Adrian Bevan UK Programme Outline: – Mechanics – Sensor Bench tests – 2012 Test beam plans.

Slides:



Advertisements
Similar presentations
STAR Pixel Detector Phase-1 testing. 22 Testing interrupted LBNL-IPHC 06/ LG Lena Weronika Szelezniak born on May 30, 2009 at 10:04 am weighing.
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
Adding electronic noise and pedestals to the CALICE simulation LCWS 19 – 23 rd April Catherine Fry (working with D Bowerman) Imperial College London.
The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
Undulator R & D Jim Clarke STFC Daresbury Laboratory, UK BAW-2 SLAC Jan 2011.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
Module mounting Ian Wilmut (RAL). Martin Gibson Martin has been developing the module mounting system at RAL for the last two years – everything we have.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
NA62 Gigatracker Working Group Meeting 2 February 2010 Massimiliano Fiorini CERN.
First Results from Cherwell, a CMOS sensor for Particle Physics By James Mylroie-Smith
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Substrate-Paddle-Base Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 Substrate- Paddle-Base Substrate Production Paddle – Base – Feet Component.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
ILC Vertex Tracker Ladder Studies At LBNL M Battaglia, D Contarato, L Greiner, D Shuman LBNL, Berkeley.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
, T. Tischler, CBM Collaboration Meeting, Split Status MVD Demonstrator: System Integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
Scintillator tile-SiPM system development for CALICE Engineering AHCAL Prototype Michael Danilov, ITEP & CALICE LCWS10 Beijing March 2010 Outline New scintillator.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
First tests of CHERWELL, a Monolithic Active Pixel Sensor. A CMOS Image Sensor (CIS) using 180 nm technology James Mylroie-Smith Queen Mary, University.
1 NIU Integrated Readout Layer Kurt Francis NICADD Northern Illinois University March 19, 2014.
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Adrian Bevan Queen Mary, University of London SVT Mechanical Support and Strip Sensors.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Diamond Radiator Fabrication and Assessment Brendan Pratt Fridah Mokaya Richard Jones University of Connecticut GlueX Collaboration Meeting, Jefferson.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Stave production.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Class A Carbon Fibre Reinforced Plastic (CFRP) Body Panels on The MG Rover SV.
Tagger microscope beam test results and readiness for construction what we learned from construction of the prototype and the parasitic beam tests in Hall.
Ladder Mount R&D T. Tsuboyama (KEK) 2 Oct T. Tsuboyama (KEK) 2 Oct
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
Peter Križan, Ljubljana September 17, 2008 SuperB PID Peter Križan University of Ljubljana and J. Stefan Institute Forward PID: - SiPM as photon detectors.
BM&N STS ladders assembly in VLHEP
Thin Diamond Radiator Fabrication for the GlueX Experiment
Analysis of LumiCal data from the 2010 testbeam
for the SPiDeR collaboration (slides from M. Stanitski, Pixel2010)
Detector building Notes of our discussion
What is Stave Carrier Frame Required to Do?
Beam test of Silicon-Tungsten Calorimeter Prototype
Charge collection studies with irradiated CMOS detectors
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
Cylinder design Ian Wilmut 10/11/11.
Development of a low material endplate for LP1 and ILD
CALICE(-UK) Status Paul Dauncey 28 Apr 2004 Paul Dauncey.
First Testbeam results
IHEP group Shashlyk activity towards TDR
2S module geometry updates Module positioning concepts
CLIC Civil Engineering Update
WG4 – Progress report R. Santoro and A. Tauro.
ScECAL+AHCAL+TCMT Combined Beam FNAL
Scintillator HCal R&D Update
Vertex Detector Overview Prototypes R&D Plans Summary.
(On Behalf of CMS Muon Group)
Imperial laser system and analysis
SVT – SuperB Workshop – Frascati Sept. 2010
Presentation transcript:

Adrian Bevan UK Programme Outline: – Mechanics – Sensor Bench tests – 2012 Test beam plans

Adrian Bevan Mechanics Filippo visited before the summer break to discuss plans to make a prototype of the interaction region by the end of – Discussion mainly focussed on the support cones and space frame assembly. – Detailed problem: Space frame – CFRP Rings, tubes, assembly jigs – alignment jigs Cones – CFRP – Faraday cage – cooling rings (with mounting buttons) Fred, John, Jag & Filippo N.B. for now we plan to use up our old stock of epoxy resin based CFRP, would want to use a more rad hard cyanite- ester resin for the real thing.

