1 DOE Independent Project Review Critical Decision-3a Long-Baseline Neutrino Facility/ Deep Underground Neutrino Experiment (LBNF/DUNE) Project DOE Executive.

Slides:



Advertisements
Similar presentations
OFFICE OF SCIENCE Kurt W. Fisher Review Committee Chair Office of Science, U.S. Department of Energy 1 Closeout Report.
Advertisements

Briefing to the Commission to Review the Effectiveness of the National Energy Laboratories (CRENEL) Joseph McBrearty, Deputy Director for Field Operations.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science OECM Limited-External Independent.
OFFICE OF SCIENCE Review of Critical Decision 2 for the Large Liquid Argon Detector for Neutron Physics (MicroBooNE) at Fermi National Accelerator Laboratory.
By Saurabh Sardesai October 2014.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting February 8-9, 2011.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
Long-Baseline Neutrino Facility LBNF Summary of FSCF Final Design Parameters Meeting at SURF, 10 Aug 2015 Elaine McCluskey, LBNF Project Manager EFIG 19.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
Challenges & Issues for SBNE Nigel S. Lockyer 4/4/14.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
LHC CMS Upgrade Project CD-1 Alternative Selection and Cost Range Steve Webster Federal Project Director August 26, 2013 CD-1 Executive Session.
Mark Reichanadter LCLS October 9-11, 2007 LCLS BCR Overview and EIR LOIs Project Progress / Status Revised Project Baseline.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
Closeout Report on the Review Committee (CD-1) for the Long Baseline Neutrino Experiment (LBNE) Project at Fermi National Accelerator Laboratory October.
OFFICE OF SCIENCE Closeout Report by the Review Committee for the LHC-CMS Detector Upgrade Project Fermi National Accelerator Laboratory August 27, 2013.
Long-Baseline Neutrino Facility LBNF LBNF/DUNE Project 29 September 2015.
News from LBNF C. J. Mossey, LBNF Project Director DUNE Collaboration Meeting - South Dakota School of Mines and Technology 19 May 2016.
Long-Baseline Neutrino Facility LBNF Far Site Conventional Facilities (FSCF) Scope and Interface Overview Tracy Lundin as borrowed from Headley & Willhite.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
Fermilab View Nigel S. Lockyer DUNE Collaboration Meeting 9/3/2015.
Long Baseline Neutrinos How we got here Nigel S. Lockyer Fermilab Open Meeting on Neutrinos 12/12/2014.
Long-Baseline Neutrino Facility LBNF LBNF/DUNE Status N. S. Lockyer
Office of Critical Decision-1 Approve Alternative Selection & Cost Range or Brief Presented by:
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
Long-Baseline Neutrino Facility LBNF Update: LBNF EVMS Implementation for CD-3a Elaine McCluskey, LBNF Project Manager Bob O’Sullivan, Project Controls.
K. Long, R. Roser, 23 July 2014 Report from the Neutrino Summit.
Long-Baseline Neutrino Facility LBNF LBNF Project C. J. Mossey, LBNF Project Director 49 th Annual Fermilab Users Meeting 16 June 2016.
Long-Baseline Neutrino Facility LBNF LBNC: Far Site Update and Planning Mike Headley LBNF Far Site Facilities Project Manager January 11, 2016.
Strategic Planning Process Erik Gottschalk Fermilab Physics Advisory Committee Meeting – June 22-25, June 2015.
Long-Baseline Neutrino Facility LBNF Update on LBNF to Long-Baseline Neutrino Committee Elaine McCluskey, LBNF Project Manager 13 June 2016.
DUNE-UK Mark Thomson University of Cambridge DUNE-UK Meeting, UCL May 15, 2015.
Challenges to get LBNF ready for Far Detector installation ASAP Elaine McCluskey ELBNF Proto-Collaboration Meeting 22 Jan 2015.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
LBNF 1 LBNF/DUNE – Construction Summary. LBNF Far Site Facilities Scope and Requirements LNG Membrane cryostat is an European technology. CERN has now.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
Office of Project Management Oversight and Assessments Office of Critical Decision-3 Approve Start of Construction or Brief Presented by:
IEFIG update Joe Lykken | iEFIG Chair ELBNF IB phone meeting | 6 March 2015.
Long-Baseline Neutrino Facility LBNF Elaine McCluskey, LBNF Project Manager Fermilab PAC Meeting 23 June 2015.
LBNE Project Scope, Cost, Schedule and International Involvement 1 Jim Strait, Fermilab LBNE Project Director P5 Meeting 3 November 2013.
Camera PDR/CD1 Planning 19 September 2008
Jim Fast Pacific Northwest National Laboratory
Jefferson Lab Overview
Project Management W. J. Foyt
Risk Identification HL-LHC Detector Upgrades Project
Capital Asset Projects executed by the
Phase 1 Tollgate Review Discussion Template
Preparations for a Lehman Review
Management Breakout: MREFC Budget Summary Victor L
By Jeff Burklo, Director
X-Ray Endstations Update
Details supporting the increase
Project Management Issues John N. Galayda, SLAC April 24, 2002
Preliminary Project Execution Plan
Department Of Energy Review Linac Coherent Light Source Project
Conventional Facilities
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

