ICEE Internship International Center for Engineering Education Project: Virtual Reality Environment of a Building Construction Timeline By: Marc Brana.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
A PROJECT MANAGEMENT OVERVIEW Maritime Place PMI EMERALD COAST FLORIDA CHAPTER JANUARY 21, 2014.
Welcome to the CY Middle School virtual tour! Click here for pictures of the main floor. Click here for pictures of the second floor.
SHEPHERD ELEMENTARY SCHOOL PHASE I SHEPHERD ELEMENTARY SCHOOL PHASE I SITE PLAN.
Finance and Administration Advisory Group June 30, 2010.
New Media, Continuing Debate Presented By: By: By: Web Address: http/ Topic Number: Topic Number:
David Janzen Software Engineering II – Scratch Thursday, July 9, 2009.
Central Plant Solano Nursing Sim Lab Student Union Decision Center Construction Plan Summer 2008 Bell Tower Crawl Space Data Center Upgrade.
Blue Prints.
Cen Li / EDP Undergraduate Capstone. Timeline Week1-2: Capstone Project Proposal and Script Week3-4: World Map Drawing and Characters Drawing Week5-6:
Industrial Technology CAD I (Mechanical Design) CAD II (Architectural Design) Electronic Communications Technology Modules.
Proposed Research and Development Activities Advanced Integrated Building Information Modeling Prepared for: US Army Corp of Engineers Architect & Urban.
Virtual Reality in Construction Cost Estimating By Mandy Frazure Advisors: Dr. Tulio Sulbaran Prof. Doris Kemp Prof. Doris Kemp Dr. Shelton Houston Dr.
MOOSE JAW, SASKATCHEWAN
Unit 12 LO3 Be able to design websites
Schacht aslani architects P ENINSULA C OLLEGE library media center faculty administration building 100% Design Development 28 February 2006.
Proposed Research and Development Activities Advanced Integrated Building Information Modeling Prepared for: US Army Corp of Engineers Architect & Urban.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Building Plans.
URL://icee.usm.eduURL://icee.usm.edu Phone: (601) 266 Virtual Reality Walkthrough of ICEE Lab Justin Nosser Project.
Williamson County Expo Center: Site Plan Warmup Arena Renovated Arena Expo Hall and Space.
INSERT IMAGE TO ILLUSTRATE THE PROJECT OVERVIEW Project Description: Include a short narrative to explain the background to the project including any information.
Draft-linsner-geopriv- relativeloc-01 Marc Linsner Cisco.
Virtual Reality Environment of a Building Construction Timeline Marc Brana Project Advisors: Dr. Tulio Sulbaran Prof. Bill Crosby Prof. Doris Kemp.
Ilkka Nurmi. Contents: History1 3D-modeling2 Construction industry models3,4 Publishing medias5 Software6 Pros7 Cons8 The Future?9 Companies10 Summary11.
HOUSING AUTHORITY Kathleen Millar. Floor Plan- level 1.
URL://icee.usm.eduURL://icee.usm.edu Phone: (601) 266 Enhancing ICCE Website Using Flash MX 2004 Kimberly Black Project.
California State University, Sacramento Facilities Services May 19, 2008.
North Augusta High School Design Development Presentation.
Copyright of Transcend Technical and Engineering Services (P) Ltd. ARCHITECTURAL DOCUMENTATION PORTFOLIO.
ICEE Internship International Center for Engineering Education Project: Natural Language Interaction with a Construction Estimating Virtual Reality Environment.
SEDONA RED ROCK HIGH SCHOOL October 9, 2008 SCHEMATIC DESIGN – PHASE 2.
ELib Technical Issues Concertation Day: Mobile Code and VRML Brian Kelly UK Web Focus UKOLN, University of Bath, Bath
AHS+Associates Final Project Name Here Final Project Architect – Your Name Put your favorite drawing, sketch, photo, etc. of your project here.
VIRTUAL REALITY (VR) INTRODUCTION AND BASIC APPLICATIONS الواقع الافتراضي : مقدمة وتطبيقات Dr. Naji Shukri Alzaza Assist. Prof. of Mobile technology Dean.
Padgett & Freeman Architects, PA Architecture Planning Interiors April 5th, 2010 Haywood County North Carolina “Through collaborative processes, to create.
AHS+Associates Principles of Architecture & Construction Grades: 9-12 Credit: 1 Elective Description: Provides an overview to the various fields of architecture,
UNIVERSITY OF KENTUCKY ALUMNI CENTER STUDY 10 March 2015.
CRIM 493.  An academic course focused on experiential learning  An opportunity to gain valuable experience in a “real world” work environment  Students.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
OHLONE ELEMENTARY SCHOOL, HERCULES CONSTRUCTION PROGRESS REPORT WCCUSD FACILITY SUB-COMMITTEE MEETING AUG. 14, 2012 POWELL & PARTNERS, ARCHITECTS.
URL://icee.usm.eduURL://icee.usm.edu Phone: (601) 266 A Construction Engineering Scheduling Simulation through the.
MASTER PLAN UPDATE February 15, 2017.
Computer-Aided Design (CAD)
Internship CRIM 493.
Physical Features North Africa GOVERNMENT RELIGION RESOURCES
Multipurpose Cultural Center
Drawing & Building Names
Inspire Elementary School
State of the art We still have problem using 3D – There are no standard of how to make the modelling, so we can’t benefit from each other. There are not.
Architecture Pathway at NISD
Virtual Reality Walkthrough of ICEE Lab
Graduation Project 2 Redesigning a Villa
Construction Drawings
Board of Trustees Meeting
Instructor: C. Koutsougeras
COMPASS DIRECTIONS (page ).
Thatch House (Plan) Fig.4.
Technical Graphics Date:21/10/13 By Dean McEvoy, Rang Conlon.
ICEE Internship International Center for Engineering Education
WESLEYAN P-42-1 WEST ELEVATION MAJOR MAINTENANCE FY HOME AVENUE
Scaled Drawings 7.07 Execute Scaled Drawings
Date 5 November 2017, afternoon, Nor West wind direction,
University Center 517 University Center North: Inaccessible Element
Mathematics Unit 45: Twisted Building
North Augusta High School – Phase 2A and 2B
Student Center A South: Inaccessible Element
– Graphics and Visualization
Site and Context. Section from East Section E2 Section E1 Sannidhanam Malikapuram Sannidhanam Malikapuram.
Presentation transcript:

ICEE Internship International Center for Engineering Education Project: Virtual Reality Environment of a Building Construction Timeline By: Marc Brana Project Supervisor: Dr. Tulio Sulbaran Date: July 14, 2003

Marc Brana Intern for ICEEIntern for ICEE Summer 2003 to Fall 2003Summer 2003 to Fall 2003 Software Engineering MajorSoftware Engineering Major Minor in Architecture TechnologyMinor in Architecture Technology

Over View ► Project  Description ► Project Specs.  Application  Technologies Used

Project Description ► Virtual Reality Environment of a Building Construction Timeline is an animation of the construction process of the building. This project has two phases:  Phase 1: Navigational Virtual Environment of the Building with the use of VRML technology  Phase 2: Interactive building construction timeline. ► The building chosen for this project is The International Center of USM, currently under construction.

International Center of USM ► Designed by:  Dean and Associates Architect P.A. ► Constructed by:  Finlo Construction Co.

International Center of USM ► Site Plan:

International Center of USM ► North Elevation

International Center of USM ► South Elevation

International Center of USM ► East Elevation

International Center of USM ► West Elevation

International Center of USM ► Ground Floor Plan

International Center of USM ► Ground Floor Plan

Project Application ► The virtual reality environment will present as a design aid to those individuals that do not have the technical knowledge of architectural drawings. ► This project is focused on showing the construction timeline of a building.

Technologies Used ► Modeling  AutoDesk Architecture Desktop 3.3 ► Animation  AutoDesk VIZ 4 ► Textures  Photoshop 7.0 ► 3D  VRML

Technologies Used ► End of Presentation