Preparation for Run10 RIKEN/RBRC Itaru Nakagawa. TLD badges (to be replaced every two weeks) Location of dosimeters in MuTr.S St.1 TK361 TK362 TK363 TK364.

Slides:



Advertisements
Similar presentations
Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.
Advertisements

Post Run13 MuTR/MuTrig Maintenance 1. Cathode Cable in mis-contact : South Station-1 Oct-5, Gap-2 2.
S1,N1 Counters RIKEN/RBRC Itaru Nakagawa. 4/15 ~ 4/29 S1,N1 Counters in MuID square hole. Lay down on the bottom of garage shielding.
Recap Clamp 1008 and Production RIKEN/RBRC Itaru Nakagawa 1.
MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April GeV pp (2+3 weeks) GeV pp (1+6 weeks)?
MuTr/MuTrig Performance of Run13 RIKEN/RBRC Itaru Nakagawa 1.
ADTX Threshold Scan RIKEN/RBRC Itaru Nakagawa 1. Run13 ADTX Threshold Scan March 3, 2013 MUID1D HV=Run12 Nominal Setting MuTrig e-Log entry=#
MuTr Recapacitation RIKEN/RBRC Itaru Nakagawa 中川格 1.
South Arm FEE Performance Prior to Au run, all FEMs installed and working. Currently, 157 of 168 FEMs read out useful data. = 93.5% operational FEM losses:
Trigger Bias Study at Test Bench Data RIKEN/RBRC Itaru Nakagawa.
Optical Alignment System (OASys) Masters Thesis of Yuki Ikeda Rikkyo University Presented by Itaru Nakagawa RIKEN/RBRC 1.
Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC.
MuTr HV Optimization RIKEN/RBRC Itaru Nakagawa 1.
GEM progress from Chinese collaboration Yuxiang Zhao University of Science and Technology of China Aug 20,
1 10/1/2009 PHENIX WEEKLY PLANNING 10/1/2009 Don Lynch.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Andrew Glenn 4/21/02 Commissioning and Performance of the. Muon Identifier Andrew Glenn (University of Tennessee), for the PHENIX collaboration April APS.
Run11 MuTrig-FEE Summary RIKEN/RBRC Itaru Nakagawa 1.
South SG1 Trigger High Rate Sanghwa Park, Katsuro Nakamura, Yoshimitsu Imazu, and Itaru Nakagawa 1.
South SG1 Trigger High Rate Sanghwa Park, Katsuro Nakamura, Yoshimitsu Imazu, and Itaru Nakagawa 1.
Technical Support /26/08 PHENIX WEEKLY PLANNING 10/2/2008 Don Lynch.
MuTR/MuTrig Readiness for Run13 Itaru Nakagawa on Behalf of MuTrig/MuTr Group 1.
CALO News Pascal Perret LPC Clermont 26 November 2014.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
1 MuTRG-FEE Upgrade Status RIKEN/RBRC Itaru Nakagawa.
Technical Support /4/08 PHENIX WEEKLY PLANNING 9/4/2008 Don Lynch.
Run13 MUID Hit Efficiency RIKEN/RBRC Itaru Nakagawa 1.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
PHENIX Run8 Summary d+Au was fantastic! - x30 over Run3 baseline for future A+A new level of precision on intrinsic Cold Nuclear Matter physics now p+p.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
1 South Arm Installation Plan Itaru Nakagawa RIKEN/RBRC.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
1 10/22/2009 PHENIX WEEKLY PLANNING 10/29/2009 Don Lynch.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
Performance of PHENIX High Momentum Muon Trigger.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
PERFORMANCE OF THE PHENIX SOUTH MUON ARM Kenneth F. Read Oak Ridge National Lab & University of Tennessee for the PHENIX Collaboration Quark Matter 2002.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
Technical Support /5/08 PHENIX WEEKLY PLANNING 12/5/2008 Don Lynch.
10/2/2002MJL - MuTr DC Report Muon Tracking Status South North.
Recap Clamp for MuTr Station-3 Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration Especially credit to: Tsutomu Mibe (KEK) Yoshinori Fukao.
Performance of PHENIX High Momentum Muon Trigger.
Onsite Status RIKEN/RBRC Itaru Nakagawa. OASys Light Source Spacer.
Technical Support /28/08 PHENIX WEEKLY PLANNING 8/28/2008 Don Lynch.
Performance and Early Results from the Muon Tracking System of Rusty Towell of Abilene Christian University for the PHENIX collaboration First Joint Meeting.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
MuTRG Channel map summary June 30, 2008 Tsutomu Mibe KEK 1.
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
Recap Clamp Installation RIKEN/RBRC Itaru Nakagawa 1.
PHENIX WEEKLY PLANNING 1/31/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
MuTrig-FEE Install Status RIKEN/RBRC Itaru Nakagawa 1.
Run11 MuTrig Performance RIKEN/RBRC Itaru Nakagawa 1.
1 11/19/2009 PHENIX WEEKLY PLANNING 11/19/2009 Don Lynch.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
Onsite Report Itaru Nakagawa RIKEN/RBRC. Schedule.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
RPCs for the W measurement in PHENIX Chong Kim Korea University Japan-Korea PHENIX collaboration workshop, Nov. 27, 2012 for the PHENIX collaboration.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
Onsite Work Summary RIKEN/RBRC Itaru NAKAGAWA. Completed Re-capacitation St-1, Gap-1 N&S Completed St-2 Terminators Install to South Oct.5 (except for.
TS2 preparatory meeting
Introduction Status before the 2009 run Results from the 2009 run
Seyoung Han / Ewha Woman’s Univeristy
Presentation transcript:

Preparation for Run10 RIKEN/RBRC Itaru Nakagawa

TLD badges (to be replaced every two weeks) Location of dosimeters in MuTr.S St.1 TK361 TK362 TK363 TK364 Distance from Beam Pipe 17"32"47"62" Film Badge Cr39 Film Badge Cr39 Film Badge Cr39 Film Badge Cr39 Nov. 11 ~ Dec. ?TK nTK nTK nTK n 5 Dosimeters (stay for whole run period)

Dosimeter Extension + 10”

Dosimeter Extension

Short Term To Do List (from report) OASys camera alignment ✓ Swap LV distributor for St.1,Q4 w/ spare due to offset current ✓ Inspect Thermocouple in St-2, Oct.7 (readout somewhat low ~ 33 degrees) North St-3, Oct-1 high fake hit rate issue BCLK Timing tune

Near Future Plan Clean up test bench Organize Spare boards  bookshelf Channel Map  database Cosmic data taking from Dec.1 MuTR Operating HV Values for Run10 – Need to prove better resolution in Run9

Problem in ADTX

Was OK before As of Oct.29 Right after LV distributor was replaced Trace back history: Nov.6 bad Nov.5 measurment failed. Nov.3 OK. Nov.31 OK. Thus the problem started sometime between Nov.3 and 6th.

ADTX Chassis-2 Board-1 South arm, station 3, octant 2 and 7, non-stereo planes strip Chassis 1Chassis 2Chassis ADTX chassis 1ADTX chassis 2ADTX chassis 3 slot= slot= connector1357 Half Octant 1 Gap1 Number of chassis = 6 Gap2 Number of ADTX = 8 The LV distributor broke for Chassis-2 channel in Oct-29 and replaced then.

With Calibration Pulse