WIDAR Correlator Options and Potential Craig Walker NRAO Socorro U.S. VLBI Technical Coordination Meeting May 14-15, 2007.

Slides:



Advertisements
Similar presentations
1 National Radio Astronomy Observatory The EVLA -- Status, Future Rick Perley National Radio Astronomy Observatory.
Advertisements

National Radio Astronomy Observatory June 13/14, 2005 EVLA Phase II Proposal Review EVLA Phase II Computing Development Bryan Butler (EVLA System Engineer.
Signal Processing for Aperture Arrays. AAVS1 256 antenna elements distributed over –4 stations –64 elements each.
Ninth Synthesis Imaging Summer School Socorro, June 15-22, 2004 Cross Correlators Walter Brisken.
2000/9/ jdr1 VLBA Upgrade: Scientific, Observational, and Technical Requirements Jonathan D. Romney NRAO, Socorro NRAO Long-Range Planning Retreat.
The Prototype Correlator Sonja Vrcic Socorro, 5. December, 2006.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
EVLA Correlator P. Dewdney Dominion Radio Astrophysical Observatory Herzberg Institute of Astrophysics National Research Council Canada.
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
Update on LBA Technical Developments CASS Chris Phillips 11 October 2013.
VLBA Sensitivity Upgrade Project Status Jon Romney NRAO, Socorro 7 th US VLBI Technical Coordination Meeting Haystack Observatory 2009 November 3–4.
Eleventh Synthesis Imaging Workshop Socorro, June 10-17, 2008 THE VLBA SENSITIVITY UPGRADE Craig Walker, NRAO.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
Nov 3, 2009 RN - 1 Jet Propulsion Laboratory California Institute of Technology Current Developments for VLBI Data Acquisition Equipment at JPL Robert.
EVLA Transition to Science Operations: An Overview EVLA Advisory Committee Meeting, March 19-20, 2009 Bob Dickman AD, NM Operations.
Answers from the Working Group on AGN and jets G. Moellenbrock, J. Romney, H. Schmitt, V. Altunin, J. Anderson, K. Kellermann, D. Jones, J. Machalski,
Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Correlator.
Tenth Synthesis Imaging Summer School UNM, June 13-20, 2006 Cross Correlators Walter Brisken.
Configuration Mapper Sonja Vrcic Socorro,
VLBA Implementation of the ROACH Digital Backend Jonathan Romney on behalf of the VLBA Upgrade development team NRAO / Socorro First International VLBI.
New Technologies for Future VLBI Correlators B. Carlson High Res. Astronomy, June 8-12, 2003 Socorro NM.
03/6/121 Using the VLBA for Spacecraft Navigation Jonathan Romney National Radio Astronomy Observatory VLBA 10 th Anniversary 2003 June 9 – 12.
Overview of New Connectivity Scheme for the EVLA Correlator B. Carlson July 31, 2007.
M.P. RupenEVLA Advisory Committee Meeting September 6-7, Correlator Test Plan Michael P. Rupen.
M.P. RupenCorrelator Connectivity Scheme Review 31 July Correlator Specifications Michael P. Rupen.
M.P. RupenCorrelator Connectivity Scheme Review 31 July Scientific Impact Michael P. Rupen.
R. HaywardEVLA Feeds CDR – Project Budget & Schedule 17 Feb EVLA Feeds CDR Project Schedule & Budget.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
M.P. Rupen, Synthesis Imaging Summer School, 18 June Cross Correlators Michael P. Rupen NRAO/Socorro.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
2007 / 5 / 141 VLBA Requirements, Plans & Status Jon Romney NRAO, Socorro Second US VLBI Technical Coordination Meeting Socorro 2007 / 5 / 14.
Future LBO Developments
Mark 5 / VLBA Correlator Topics
Concepts for a Next-Generation VLBA
EVLA Basic Operations Jim Ulvestad
EVLA Availability - or - When Can I Use It?
EVLA Project Peter Napier
The Development of Broadband VLBI Technologies in SHAO
VLA/VLBA INTEGRATION With appropriate outfitting, the VLA+NMA+VLBA could be one integrated instrument covering all resolutions from arcminutes to well.
JIVE UniBoard Correlator (JUC) Firmware
Monitor and Control Software
EVLA NSF Mid-Project Review System / Antenna Status
J D Romney, W F Brisken, S J Durand
EVLA NSF Mid-Project Review System / Antenna Status
EVLA Correlator New Connectivity Scheme Software Impact Sonja Vrcic
PTC Setup at VLA B. Carlson
EVLA System PDR System Overview
Rick Perley National Radio Astronomy Observatory
Shared Risk Observing Claire Chandler EVLA SSS Review, June 5, 2009
EVLA Advisory Committee Meeting
EVLA Advisory Committee Meeting System Status
Software Requirements
Gustaaf van Moorsel September 9, 2003
Software Requirements
Prototype Correlator Testing
VLBA Correlator Interfaces for VSOP-2
Shared Risk Science with the EVLA
EVLA Advisory Committee Meeting, March 19-20, 2009
UNIBOARD : VLBI APPLICATION CHARACTERIZATION
Progress on EXPreS at JBO Ralph Spencer
Arecibo Observatory VLBI Program and Plans
Prototype Correlator Tests on the Critical Path
Correlator Growth Path
EVLA Advisory Committee Meeting System Status
EVLA Construction Status
VLA EXPANSION PROJECT Correlator Issues.
EVLA Advisory Panel Mtg. System Overview
Presentation transcript:

