Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.

Slides:



Advertisements
Similar presentations
NPDES Phase II Permit City of St. Louis Park Annual Storm Water Informational Meeting April 16, 2009 Scott Anderson Superintendent of Utilities.
Advertisements

What is a Storm Water Utility? A storm water utility is a method of financing the administration, planning, implementation and maintenance of storm water.
Stuck in the SWMP Storm Water Management Programs: New challenges for the Transportation Community.
Implementing Committee Meeting May 15 th, 2014 New Braunfels MS4 program and the HCP 1.
What is NPDES? “National Pollutant Discharge Elimination System”
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
Upper Providence Township Stormwater Management MS4 Program.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Austin Peay State University Stormwater Program Kristen Spicer, Ph.D.
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
Ferguson Township Municipal Separate Storm Sewer System (MS4) Stormwater Management Program (Our MS4 Story) April 6, 2015 Board of Supervisors Meeting.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Regulatory Refresher The Municipal Regional Permit Kristin Kerr, P.E., QSD EOA, Inc. Municipal Maintenance Training Workshop May 23, 2013.
SLIDE 1 Sustainable Stormwater Management May 6, 2015 Blue Highways: Transportation and Stormwater Management in Virginia Ginny Snead, PE Richmond Office.
MUNICIPAL STORMWATER PERMITS Water Quality Partnership May 19, 2005.
1 Storm Water Utility City of Durand. 2 Storm Water Runoff Rainwater flows across streets, parking lots, driveways, lawns Pollutants are picked up by.
THE COST AND LEVEL OF SERVIC E PRESENTED BY: COURTNEY REICH, AICP ECOLOGICAL PLANNING GROUP Stormwater Management Programs for Local Governments.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
January 6,  INTRODUCTION  BACKGROUND  SUMMARY  QUESTIONS  SUPPLEMENTAL INFORMATION ◦ PROPOSED BUDGETS, LEVIES AND CIRCUIT BREAKER 2.
Creation of MS4 Regulations Green / Tradewater River Basin Team Henderson, Kentucky Prepared by Henderson Water Utility April 22, 2008.
Response to Comments Workshop Presented by: Eric Beck, P.E. RIDEM July 24, 2003 Developed by: Laura Stephenson, Greg Goblick, Margarita Chatterton.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
1 Stormwater Phase II Municipal Separate Storm Sewer Systems and Act 167 Doug Brennan PA DEP September, 2002.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork City of Southlake Storm Water Management Plan Christi Upton
WOOLPERT Managing NPDES Phase II Requirements on a County-Wide Basis Jared Livingston.
REGULATORY REQUIREMENTS FOR STORMWATER MANAGEMENT Coastal Stormwater Supplement Training.
Introduction to MS4 Stormwater Requirements (2009)
Local Government Assistance Phase II Storm Water Rule Erie County Department of Environment & Planning.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Overview of Montana’s Stormwater Regulatory Program.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
State of Connecticut Department of Transportation Stormwater Management Plan CONNECTICUT DEPARTMENT OF TRANSPORTATION Bureau of Policy and Planning Cynthia.
Illicit Discharge Detection and Elimination 6/4/20161 Illicit Discharge Detection and Elimination.
Phase II National Storm Water Regulations What’s in it for you?
Erosion and Sediment Control Programs at the Cities of Colleyville, Keller, Grapevine, Southlake, and Trophy Club Jimmy Brock, City of Colleyville Keith.
Mason’s Stormwater Utility Program Kathleen Wade-Dorman, P.E. City of Mason.
An Overview of our Community’s Stormwater Management Program
Kentucky Growth Readiness for Water Quality Does your water quality matter?
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Commercial, Industrial, and High-Risk Runoff 6/13/20161 Commercial, Industrial and High Risk Runoff.
Williamsburg’s Local Strategies to meet the ChesBay TMDL March 2012 Chesapeake Bay Watershed Virginia Maryland Pennsylvania New York Delaware West Virginia.
North Hennepin Community College MS4 Plan October 24, 2014.
NPDES Stormwater Rules Phase 1 implemented in 1990 –Large cities (
Briefing regarding the new State General Stormwater Pollution Control Permit.
Urban Runoff Pollution Ordinance 2017 Proposed Update
Storm Water Utility City of Durand.
Preventing and Reducing Pollution From MS4 Activities
Municipal Separate Storm Sewer System (MS4) Permit
Stormwater Management and MS4 Compliance
Advanced Environmental Management (AEM) Training Phase I
MS4 Stormwater Programs: How to make it all work!
Presentation to the Livingston City Council on the Phase II MS4 Permit
STORMWATER MANAGEMENT
Iowa Certified Construction Site Pollution Prevention Inspector
Town of Melbourne Beach
Summit County MS4.
Total Maximum Daily Load Program
Sacramento County Stormwater Quality Program
Stormwater Management Program
CLEAN WATER ACT (1972) EPA DESIGNATED TO ASSURE COMPLIANCE WITH THE ACT NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) MS4 GENERAL PERMIT ADMINISTERED.
MS4 OVERVIEW 2015.
MS4 = Municipal Separated Storm Sewer System
Sacramento County Stormwater Quality Program
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development density = Increased runoff Unfunded Federal mandates (NPDES) =Permit Requirements

