Co-PIs: Erol Tutumluer Marshall R. Thompson RA: Deb Mishra Subgrade Soil Support and Stabilization O’HARE Airport Modernization Research Project Research.

Slides:



Advertisements
Similar presentations
Airport Wildlife Safety Management CEAT/OMP Research Program 2006.
Advertisements

LOW VOLUME ROAD DESIGN EMPIRICAL APPROACH.
National Highway Institute Federal Highway Administration
PI: Erol Tutumluer RA: Tongyan Pan Testing of OMP Aggregates for Shape Properties O’HARE Airport Modernization Research Project.
TIA Engineering Manual 6 th Edition Preview and Overview.
LIME TREATMENT APPLICATIONS at OMP
Co-PIs: Erol Tutumluer Marshall R. Thompson RA: Deb Mishra Subgrade Soil Support and Stabilization O’HARE Airport Modernization Research Project Research.
SESSION 3 Subgrade This module presents the concepts and methods of characterizing the subgrade for the purpose of concrete pavement design. It also highlights.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
Proceedings and Report of the Expert Meeting: Arrangements Proceedings and Report of the Expert Meeting: Arrangements.
Qatar Planning Council 1 Best Statistical Information to Support Qatar’s Progress Statistical Capacity Building for Information Society in Qatar.
 Materials – Highest & Best Use  Public Health  Safety  The Environment  Safety  Reliability  Performance  Flexibility  Productivity Improve Mobility.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Lecture Six Radu ANDREI, PhD, P.E., Professor of Civil Engineering
Center of Excellence for Airport Technology A Partnership in Research and Outreach with the O’Hare Modernization Program David Lange University of Illinois.
Parts Standardization & Management Committee (PSMC) Meeting Oct 22, 2007 San Diego, CA Parts Management Reengineering Implementation Process Team (PMRIPT)
Software Project Management Lecture # 7. Outline Project Scheduling.
Center of Excellence for Airport Technology A Partnership in Research and Outreach with the Federal Aviation Administration and the O’Hare Modernization.
Pre-Proposal Conference NASA Langley Research Center October 26, 2009.
Subgrade Soil Support and Stabilization
Copyright 2008  Project management process groups progress from initiating activities to planning activities, executing activities, monitoring and controlling.
Airport Wildlife Safety Management CEAT/OMP Research Program 2006.
Center of Excellence for Airport Technology A Partnership in Research and Outreach with the O’Hare Modernization Program David Lange Department of Civil.
Center of Excellence for Airport Technology OMP Project Meeting, July 14, 2005 David Lange Department of Civil and Environmental Engineering University.
THE DESIGN OF POROUS PAVEMENT SHOULDERS AT RICHMOND INTERNATIONAL AIRPORT 33 rd Annual Airports Conference March 3, 2010 – Hershey, PA Presented by: H.
Technical Proposals Written in order to expedite job-related processes: Significant operational improvements New business Additional jobs Safer working.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
1 Field validation of constructed sub-grade and pavement John S. Popovics Jeffery Roesler Marshall Thompson David Lange Yi-Shi Liu John Ramirez Department.
Center of Excellence for Airport Technology A Partnership in Research and Outreach with the Federal Aviation Administration and the O’Hare Modernization.
Center of Excellence for Airport Technology A Partnership in Research and Outreach with the O’Hare Modernization Program David Lange University of Illinois.
THE INTRODUCTION AND SUPPORT OF RESEARCH PROJECTS AS PART OF THE FUTURE ROLE OF THE RCARO Dr Waqar Ahmad Dr John Easey.
Presented to: By: Date: Federal Aviation Administration Pavement Projects and Plans ANG-E262 REDAC Jeff Gagnon March 15, 2016.
Presented to: REDAC By: Navneet Garg, Ph.D. Date: March 15, 2016 Federal Aviation Administration RPA P2: National Airport Pavement & Materials Research.
AIRPORT SURVEYS.
THE INTRODUCTION AND SUPPORT OF RESEARCH PROJECTS AS PART OF THE FUTURE ROLE OF THE RCARO Dr Waqar Ahmad Dr John Easey.
PRESENTATION TO PUBLIC SECTOR RISK MANAGEMENT FORUM PRESENTED ON BEHALF OF GOVERNMENT CONTINUITY FORUM BY: MR JUSTICE NEPFUMBADA.
PAVEMENTS - DESIGN FIELD SAMPLE
Recycled Glass in Construction and Paving Materials
Chapter 5 Initiating and Planning Systems Development Projects
California Bearing Ratio
Polices, procedures & protocols
COMP390/3/4/5 Final Year Project Introduction & Specification
Chapter 5: Pavement Structure and Base
Supervised by Dr. Sami Hijjawi Prepared by Hamza Saifan
Earthwork operations- are those that involve the earth in its natural form, which need to be undertaken before the actual construction of the pavement.
JTAMS PRE-CDR IT/SIS ANALYSIS
(Additional materials)
Civil Engineering Department An-Najah National University
Effect of Removing the Amelioration Period on Design & Construction of Lime Stabilised Subgrades in Local Government Scott Young BE (Hons), RPEng (Civil),
Business System Development
Structural Design of Highway
Work Plan Management GEO Work Plan Symposium 30 April – 2 May 2012
Center of Excellence for Airport Technology, CEAT
Ohio’s Research Initiative for Locals
Field validation of constructed sub-grade and pavement
Emphasis on Quality Rochester’s City Owner Contract Process
Writing Performance Assessment
Chapter 5 Initiating and Planning Systems Development Projects
PROJECT DELIVERY METHODS
Project management Lecture 9
Academic Growth Model Indicator Update
Portfolio Management Process & Customer Request Management
Chapter 5 Initiating and Planning Systems Development Projects
NRRA Pavement Workshop 2019
Report of the Technical Subcommittee
Roles and Responsibilities
Production EVM Working Group Outbrief May 2010 PMSC
Presentation transcript:

Co-PIs: Erol Tutumluer Marshall R. Thompson RA: Deb Mishra Subgrade Soil Support and Stabilization O’HARE Airport Modernization Research Project Research Progress and Future Tasks – Sept. 21, 2006

Introduction The strength and performance of an airport pavement related to the structural design and the subgrade soil characteristics The strength and performance of an airport pavement related to the structural design and the subgrade soil characteristics This project provides testing and analysis to establish subgrade support and stabilization requirements for O’Hare airport pavements This project provides testing and analysis to establish subgrade support and stabilization requirements for O’Hare airport pavements

Research Objectives Consider/Establish subgrade support and stabilization requirements with respect to: Consider/Establish subgrade support and stabilization requirements with respect to: Need for subgrade stabilization Need for subgrade stabilization Selection of lime and other suitable admixture stabilization considerations Selection of lime and other suitable admixture stabilization considerations Stabilization depth Stabilization depth Estimate “subgrade support” for various combinations of subgrade stabilization treatments and prepared subgrade conditions Estimate “subgrade support” for various combinations of subgrade stabilization treatments and prepared subgrade conditions

A project research paper was presented at the 2006 ASCE Airfield and Highway Pavement Specialty Conference, Atlanta, GA, April 30 – May 3, 2006 A project research paper was presented at the 2006 ASCE Airfield and Highway Pavement Specialty Conference, Atlanta, GA, April 30 – May 3, 2006 Published in the Proceedings book Airfield and Highway Pavements, edited by I.L. Al-Qadi Published in the Proceedings book Airfield and Highway Pavements, edited by I.L. Al-Qadi “Characterizing Subgrade Soils and Establishing Treatment Needs for a New Runway at the Chicago’s O’Hare Airport” by H.S. Brar, E. Tutumluer, M.R. Thompson, L. Gosain, and R. Anderson Progress Made In

