan for end-to-end test (scintillator to data out)  Functional Test Plan (Comprehensive Performance Test that includes notes for less complete functional tests); procedures to be built up from electronics and end-to-end test procedures plus system-unique tests

GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 8 EGSE, Performance Monitoring, Calibration 9 Test Environments and Plans Stand-alone tests for TDAs and phototubes –Use cosmic ray muons as source in laboratory testing Test boards for GAFE and GARC –All commands/verification, electronics performance such as linearity (GAFE test plan, GARC test plan) –Use charge injection as source End-to-end test (tile, fibers, phototube, GAFE, GARC, ADC, AEM/GLT) –Performance of electronics with real data, including pedestals, MIP peak, threshold (End-to-end test plan) –Use cosmic ray muons as source FREE card (up to 18 phototubes) –Performance of electronics with real data, including pedestals, MIP peak, threshold for multiple tiles –Functional testing (limited functional test) –Use cosmic ray muons as source ACD assembly (12 FREE cards, 194 phototubes) –Functional testing (all functional tests, including Comprehensive Performance Test) and calibration of each of the 194 channels. –Use cosmic ray muons as source –EGSE test scripts to be provided to LAT I&T LAT assembly, GLAST assembly, and post-launch –ACD testing folded into overall LAT testing

GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 8 EGSE, Performance Monitoring, Calibration 10 Performance Monitoring/Calibration Pedestal (Baseline) MIP Peak Threshold MIP Peak Width Other Parameters Electronics response and linearity (use charge injection) HV (read out) Rate (read out) Efficiency (calculated) Calibration Source Muons on ground, protons/electrons in flight

GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 8 EGSE, Performance Monitoring, Calibration 11 Performance Monitoring/Calibration Calibration Tables ACD Performance Monitoring and In-Flight Calibration, LAT-TD D1 TileTubeRate (Hz) PedestalElec. Resp. MIP Pos. MIP FWHM Thresh. command Thresh. (derived) HV command HV readout Effic. (derived) TileTubeStep 0Step 1Step 2Step 3 Step 61Step 62Step Linearity – Electronics Response v. Steps in Charge Injection

GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 8 EGSE, Performance Monitoring, Calibration 12 Tracker Calorimeter Tracker Calorimeter Use the tracker to identify charged particles hitting particular tiles. ACD tiles themselves can be used to trigger on particles. Charge injection is used to calibrate the electronics response. Charged particles provide a self-calibration source for measuring light collection and phototube response (used to calculate efficiency). In-Flight Calibration Plan

GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 8 EGSE, Performance Monitoring, Calibration 13 BACKUP

GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 8 EGSE, Performance Monitoring, Calibration 14 Hardware/Software Hierarchy LAT AEM/GLT RC FE GARC GAFE Registers XML is used to describe hardware configuration