TOWER A Bldg. As of July 21,2009 SCHEDULED ACCOMPLISHMENT21.79% ACTUAL ACCOMPLISHMENT29.46% VARIANCE+7.67% SUMMARY OF ACCOMPLISHMENTS PROJECT DURATION.

Slides:



Advertisements
Similar presentations
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 4 Standard CPM Smoke and Mirror Tricks (Manipulations)
Advertisements

366,84 m2 114,09 m2 220,84 m262,34 m2 Renaissance Premium have 2 underground parking floors which let 66 cars to park safely. 1 st Floor Bank Cafe Renaissance.
Prof Awad S. Hanna Concrete Structures Concrete Structures.
We are reviewing Chapt. 1&2 and we assigned Chapt. 3 & 4 for
Pre-stressed Steel System Post Tensioned Slab Case Study: K- Financial Tower.
NEW TOWN HEIGHTS DLF – KAKKANAD WORK PROGRESS REPORT FOR THE MONTH OF MAY 2011 Click to proceed……..
Hargrave Street Pumpstation – Site Preparation July 2014.
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
Work Breakdown Structure –Early compilation of significant work items w/ associated cost and schedule considerations –Overview of project –First look.
Bar joist over kitchen and band room. Setting bar joist over kitchen and electrical/mechanical rooms.
Microsoft Office Project 2007: Managing Projects.
School of the Built Environment Construction Technology D19SC Unit 4 SUBSTRUCTURE DESIGN – WALLS FLOORS & BASEMENTS 1 Unit 4 SUBSTRUCTURE DESIGN - FLOORS,
USING MS PROJECT 2010 Project management software programs such as Microsoft Project 2010 can be used for developing the project schedule and budget, and.
Dividing with Base Ten Blocks. Ex # 1 23  3 Finding how many subsets – repeated subtraction 23 is 2 longs and 3 units. There are no 3’s in 2 longs, so.
Barton St Peter’s Advent Calendar.
Bethesda Triangle Brian Groark Construction Management Faculty Consultant: Dr. Messner.
Project Title: CONSTRUCTION OF SCIENCE & TECHNOLOGY BLDG. (Ph. 1) Approved Budget for the Contract (ABC): Php 26,102, (Ph. 1) Source of Funds:Fund.
Applying Stochastic Linear Scheduling Method to Pipeline Construction
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
Construction Project Management Prepared By: Omar Al-Taher Supervised By: Dr Baraq Jum’aa.
Price List, Payment Plan of Wellington Heights No. of Floors9 No. of Towers3 CATEGORYSIZE(APPROX) 2 BHK1160Sq. ft. 3 BHK1804.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Major projects carried out by Design cell ( July 2015 ) 12/22/20151Design cell IIT,Bombay Aug 2015.
North Augusta High School Design Development Presentation.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
- LESS CONST. BUDGET - PREMIUM QUALITY - SHORT CONST. PERIOD - RELIABLE SAFETY - NO CRANE REQUIRED - LIGHT & EASY INSTALL Clear AccessManual Transfer Simple.
Newton’s 2 nd Law Example with Angles! Consider a box of mass m being pulled across a rough horizontal floor with an applied force F A at 35 °. The coefficient.
Time Remaining 20:00.
WBS Work Breakdown Structure © Unitec New Zealand.
1BED & 2 BED APARTMENTS – TOTAL 40 UNITS TOP FLOOR BRICK WORK IN PROGRESS.
PROJECT STATUS REPORT C-E CONSTRUCTION CORPORATION CONTRACTORS: S & H Electrical Construction Corporation CDC REALTY, INC.
WEST DES MOINES LIBRARY ADDITION Team North Final Presentation Team North The Ace Mentor Program career direction for students in architecture,
Schedule Control (Earned Value)
Temporary Works – P8 Project Practice.
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
ACCOMPLISHMENT REPORT AS OF NOV. 30, 2013
BATTLE STAFF NCO COURSE
AARNA Progress Report-January 2017
Inspire Elementary School
Construction Project Management
Construction Project Management
“Planning and Scheduling a SIMPLIFIED Construction Project” BCT458 September 27, 2009 Group Signatures Taggart.
Midland Senior High School Second Floor
Online Gifts Buy for wishes happy mother's day to yours choice and with happy gifts find here:
Awarding Criterion for late tender: the lowest bid- why?
Problem solving.
Key Dates-Odd Days April 26th-Lottery April 28th-Draft & Work Day
Concrete Structures DR. Nabil Dmaidi.
Weather and Contingency Allowance
Concrete Placement, Level, Flatness Control and Testing Methods.
Carleton College Summer 2018 Science and Campus Construction Plan
فرآيند كنترل پروژه.
Arch205 building construction floor & Roof systems
Building Frame (Column & Beam)
Presenter Tony Bosnich 2015
Grade one First term Second term Learning unit Learning unit
Pier Foundations Piers Suspended floor Ground beam Next slide.
Caddo Mills High School 8 PERIOD BELL SCHEDULE 2017 – 2018
High Frequency Words The First 100
In-Class Scheduling Exercise
LINEAR BALANCE METHOD & MATRIX SCHEDULE
North Augusta High School – Phase 2A and 2B
6th. Semester Schedule: 1st. Week
WHS Bell Schedule 1st Period  7:30 – 8:30 2nd Period  8:35 – 9:30
Timekeeper t OVER (Time lapse display Lecture Discussion
Equity Diversity & Inclusion Grant Midterm Project Status Report
The New Leavelle McCampbell Middle School
MKCG MEDICAL COLLEGE & HOSPITAL, BEHRAMPUR, ODISHA
CHAPTER ONE: RESOURCE ALLOCATION AND SCHEDULING
Presentation transcript:

TOWER A Bldg.

As of July 21,2009 SCHEDULED ACCOMPLISHMENT21.79% ACTUAL ACCOMPLISHMENT29.46% VARIANCE+7.67% SUMMARY OF ACCOMPLISHMENTS PROJECT DURATION 423 Calendar Days NUMBER OF DAYS LAPSED191 Calendar Days NUMBER OF DAYS REMAINING248 Calendar Days PROJECTED ACCOMPLISHMENT21.79% ACTUAL ACCOMPLISHMENT29.46% VARIANCE+7.67%

GROUND FLR RIGHT WING AREAGROUND FLR. LEFT WING AREA RETOUCHING AND FINISHING

2 nd FLOOR LEVEL LEFT WING AREA 2 nd FLOOR LEVEL RIGHT WING AREA RETOUCHING AND FINISHING

3 rd FLOOR LEVEL RIGHT WING AREA3 rd FLOOR LEVEL LEFT WING AREA RETOUCHING AND FINISHING

4 th FLOOR RIGHT WING AREA4 th FLOOR LEFT WING AREA RETOUCHING AND FINISHING, PILING OF CHB 4” AND 6”

5 th FLOOR LEFT WING AREA 5 th FLOOR RIGHT WING AREA, PILING OF CHB 4” AND 6”

6 th FLR. LEFT WING AREA: 6 th FLR. RIGHT WING AREA CLEARING OF FORMWORKS

7 th FLR. RIGHT WING AREA7 th FLR. LEFT WING AREA CLEARING OF FORMWORKS

8 TH FLR. LEFT WING AREA8 TH FLR. RIGHT WING AREA CLEARING OF FORMWORKS

9 TH FLR. LEFT WING AREA 9 TH FLR. RIGHT WING AREA SHORING AND FORMWORKS FOR 10 TH FLOOR

10 TH FLR. LEFT WING AREA: CONCRETED SUSPENDED SLAB 10 TH FLR. RIGHT WING AREA: FORMWORKS FOR SLAB AND ROUGHING- INS