On April 5th, 2006, the Co-PIs joined a TEL-CON meeting with the OMP concerning the project findings on subgrade stabilization and additional frost action effects. It was recommended that Dr. Dempsey (a participant in the TEL-CON) conduct a climatic-modelling study of the 9-27 RW. On April 5th, 2006, the Co-PIs joined a TEL-CON meeting with the OMP concerning the project findings on subgrade stabilization and additional frost action effects. It was recommended that Dr. Dempsey (a participant in the TEL-CON) conduct a climatic-modelling study of the 9-27 RW. Both North Runway 9L-27R and South Airfield subgrade soil support and stabilization needs were discussed: Both North Runway 9L-27R and South Airfield subgrade soil support and stabilization needs were discussed: effectiveness of lime stabilization on primarily silty soils with low clay contents (less than 20%), effectiveness of lime stabilization on primarily silty soils with low clay contents (less than 20%), adequate strength gain requirements, adequate strength gain requirements, poor workmanship and inadequate construction quality control, poor workmanship and inadequate construction quality control, construction cut off dates for lime treatment effectiveness, construction cut off dates for lime treatment effectiveness, frost penetration effects, and frost penetration effects, and Cement treatment as an option to include in the construction specifications (and use in certain project locations in case lime treatment becomes unsatisfactory for the primarily silty, low clay contents soils to be encountered during subgrade preparation) Cement treatment as an option to include in the construction specifications (and use in certain project locations in case lime treatment becomes unsatisfactory for the primarily silty, low clay contents soils to be encountered during subgrade preparation) Progress Made In

Marshall Thompson traveled to the OMP office on April 11th and participated in a conference at ORD with OMP staff concerning soil stabilization (lime/cement, frost action effects, and use of fly ash as a stabilization admixture) Marshall Thompson traveled to the OMP office on April 11th and participated in a conference at ORD with OMP staff concerning soil stabilization (lime/cement, frost action effects, and use of fly ash as a stabilization admixture) Erol Tutumluer gave a progress update on July 20 th at the OMP office and found out that fly ash was now used for modification of the North Runway soils Erol Tutumluer gave a progress update on July 20 th at the OMP office and found out that fly ash was now used for modification of the North Runway soils Marshall Thompson traveled to the OMP office on July 28 and participated in a conference with OMP staff and 9-27 Design Staff concerning treatment options for “unstable” subgrades. He participated in the subsequent development of recommendations. Marshall Thompson traveled to the OMP office on July 28 and participated in a conference with OMP staff and 9-27 Design Staff concerning treatment options for “unstable” subgrades. He participated in the subsequent development of recommendations. Progress Made In

Professor Barry Dempsey, a UIUC expert on climatic effects has completed a study of frost penetration and freeze-thaw cycle activity for the various 9-27 pavement configurations. The study considered ORD climatic data for the period 1996 – The report has been published as CEAT TN 26. Professor Barry Dempsey, a UIUC expert on climatic effects has completed a study of frost penetration and freeze-thaw cycle activity for the various 9-27 pavement configurations. The study considered ORD climatic data for the period 1996 – The report has been published as CEAT TN 26. Progress Made In

TECHNICAL NOTES Technical Notes have been prepared and submitted to the OMP throughout the project duration to: Establish the Best Demonstrated Available Technology (BDAT) for subgrade soil evaluation and stabilization Establish the Best Demonstrated Available Technology (BDAT) for subgrade soil evaluation and stabilization Communicate specific findings and recommendations to OMP Communicate specific findings and recommendations to OMPengineers TN5: K-150 Considerations for RW 9-27 TN5: K-150 Considerations for RW 9-27 TN6: Subgrade Strength/Stiffness Evaluation TN6: Subgrade Strength/Stiffness Evaluation TN7: “Working Platform” Requirements for Pavement Construction TN7: “Working Platform” Requirements for Pavement Construction TN8: Subgrade Stability Manual (IDOT) TN8: Subgrade Stability Manual (IDOT) TN13: Moisture Limitations for Lime Stabilization TN13: Moisture Limitations for Lime Stabilization TN14: Admixture Stabilization (Lime Treatment of Subgrades) TN14: Admixture Stabilization (Lime Treatment of Subgrades) TN19: Progress Report on Laboratory Soil Test Results TN19: Progress Report on Laboratory Soil Test Results (March 2006) (March 2006)

