Status of Mechanical Design of LEBT Rich Andrews, Matt Alvarez, Tim Hamerla, Danny Snee.

Slides:



Advertisements
Similar presentations
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
Advertisements

M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
TCDI operation until LS2 LIU-SPS-to-LHC Transfer Line Protection Devices (TCDI) Review 1 Oliver Aberle 26/03/2014 O. Aberle (EN-STI-TCD)
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Developments of the FETS Ion Source Scott Lawrie.
Ch. Vuitton – BE/BI Presented by R. Veness – BE/BI 18th October
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
FETS-HINS Videoconference 23rd Feb 2007 FETS Mechanical Design Issues by J. Pozimski On behalf of P. Savage.
NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
PXIE Ion Source and LEBT Installation Status L. Prost, B. Hanna, R. Andrews Project X Technical Meeting October 29 th, 2013.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
PXIE LEBT Status Update Lionel Prost PIP-II “Friday” Meeting January 16 th, 2015.
RFQ Installation Status 10/27/2015 October 27, 2015 Jim Steimel & Curtis Baffes.
PIP-II R&D Program PXIE Ion source and LEBT Lionel Prost PIP-II Machine Advisory Committee Meeting March 2016.
PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016.
RFQ Installation Plan PIP-II Meeting, 14-July-2015 C. Baffes for R. Andrews, A. Chen, Y. Czajkowski, S. Kazakov, R. Pasquinelli, D. Peterson, O. Pronitchev,
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Warm Front End Concept A. Shemyakin PIP-II Machine Advisory Committee 9-11 March 2015.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
D. Li, Project X Collaboration Meeting, Fermilab (October 25-27, 2011) Overview of Project X Frond-End R&D at LBNL Derun Li Project X Collaboration Meeting.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
ESS Front End diagnostic
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
PXIE Ion Source & LEBT Commissioning Update Lionel Prost on behalf of A. Shemyakin, R. Andrews, B. Brooker, K. Carlson, J. Czajkowski, R. D’Arcy, B. Hanna,
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
Ion Source and LEBT Statuses L. Prost (with many contributions from others) Project X Technical Meeting July 3, 2012.
LEReC System 1. LEReC Injection section 2016 CeC Beam Dump 45°dipole (CeC) Profile Monitor (ERL HE) No SRF Cavity DC e - Gun ERL Solenoid ERL Halo Monitors.
Completion of the MICE-US construction project
BSS Prep work at CERN and Acceptance of Parts
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
F.E.T.S. Mechanical Engineering Update
Teleconference ACS – FREIA 10th May 2017
C50 Cavity pair Assembly Changes
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
UITF beamline installation
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Hall C SHMS & Configuration Status
Injector / Linac Installation Current Status
Prototype cryomodule development
(WBS ) Alan Wootton, LLNL April 24, 2002
ISRC and LEBT Vacuum System Design
Mechanical Engineering progress for the Front End Test Stand
MEBT FC, WS, SC and EMU Status
LEBT water cooling system
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
Front End Test Stand (F.E.T.S.) Engineering Progress Report
Hall C SHMS & Configuration Status
UITF beamline installation
SC1R Cold Box PDR Assembly Sequence
Procedure for MEBT installation in the accelerator tunnel at ESS
Presentation transcript:

Status of Mechanical Design of LEBT Rich Andrews, Matt Alvarez, Tim Hamerla, Danny Snee

LEBT Evolution Current Configuration – Ion Source – Solenoid (w/ Isolated Diaphragm) – DCCT – Donut – Faraday Cup Phase 2 – All of the above components – Emittance Scanner (in several positions) Phase 3 – All of the Phase 2 components – Solenoids 2 and 3 (with Isolated Diaphragms) – Chopper – Toroid Final Configuration – All of the above components – Scraper – RFQ Transition 2

Existing Configuration 3

Thursday Shutdown Install a window in the Ion Source: – All materials on hand: flange w/ glass window and leaded glass to cover it & clamps to hold it 4 Install a diaphragm to protect the bellows: – All parts in house, cleaned and stored at CMTF Beam Direction

Phase 2 5 All support and adjusters are manufactured and in house

Emittance Scanner Status (from Matt Alvarez) Emittance Scanner Timeline – Integrating motor, potentiometer, and limit switches into software (1-week) – Verify the HV plates are working properly (1 wk.) – In vacuum cables arrive – Bake emittance scanner graphite foils (1- week) Finalize assembly D-Pace Box timeline (most work can be done concurrently) – Leak check upstream and downstream flanges (1-week) – Attain Turbo pump from HINS (1-day) – Leak check emittance scanner spool piece and install it on the D-pace box (2-days) – Install emittance scanner into D-pace box and perform a final leak check (2-days) D-pace Box Installation Summary – Pre-installation – Transport assembly to CMTF – Align D-pace box using reference made by Alignment – Install Turbo pump and Faraday cup – Make up vacuum connections on D-pace box. – Pump down and leak check 6

LEBT Phase 3+ (one of the possible configurations) 7

Phase 3 evolving 8 Solenoid Stand procured CMTF (solenoid support and adjusters also in-house) IB-1 for field measurements (all solenoids in-house, Alignment work complete)

Chopper & Toroid Status Chopper – Vacuum pumping needs Requires about 1000 l/s pumping capacity This may impact space requirements – Feedthroughs are specified – Standoff requirements determined – TZM Needs to be procured Toroid – This device is in house and selected by the Instrumentation Dept. – We may have the required ceramic in-house 9

Completion Plan 10 AprilMayJuneJulyAugSepOctNovDec Chopper and Toroid DesignManufactureInstall Emittance Scanner ScannerBoxInstall Accelerator ShutdownPreparation for Machine RFQ EndplatesTO LBNL