Kansas Water Pollution Control General Permit 2014 Municipal Separate Storm Sewer System (MS4) Under the National Pollutant Discharge Elimination System (NPDES) New Stormwater Permit Regulations

Two Major Issues Flooding Issues Stormwater Quality Issues (Unfunded Federal Mandates)

Continue Stormwater Management Plan Update Stormwater Management Plan Maximum Extent Practicable Satisfy requirements of NEW Permit & CW Act Provisions and Compliance Parties Responsible for Compliance Modifications to BMP’s in SWP Stormwater Management Program Document Requirements (Prior 2014)

2014 MS-4 Permit 6 Minimum Control Measures Public Information and Outreach Public Involvement Illicit Discharge Detection and Elimination (IDDE) Construction Site Stormwater Runoff Control Post Construction Site Stormwater Management Pollution Prevention/Good Housekeeping for Municipalities

Public Information and Outreach Town Hall Meetings Staff Training Attended MACA meeting Provide Waste Bags for Pets in Parks

Public Involvement Big Event- High School Students pick up trash in Waterways. BPU sponsored the water festival Tree Board’s Tree Planting Program (reimburse cost of trees)

Illicit Discharge Detection and Elimination Adopted a Storm Water Ordinance Raised Manholes to eliminate Runoff entering sanitary sewer Construction Site Inspections Code Enforcement Violations or Citations

Construction Site Stormwater Runoff Control Establish Stormwater Erosion Control Permit System Barriers Concrete Wash Outs

Post Construction Inspections Controls are in place until Grass Established

Municipal Pollution Prevention/House Keeping Inlet/Manhole/Line/Culvert Cleaning Channel/Ditch/Culvert End Maintenance Street Sweeping Detention Ponds at Street Department Sediment Basins at Oxford Pointe Replace West Trunk Lines to reduce Inflow and Infiltration

Monitoring Requirements & Frequency In Stream Monitoring Main Streams Monitoring of Stormwater Flow Four Storm Events Per Monitoring Site/Year After July 1st 2014, 2 samples taken for the year. 4 Samples then Conducted in Spring and Fall for following permit years Between certain dates.

Permit Compliance Activities and Deadlines - Part IV City to select & implement a BMP to improve water quality City OWNED BMP Location Design Factors Schedule for Constructing Establish Measureable Goals of TMDL (Total Maximum Daily Loads) Mapping Requirements

Year Complete Mapping and Submit Select and Initiate Design of Appropriate BMP Start Stormwater Sampling, 2 samples after July 1 st, 2014

Year Complete Selected BMP Design Initiate Selected BMP Installations Initiate Stormwater Sampling/Monitoring 2 Spring Samples 2 Summer Samples

Year 3 & 4 – Continue with BMP Installations Outfall Monitoring

Year Complete all BMP Installation Continue Steam Outfall Monitoring Report Effectiveness of BMP & Measureable Goals

Funding Sources for Stormwater Specific Funding 3 Possible Sources: Property Tax Sales Tax Storm Water Utility

Property Tax Pro’s Based on Value Typically higher income pay more Con’s Tax Lid Current Mill Levy Approximately 8 mills to equate to $ 1 M/year No Transference Large share of Benefactors do not contribute

Sales Tax Pro’s Based on Spending Transference Con’s Current Tax Rate 9% By Law The City cannot impose >1% Money spent outside of City by residents

Storm Water Utility Pro’s Every Household Contributes Utility not a Tax All residential units pay an equal amount Bigger Burden on Industry Con’s No Transference Bigger Burden on Industry

Storm Water Rate Calculation Flat Fee Single Family Muti-Family Condominiums Mobile Homes Calculated Fee Commercial Institutional Industrial Parcel Imperv. Area=Units ERU (Square Feet)* *ERU=Equivalent Residential Unit

Next Steps Phase I Dry Turkey Creek Watershed Drainage Study Army Corps of Engineers Planning Assistance to States program 50% - 50% Cost Split Phase II Bull Creek Watershed Drainage Study Public Meetings to bring up specific Drainage Issues. Drainage hand outs available.

Thank You! City of McPherson - Public Works