DEMPSEY STUDY FINDINGS

TOTAL PVT THICKNESS – 40 INCHES

FROST LINE 46 INCHES 9-27 PAVEMENT

DATEFROST DEPTH (INCHES) DATEFROST DEPTH (INCHES ) AVERAGE 39 INS 9-27 PAVEMENT SECTION

FY 07 Year 3 Project Tasks

Task 1: Cooperate with OMP in the reviewing (and modifying if appropriate) Section P-152 (Excavation and Embankment) and Section P-159 (Lime Modified Soils) or Fly Ash Modified Soil Specs? Experiences (problems/successes) from the current 9-27 contract should be considered Experiences (problems/successes) from the current 9-27 contract should be considered The “modified” versions should be included in future contracts The “modified” versions should be included in future contracts

FY 07 Year 3 Project Tasks Task 2: Cooperate with OMP in the reviewing and modifying Section P-158 (Lime Stabilized Subgrade) for inclusion in the upcoming paving contract Current version cites “latest edition” of IDOT Specs. Should reference the IDOT 2002 version Current version cites “latest edition” of IDOT Specs. Should reference the IDOT 2002 version Modify Spec. (as needed) to include cement as a possible admixture Modify Spec. (as needed) to include cement as a possible admixture Incorporate frost action and freeze-thaw potentials from Dempsey’s study (TN 26) as guidelines Incorporate frost action and freeze-thaw potentials from Dempsey’s study (TN 26) as guidelines Will construction be permitted outside the current April 15 – Sept 15 window? Will construction be permitted outside the current April 15 – Sept 15 window? Other issues?? Other issues??

FY 07 Year 3 Project Tasks Task 3: Evaluate the 9L-27R runway/taxiway soil lime stabilization and (fly ash) modification for meeting the subgrade support (k-value) requirements The research team will support the activities of OMP in: * Characterizing finish grade elevation for “stabilization admixture selection.” * Characterizing finish grade elevation for “stabilization admixture selection.” * Evaluating completed modification/stabilization effort. * Evaluating completed modification/stabilization effort. * Field Validation of completed pavement structure. * Field Validation of completed pavement structure.

FY 07 Year 3 Project Tasks Task 4: Evaluate currently available geotechnical/subgrade data for the South Airfield of the O’Hare Airport with particular emphasis on the stockpiled soils Summarize technology and experiences from North Runway (9-27) and apply to the South Airfield Summarize technology and experiences from North Runway (9-27) and apply to the South Airfield Advise on the soil sampling needs and if considered essential, develop recommendations for additional soil exploration/sampling activities Advise on the soil sampling needs and if considered essential, develop recommendations for additional soil exploration/sampling activities Develop/conduct a laboratory testing program for soil treatment and subgrade support for the South Airfield Develop/conduct a laboratory testing program for soil treatment and subgrade support for the South Airfield

Project Schedule & Deliverables Technical Notes will be prepared and submitted to the OMP throughout the duration of this project to communicate specific findings and recommendations to OMP engineers as needed Technical Notes will be prepared and submitted to the OMP throughout the duration of this project to communicate specific findings and recommendations to OMP engineers as needed Several of the Project Tasks are already pursued simultaneously, and the specific delivery of results will be contingent upon availability of OMP data and other factors that depend on coordination with OMP Several of the Project Tasks are already pursued simultaneously, and the specific delivery of results will be contingent upon availability of OMP data and other factors that depend on coordination with OMP Continue to work with OMP on current and future subgrade soil support and stabilization needs for all O’Hare runways/taxiways. This will be in the form of sustained support for working with OMP on subgrade soil support issues Continue to work with OMP on current and future subgrade soil support and stabilization needs for all O’Hare runways/taxiways. This will be in the form of sustained support for working with OMP on subgrade soil support issues

Any Questions?