1 DOE Independent Project Review Critical Decision-3a Long-Baseline Neutrino Facility/ Deep Underground Neutrino Experiment (LBNF/DUNE) Project DOE Executive Session 12/2/2015 Pepin Carolan Federal Project Director DOE Fermi Site Office

Purpose Evaluate Project’s readiness for approval of Critical Decision CD-3a, Approve Initial Far Site Construction Address Far Site Conventional Facilities design, risks, interfaces, logistics– are these sufficiently developed? Development of cost, schedule, contingencies and plan for performance tracking– are these credible and adequate to support CD-3a scope? Evaluate sufficiency of ES&H aspects and overall effectiveness of the management organization and team 2

Project Background –May 2014, P5 Recommendations, Building for Discovery, Strategic Plan for U.S. Particle Physics in a Global Context : o new international collaboration be formed to design, execute a highly capable Long- Baseline Neutrino Facility (LBNF) hosted by the U.S o meet minimum specified requirements in beam power, detector mass and exposure with broader vision  achieve desired sensitivity to Charge-Parity (CP) violation in neutrino oscillations, study of neutrino astrophysics, nucleon decay –DOE-SC/OHEP requested FNAL to update Project design, cost/schedule, management plans to address P5 recommendations for a larger, more capable facility & detector to support an international collaboration (CD-1 Refresh) –CD-1 Refresh approved Nov. 5, 2015 Cost range of $1,260 -$1,860 M Underground siting, larger detector mass, near detector, higher power beamline FNAL to host LBNF/DUNE: first international megascience project on U.S. soil Tailoring Strategy includes CD-3a for initial far site construction prior to CD-2 3

Project Background Updated plan covers full vision of international LBNF/DUNE Project meeting P5 requirements –LBNF: A subset of the DOE LBNF/DUNE project that builds the facilities needed for the experiment, with contributions from international partners –DUNE: An international project and experiment managed by the DUNE Collaboration, which will provide the detectors following successful LHC model –DUNE-US: A subset of the DOE LBNF/DUNE project that includes DOE’s contributions to DUNE In DOE system, LBNF/DUNE is a single project with two parts: LBNF and DUNE-US (one funding profile, one Program Manager, one FPD) Most critical international agreement, with CERN, in place –CERN major partner on facility infrastructure, detector prototyping, facilitating European engagement –Strong leadership, early support from several countries for DUNE –Expect ~3-4 years to complete agreements with individual countries  informs timeline for LBNF/DUNE CD-2 4

5 LBNF/DUNE Scope Overview Far Site- SURF in Lead, SD *Facility/Infrastructure and Far Detector Near Site- Fermilab (FNAL) in Batavia, IL *Facility/Infrastructure, Neutrino Beamline and Near Detector

Project Scope- Far Site 6 LBNF Far Site Scope: –Far Site Conventional Facilities Construction: 4850L underground excavation; Infrastructure (Surface/Shaft/4850L); Surface Buildings –Cryogenic Infrastructure: Cryostats installed in caverns; Utilities/Cryo Support systems (surface and underground)  Includes international contributions Cryostat 1 Cryostat 4 Cryostat 3 Cryostat 2 Central utility cavern 2 of 4 Detector Modules LBNF Enables and Supports DUNE detector: –Comprised of a detector module installed in each Cryostat –Up to 40 kiloton mass Liquid Argon Far Detector

DOE Project Management Organization 7 DOE Project Management Executive: Franklin Orr, S-4 (CD-1, 2) Pat Dehmer, SC-1 (CD-3,4) AD-OHEP/IAC Chair: Jim Siegrist LBNF/DUNE Program Manager: Mike Procario (Deputy Bill Wisniewski) LBNF/DUNE Federal Project Director: Pepin Carolan (Deputy Adam Bihary) FNAL Director: Nigel Lockyer FNAL Deputy Directors: Joe Lykken & Chris Mossey LBNF Project Director: Chris Mossey LBNF Project Manager: Elaine McCluskey DUNE Technical Coordinator/ DUNE-US Project Director: Eric James DUNE-US Project Manager: Jolie Macier DUNE Management (Co-Spokespersons, Technical & Resource Coordinators) manages International DUNE Project with FNAL (Host Lab) Oversight Experiment-Facility Interface Group * LBNC LBNF Project Director LBNF Project Manager Project Management Executive Office of High Energy Physics Associate Director LBNF/DUNE Program Manager Fermi Site Office LBNF/DUNE Federal Project Director International Advisory Council DOE FNAL Integrated Project Team Resources Review Boards *DOE FPD serves as ex-officio EFIG member Fermi National Accelerator Laboratory Lab Director DUNE-US Project Director DUNE-US Project Manager

