January 13, 2009 Tampa, Florida.  Add pollutants: PM2.5, CPM, NH3, TBAC  Expand summer season data requirements to the entire state  Lower hazardous.

Slides:



Advertisements
Similar presentations
1 SUBCHAPTER 21 EMISSION STATEMENTS Rule Revisions and Program Update.
Advertisements

METAL COIL SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART SSSS May CFR PART 63, SUBPART SSSS May 2006.
METAL CAN SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART KKKK June CFR PART 63, SUBPART KKKK June 2006.
DRAFT IRON & STEEL FOUNDRY MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART EEEEE.
METAL FURNITURE SURFACE COATING MACT COMPLIANCE ASSURANCE
METAL COIL SURFACE MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART SSSS May 2006 May 2006.
Florida Department of Environmental Protection Hospital/Medical/Infectious Waste Incinerators (HMIWI) Tiffany Miesel & John Glunn Florida DEP, Division.
Welcome 2014 Triennial Emissions Inventory Workshop.
Regulatory Drivers for Reducing Solvent Emissions Barbara Johnson, PE Kansas State University Kansas Small Business Environmental Assistance Program March.
Tuesday Oct. 7, 2014 Implementation of Permit Exemption Criteria Category No. 38 Tom Corbett, Governor Dana Aunkst, Acting Secretary.
New Emission Rules for IC Engines Presented by Scott Wallace Devon Gas Services, L.P.
SCAQMD Boiler Rules Rule – Emissions of Oxides of Nitrogen from Large Water Heaters and Small Boilers March 22, 2006.
1 Katy R. Forney Energy Sector Technical Authority Air Permits Section EPA Region 4 PSD and Title V Greenhouse Gas Tailoring Rule 14 th Annual Power Generation.
NCMA Workshop March 19 and 24, 2015 Betty Gatano, P.E. Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919)
Managing Air Quality Data 101 Presented by: Chris Bellusci & Claire Lund, PE (Sanborn Head) International Conference for Environmental.
1 PSD - Case #1 Case #1: –A simple cycle natural gas power plant with PTE NOx of 300 tpy and GHGs of 150,000 tpy CO2e receives a PSD permit addressing.
Tribal Minor New Source Review Registrations Kaushal Gupta, Environmental Engineer, Air Permits Section USEPA Region 5 Air & Radiation Division Tribal.
Indiana New Source Review Reform Plantwide Applicability Limitations (PALs) IDEM/Office of Air Quality September 7, 2004.
2005 Air Emissions Inventory Criteria and Hazardous Air Pollutants Inventory Southern Ute Indian Reservation, Colorado Presented by : Brenda Sakizzie,
Air Quality 101 Kansas Air Quality Program overview.
| Philadelphia | Atlanta | Houston | Washington DC SO 2 Data Requirements Rule – A Proactive Compliance Approach Mark Wenclawiak, CCM |
Guidance on Establishing Monitoring to Comply with CAM and Other Title V Requirements A Summary of Technical and Policy Materials Barrett Parker, EPA,
STATEWIDE WORKSHOP ON THE CALIFORNIA MOTOR VEHICLE EMISSIONS STANDARDS INCLUDING GREENHOUSE GASES August 23, 2007 Department of Environmental Protection.
National Ambient Air Quality Standards and Current Status of Air Quality Laura Boothe North Carolina Division of Air Quality MCIC Workshops March 2012.
Greenhouse Gas (GHG) Permit Training Other Aspects of PSD Title V Permitting.
Emissions Calculations 101 Tim Trumbull Iowa Air Emissions Assistance Program Iowa Waste Reduction Center University of Northern Iowa.
International Collaboration on PRTRs: Canadian experiences TRI National Meeting February 12-13, 2008 Jody Rosenberger Environment Canada.
Greenhouse Gas (GHG) Permit Training PSD Applicability Example Landfill Applicability Examples John Calcagni, EPA Region 4.
Final Clean Air Fine Particle Implementation Rule Briefing for NTAA EPA Office of Air Quality Planning and Standards April 17, 2007.
1 Non-Attainment NSR Program Donald Law EPA Region 8.
New Source Review Rules Update Jessica Montanez U.S. Environmental Protection Agency Office of Air Quality Planning and Standards Air Quality Policy Division.
Best Available Retrofit Technology (BART) Process November 15, 2006 Eric C. Massey, Manager Air Quality Compliance Section.
1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section.
1 Addressing Air Quality Impacts from Oil and Gas Development in Colorado WESTAR Conference October 23, 2008 Rose Waldman Colorado Air Pollution Control.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
1 Draft Landfill Methane Control Measure California Air Resources Board April 22, 2008.
2012 Emissions Inventory Workshop 1. 2  The owner or operator of any facility that is a source of air contaminants shall submit a complete emission.
VISTAS Use of CEM Data and CEM Cross-Referencing Activities Presented by: Gregory Stella VISTAS Technical Advisor – Emission Inventories Alpine Geophysics,
NAAQS Status in GA & PSD Inventory Update James W. Boylan Georgia EPD – Air Protection Branch Manager, Planning & Support Program AWMA Regulatory Update.
1 Update on New Source Review (NSR) Activities and Priorities for Information Transfer and Program Integration Division April 7, 2004.
Proposed Rulemaking: Additional RACT Requirements for Major Sources of NO x and VOCs (25 Pa. Code Chapters 121 and 129) Environmental Quality Board November.
RACT 2 – Source Testing and Monitoring Requirements Air Quality Technical Advisory Committee August 4, 2016 Harrisburg, PA Tom Wolf, GovernorPatrick McDonnell,
1 Emissions Inventory Overview–Part 1 Melinda Ronca-Battista, ITEP.
T. Higgs May 25, 2017 AESA Stack Testing Seminar
Complying with Periodic Emissions Monitoring Requirements
VISTAS Use of CEM Data and CEM Cross-Referencing Activities
Environmental Specialist
Clean Air Act Glossary.
PM 2.5 Attainment Re-designation Approvals
Methane Emission Standards for Crude Oil and Natural Gas Facilities
What is the Boiler NESHAP?
WHAT YOU NEED TO KNOW ABOUT FINANCIAL ASSURANCE
Common Control Self-Declaration form
Overview of New Source Review (NSR)
Georgia Air Regulatory Update
Department of Environmental Quality
Boiler Sheltered Initiative
        CALCULATING THE MATURITY DATE 1 2 CALCULATING INTEREST
Enforcing the NAAQS Case Study Sean Taylor
PM2.5 NSR and Designations
Kansas Air Quality Seminar March 5, 2008
Major New Source Review (NSR)—Part 1
Air Quality Committee May 13, 2015
Air Quality Permitting Guidelines for Industrial Sources
Pinal County Air Quality Workshop
Navajo Nation Minor Source Regulations
WRAP Stationary Sources Forum Meeting November 14-15, 2006
Uinta Basin General Conformity
ISG – Emission statements Update
Regional Modeling for Stationary Source Control Strategy Evaluation
Presentation transcript:

January 13, 2009 Tampa, Florida

 Add pollutants: PM2.5, CPM, NH3, TBAC  Expand summer season data requirements to the entire state  Lower hazardous air pollutant (HAP) reporting thresholds  Change HAP reporting frequency to every 3 years  Include the emissions computation and reporting requirements in Rule  Change due date for 2008 AOR to May 1, 2009  Add report contact

 Ozone season reporting  Hazardous air pollutant reporting  Condensible emissions reporting  Fugitive emissions reporting  Emissions calculation hierarchy  AOR submission due date

 Applies statewide (new)  Only for VOC or NOx emitting units  Summer Season (June 1 – August 31)  Average or typical work day (lbs/day) value (only report VOC and NOx)

 Threshold change (new) – 1000 lbs actual/SCC ◦ Applies to all HAPs at major facilities (i.e., total HAPs emissions >25 tpy PTE) ◦ Applies to individual HAPs with emissions >10 tpy PTE). ◦ Reporting every 3 years; 2008, 2011, etc.  Any HAP for which a permit limit is imposed must be reported every year, even if below 1000 lbs

 New requirement  Threshold – 5 tpy, reported annually  Reported only if information is available to estimate emissions  However, because data is limited, and questions remain on the accuracy of test methods, for the 2008 reporting year only report if you are confident in the data, or if you have a permit limit.  In fact, if CPM is subject to a permit limit, it must be reported (even if below 5 tpy)  Do not list CPM as a pollutant if no data can be reported.

 Must report if: ◦ Associated with a permitted emissions unit and SCC for which all emissions are fugitive and are quantifiable (landfill, cooling pond, etc.) ◦ Associated with a permitted facility for which an “emissions unit” has been established by the permitting authority to represent facility-wide fugitive emissions (e.g., equipment leaks, maintenance painting) ◦ Associated with a controlled process using a collection system for which some emissions are not captured and for which the permitting authority has established a separate reporting emissions unit for this purpose.

 Fugitive PM emissions from vehicular movement or wind erosion need not be reported unless required by permit.

Method Emissions Method Code 1. CEMS 2. Materials balance 3. Emission factor- site specific (stack test) 4. Emission factor- directly applicable from published source (e.g., AP-42) 5. Emission factor- similar, but different process from published source (e.g., AP-42) 6. Emissions factor- other 1. 1A A 4. 3B

 For 2008 AOR due to May 1, 2009  For 2009, and thereafter, due by April 1of following year  Issue: Title V permit specifies March 1 due date, thus, if submitted after this date, would technically be out of compliance.  Resolution: Will resolve by guidance or Statement of Compliance form change.

Tom Rogers Florida DEP (850)