WIDAR Correlator Options and Potential Craig Walker NRAO Socorro U.S. VLBI Technical Coordination Meeting May 14-15, 2007

WIDAR CORRELATOR 32 Stations for EVLA 8 GHz X 2 polarizations –8 IFs of 2 GHz each –Sampled at 4 Gsamp/s (wideband) or 2 GHz (narrow band) –2 (8) bit samples for wideband (narrow band) –96 Gbps per station input –Digitally filtered to 128 MHz subbands channels per baseline –Far more with recirculation Designed and built at DRAO in Canada –Paid for by Canada Smaller version being built for eMERLIN

WIDAR FOR VLBI WIDAR designed for VLBI –Option for VSI input –Can handle large delays and fringe rates 4 station cards per EVLA antenna –Each handles a polarization pair of IFs –Each station card could take data from a different station

Old Wiring Scheme In the original design, each 16 GHz EVLA input station could handle: –4 stations at 1 GHz (4 Gbps with 2 bit samples) –2 stations at 4 GHz (16 Gbps) There are 5 extra stations available for VLBI –Stations come in groups of 8 (reason for 32 instead of 27) –20 station, 1 GHz VLBI correlator –10 station, 4 GHz VLBI correlator Operation at VLA. Was very attractive when EVLA2 (NMA) proposed –Would have merged VLA/NMA/VLBA –But that proposal was rejected

New Wiring Scheme New wiring scheme saves on hardware costs –Proposed by DRAO, approved in principle. Review needed. –Stations now come in groups of 4 (could be 28, but going for 32) Multiple VLBI station inputs per EVLA station no longer works. Can’t get all baselines. Options: –Add stations at EVLA, but perhaps with fewer input IFs –Build a mini-WIDAR for the VLBA 16 stations, 4GHz (16 Gbps for 2 bit samples) –Cost in range of $250k - $500k depending on details –A few man years of software effort required above what is already being done for EVLA –Cost is less than savings from new wiring scheme, but not clear if Canada can pay for it.

WIDAR vs Software Correlator WIDAR: –Probably not available until late in EVLA project –Greater capability for the cost when turned on –Capabilities set at construction –Requires 2-4 FTE years of software development for VLBI –Biggest advantage would come with > 4Gbps eVLBI Software correlator (next talk): –Small version available soon (now) –Continuous upgrades natural –Highly flexible –Eventually will be more capable than a long-lived hardware correlator –Costs less than a 30 day disk supply, independent of bandwidth We have not explored FPGA or other options Should we “jump off the cliff” and let DRAO stop thinking about VLBI in the WIDAR?