DOE Cost and Funding Profile 8 DOE TPC: $1,457M $1,260-$1,860 M range 34% Contingency on DOE costs to go Total Contribution to LBNF/DUNE includes: –DOE TPC + Non-DOE partner contribution (estimated in international “CORE” accounting) LBNF/DUNE WBS TitleDOE Total $K LBNF Project Project Office76,122 Far Site Facilities438,441 Near Site Facilities387,729 LBNF Direct TEC + OPC Subtotal902,292 LBNF DOE Contingency298,599 LBNF DOE Project Cost Subtotal1,200,891 DUNE-US Project Project Office28,067 Far Detector70,121 Near Detector6,126 DUNE-US Direct TEC + OPC Subtotal104,314 DUNE-US DOE Contingency44,157 DUNE-US Project Cost Subtotal148,471 LBNF/DUNE Conceptual Design107,638 Total DOE Contingency342,756 LBNF/DUNE DOE Total Project Cost (TPC)1,457,000 Fiscal Year Prior Yrs FY15FY16FY17FY18FY19FY20FY21FY22FY23FY24FY25FY26Total TEC OPC TPC

Critical Decision Schedule Critical Decision MilestoneSchedule CD-0 Approve Mission Need1/8/2010 (Actual) CD-1 Approve Alternative Selection and Cost Range12/10/2012 (Actual) CD-1 Approve Alternative Selection and Cost Range (Refresh)11/5/2015 (Actual) CD-3a Approve Initial LBNF Far Site Construction2 nd Quarter, FY2016 CD-3b Approve LBNF Near Site Preparation/Far Site Long Lead Procurement2 nd Quarter, FY2019 CD-2 Approve Performance Baseline1 st Quarter, FY2020 CD-3c Approve Start of Construction: Remaining LBNF FS, DUNE, LBNF NS1 st Quarter, FY2020 CD-4 Approve Project Completion4 th Quarter, FY months float to CD-4 (30% of remaining duration) Far Site critical path defined by early science goals and is an important driver of the Tailoring Strategy CD-3a authorizes initiation of critical path Far Site cavern excavation activities, prior to CD-2 Cavern Excavation Cryogenics Infrastructure Detector Fill & Commission Detector Install

LBNF/DUNE Summary Schedule 10 CD-1R CD-3a CD-3b CD-2/3c Early Completion CD-4 Far Site Near Site

Critical Decision-3a 11 CD-3a: Initiates critical path far site cavern excavation activities: initial construction work required, prior to baselining the LBNF/DUNE Project, to support installation of cryostats and cryogenic systems needed to start installation of two DUNE detectors, starting late 2021 Scope: pre-excavation, excavation (2 chambers+central utility), building/site infrastructure Cost: $219M base + $83M contingency= $302M If CD-3a scope started as soon as possible: –Mitigates risks and minimizes delay in providing a facility ready to accept detectors for installation –Advances start and completion of first 2 DUNE 10kt detector modules, to meet the science needs of global neutrino community –Reduces project cost due to extended management, escalation, etc. CD-2/3c: Baseline, construction start for balance (remaining LBNF Far Site, DUNE, LBNF Near Site): ~three-four year timeframe needed after CD-3a for DUNE to incorporate detector development and prototyping into design and to develop fabrication/installation plans aligned with international agreements CD-3a as planned prior to CD-2 is intended to spur international investment and ensure Facility will be ready for Detector by earliest possible date

Status Strong and well integrated project team in place –Highly experienced, knowledgeable individuals from management to support staff –LBNF-DUNE interfaces are tightly managed, maintained under configuration control; Experiment Facility Interface Group effective –FNAL/SURF partnership is solid, with well coordinated Far Site management –Suite of Project Management systems and tools in place and being used Readiness for CD-3a : –Facility requirements and scope understood and controlled; interfaces defined, reviewed and managed; design well advanced and managed –Risks identified, understood and managed  sound process in place –ES&H analysis and management plans in place and fully integrated –Procurement plans and actions progressing well (LBNF FS CM/GC RFP) –Costs, schedule and contingency well-developed and independently reviewed –EVM implementation plan in place –Director’s CD-3a review completed and recommendations addressed FNAL providing strong support, oversight; LBNC is active, constructive 12

Challenges Organizational and management complexity: international participation, multiple stakeholders and partners (SURF, CERN, DUNE collaboration)  reaching CD-3a readiness a strong test, need to sustain team over long haul Risk Management: maintaining realism in assessing, updating risks Managing final design for CD-3a scope: work with cryo and detector on open items; work with A/E and incorporate Construction Manager (CM) into process  plan and mechanisms in place Logistics planning and execution at SURF: Many players and parallel activities  off to good start, getting CM on early helps Procurement Management: wide range of procurement actions and strategies needed; must meet quality, schedule needs  experienced manager on board-- works closely with DOE; has FNAL/staff support and staffing plan ES&H Management: clear responsibilities, flow-down and understanding of requirements, hazard analysis and work controls, management and oversight Budget and funding: continuing resolutions and out-years  SC/Program working to meet request; early CD-3a retires risk, reduces escalation costs 13

CD-3 Requirements for CD-3a Scope 14 √√√√√√√√√√√√√√√√√√√√√√√√ LBNF/DUNE Project is Prepared for CD-3a