Yu. Guz 16/04/20081 Radioactive source status R. Dzhelyadin, Yu. Guz IHEP, Protvino.

Slides:



Advertisements
Similar presentations
Managing Your Network Environment © 2004 Cisco Systems, Inc. All rights reserved. Managing Cisco IOS Devices INTRO v2.0—9-1.
Advertisements

Normal text - click to edit Status Report TPC Electronics Meeting, CERN Johan Alme & Ketil Røed, UoB.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
1 HLT – ECS, DCS and DAQ interfaces Sebastian Bablok UiB.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
Yu. Guz 2015/04/211 CALO HV Updated version of the 2012 slides, ** See also Anatoli’s.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
Copyright© 2003 Avaya Inc. All rights reserved Upgrade to Communication Manager 2.0 with Migration to Linux 8.0 Purpose: This presentation was prepared.
Emlyn Corrin, DPNC, University of Geneva EUDAQ Status of the EUDET JRA1 DAQ software Emlyn Corrin, University of Geneva 1.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
C.Combaret, L.Mirabito Lab & beamtest DAQ with XDAQ tools.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
0 The LHCb Hadron Calorimeter Rustem Dzhelyadin, (IHEP, Protvino) INSTR02 Conference, BNPI, Novosibirsk, Russia Contents: Œ Design overview  Trigger with.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
P. Chochula ALICE Week Colmar, June 21, 2004 Status of FED developments.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
HCAL status and plans Yu. Guz.  Finally, no dead cells in the run However: There are unstable PMTs (mainly rate effect) Dark current.
Scanning the irradiated ECAL modules with 137 Cs source Yu. Guz 2011/12/161.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
GAYA Analyzer SDD Presentation. GAYA Analyzer Introduction OMS40G256 is a hardware device used for detection of radioactive radiation for medical imaging.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
Inventory of radioactive sources present in the cavern at pit 8 Gloria Corti Experimental Area Meeting 05 August 2008.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ECAL and HCAL status 1Yu. Guz 2015/02/18. ECAL maintenance 2Yu. Guz 2015/02/18 There were 22 non operational cells at the A side, because of 3 dead CW.
ALICE Use of CMF (CC) for the installation of OS and basic S/W OPC servers and other special S/W installed and configured by hand PVSS project provided.
1 HCAL production, QC and preparation for installation Overview of the status report Rustem DZHELYADIN (IHEP, Protvino)  The general status.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
Source Controller software Ianos Schmidt The University of Iowa.
ECS and LS Update Xavier Vilasís-Cardona Calo Meeting - Xvc1.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
CERN, Artur Barczyk, CERN/PH-LBC 1 Network Monitoring and Control in LHCb A (very) brief introduction.
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
1 Summary of Calorimeter LED monitoring, LV & MV power and HV electronics + ECS control Anatoli Konoplyannikov Outline  Software tool of the LED.
G. Dissertori ETHZ CMS Electronics ECAL DCS Software Planning G. Dissertori ETHZ
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Electronics Status New DCM daughter card works. –Three cards has been assembled. –One daughter card has been send to Jamie yesterday by FedEx overnight.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Status of the DSP/ASPOC EM
LKr status R. Fantechi.
(ZCO) ZIMBRA Connector for Outlook User Manual
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
TPC Commissioning: DAQ, ECS aspects
Controlling a large CPU farm using industrial tools
SPD – ALICE DAQ/ECS/Trigger Integration Status Report
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
LHCb HCAL: performance and calibration
Control and monitoring of trigger algorithms using Gaucho
Data validation in Statistical Office of the Republic of Serbia
Eric van Herwijnen March 10th 2005
Team Project: A Surveillant Robot System
Pierluigi Paolucci & Giovanni Polese
PSS0 Configuration Management,
Plans for the 2004 CSC Beam Test
Presentation transcript:

Yu. Guz 16/04/20081 Radioactive source status R. Dzhelyadin, Yu. Guz IHEP, Protvino

Yu. Guz 16/04/20082 HCAL status: 137 Cs calibration system Integrators ★ the integrators are fully operational, 9 working spare boards exist ★ the firmware of the integrator readout boards was updated (Anatoly): now the internal timer is operational ★ the readout is now able to work in the “block” mode. ☯ normal mode: 3.5 ms/16-ch module, 7.5ms/40-ch module ☭ block mode: 1.5 ms/module, both 16- and 40-ch ones the optimum for the calibration is at ~3…5 ms  block readout chosen (with some throttling) Hydraulic system, CAN bus control electronics ★ fully functional. Many runs performed with dummy capsules at both HCAL halves, no major problem detected by now

Yu. Guz 16/04/20083 HCAL status: 137 Cs calibration system Software ★ new version of the control program running on HCDCS01W is prepared: ✜ updates made in the working sequence, raw data format, interface ✜ DIM server added, publishing the status of the system and executing DIM commands ★ the integration into ECS is under way ➣ A PVSS panel showing the status of the system and sending commands to the calibration control exists ☹ the integration into the FSM is not yet finished. To be completed by the end of April (with help of Xavier)

Yu. Guz 16/04/20084 HCAL status: 137 Cs calibration system Safety procedure, installation of the 137 Cs sources: ★ the three 137 Cs sources are stored at CERN in CS/RP group. ★ the transport containers for the sources are produced (E. Chernov, K. Kachnov) ★ the 3 blinking warning lights are installed, one at the entrance to the platform and two on top of it ★ the Safety Manual is updated by Rustem, according to the feedback obtained from Gloria, Eric and Marie- Noelle. The official approval procedure is foreseen.

Yu. Guz 16/04/20085 HCAL status: 137 Cs calibration system The system is now ready for the HCAL calibration with real 137 Cs source. The goal is to perform our first calibration run in the beginning of May