Adrian Bevan Can we increase cooling for L1/L2? Same profile from the detector point of view, larger x-sectional area for coolant. Fred

Adrian Bevan Splitting the support structure Aim to use the logical split (vertically) through the SVT) Started to think about assembly of the cones and support frame relative to parts. Can either – Fix the cooling rings and build around them (using buttons as datums). – Build up structure from the inside out (starting with cones). Fred

Adrian Bevan Working on mould design for cones: aim to co-cure copper mesh into the cone surface to provide the faraday cage in a natural way. – Have mould resin ready to machine. Aim is to finish producing mould by the end of the year. Cooling rings shown are basic model from Filippo. Co-curing copper mesh to main part of the mould shown to work well on test sample. Aim to push forward to finalise basic cone design before making mould. Fred

Adrian Bevan Prototyping space-frame Looking at various materials: Foam Core or Solid? Foam Core Advantages: Light weight, less material (possibly!) Disadvantages: Is core material rad hard? Would need to run tests. Requires extra material (pads) at fixed points due to thin walls. Requires inserts where rings fit together (as above). Edges will need to be sealed. Solid Profile Advantages: Very strong – could be lightened by machining. Good mechanical contact at fixed points. Rad hard. Disadvantages: Time consuming to build (approx 40 layers). More material (possibly!) Initial aim to try making a solid ring of CFRP to machine as required. John & Jag

Adrian Bevan Foam Core (showing additional support pads) QMUL May 2012 J.F.Morris7 CF Tube Support Support Pad John

Adrian Bevan Solid Ring CF Lay-up Strategy (alternating layers) Layer 1 Layer 2 etc Final machined profile QMUL May 2012 J.F.Morris8 John

Adrian Bevan CF Lay-up Jig QMUL May 2012 J.F.Morris9 John

Adrian Bevan Solid CF Ring QMUL May 2012 J.F.Morris10 John

Adrian Bevan In the process of making jigs for the first solid ring prototypes Will need to finish off a few parts, and coat with Teflon before we can try making some samples. May require a bit of trial and error given we need to produce relatively thick CFRP parts & want uniform curing of the material. Using Amber Composites E722 twill (200g/m 2 ) – (our stock of prepreg is past its shelf life, so it is usable for prototypes, but not for a production part) Jag

Adrian Bevan Support alignment frame Initial rough concept for discussion: – Base the support around a long silver steel bar to form central axis of the detector for assembly purposes. – Will need to mount cones accurately onto this, and build the space- frame with a combination of alignment and assembly jigs. – Ideally would like to be able to put this all under our new CMM (will be a tight fit). Fred, John, Jag

Adrian Bevan Sensor bench tests Concentrating on reference pixel tests initially – Basic functionality tests: pedestals, noise, Fe55 and LED response Gain determined from Photon Transfer Curve (PTC) Prepared laser stage scan using RAL setup. – In progress: Debugging on chip ADC "Strixel" firmware at the moment. – The following slides are based on results from the collaboration shown by James Mylroie-Smith at Pixel with James, Gianluca, Fergus + our Arachnid collaborators at Bristol, RAL and Daresbury

Adrian Bevan James Mylroie-Smith14 PTC Results PTC performed using IR illumination Results show good uniformity across the pixels Gain ≈ 0.17 ADC/e Noise ≈ 12e rms Linear full well ≈ 11500e Maximum full well ≈ 14700e Log(Signal) Log(Noise 2 ) Signal Noise 2 with James, Gianluca, Fergus + our Arachnid collaborators at Bristol, RAL and Daresbury From James' talk at Pixel 2012

Adrian Bevan Readout is performed on a column by column basis Shows common noise in columns James Mylroie-Smith15 Pedestals Pedestal Value (ADC counts) with James, Gianluca, Fergus + our Arachnid collaborators at Bristol, RAL and Daresbury From James' talk at Pixel 2012

Adrian Bevan James Mylroie-Smith16 Noise and Gain Noise and gain are uniform across the sensor Average noise value ~12 e RMS Average gain value 0.17 => 51V/e Noise from each pixel RMS Noise(e) Gain from each pixel Gain(ADCs) with James, Gianluca, Fergus + our Arachnid collaborators at Bristol, RAL and Daresbury From James' talk at Pixel 2012

Adrian Bevan At 50C the noise becomes large. Increase in noise at 20C James Mylroie-Smith17 Noise vs Temperature Temperature (C) Noise (ADCs) ZOOM Temperature (C) Pedestal Noise with James, Gianluca, Fergus + our Arachnid collaborators at Bristol, RAL and Daresbury From James' talk at Pixel 2012

Adrian Bevan Fe55 spectrum shows a sharp cut- off at Good S/N up to 150 Consistent with noise and gain from PTC James Mylroie-Smith18 55 Fe with James, Gianluca, Fergus + our Arachnid collaborators at Bristol, RAL and Daresbury Reference pixel results From James' talk at Pixel 2012

Adrian Bevan Test beam CERN test beam at T4-H6 mid-November – Clarifying dates with regard to latest schedule. – Preparing for this: will have a stack of sensors with trigger in a stand alone system to simplify the setup. – Will perform pion beam irradiation of these sensors. – RAL group leading preparations for this. Aim to have a lab based test of the setup in the coming month.

Adrian Bevan Summary Clear plan forward on the mechanical side: – Some issues are well understood, and we can start prototyping. – Others: we're starting to try out ideas to determine the best way forward. Sensor testing: – First results are now available from Cherwell. – Reference pixels are behaving as expected, and we hope to be in a position to study the other pixel types soon. – Test beam plans progressing well.