EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
SMC Plans for new SMCs for Fresca2 program J.C. Perez EUCARD-WP7-HFM Short Model Coil review 12 December 2011.
Eucard-WP7-HFM 10 th Collaboration Meeting at LASA Milano Status on SMC & RMC Models J.C Perez on behalf of SMC/RMC collaboration team.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
FReSCa2 Technical Review, 9 th June 2015, CEA Saclay FReSCa2 Technical Review June 2015 CEA Saclay J.C Perez on behalf of Fresca2 collaboration team.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
11-T Dipole Collaboration Review Cold Mass Fabrication and Tooling Procurement F. Savary, with contributions from B. Auchmann, E. Grospelier, S. Izquierdo.
NED Project P. MANIL – CEA/IRFU/SIS – Short Model Coils meeting #18 – 25/01/2008 – slide 1/18 SHORT MODEL COILS PROGRAM SMC meeting #18 Pierre MANIL CEA/IRFU/SIS.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
Eucard-WP7-HFM 9 th Collaboration Meeting at Warsaw University of Technology Status on SMC & RMC Models J.C Perez on behalf of SMC collaboration team.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) SMC E U CARD WP7 HFM S TATUS UPDATE MEETING O CTOBER 2011 J.C. Perez.
11 T Dipole Informal Coil and Assembly Readiness Review CERN September 2013 Review committee: Herman Ten Kate CERN (Chair) Fred Nobrega FNAL Davide.
HFM High Field Magnet, Engineering Design, 20/01/2011, Pierre Manil, 1/24 EuCARD-WP7-HFM ESAC Review of the dipole design Engineering Design Pierre MANIL.
Superconducting Magnet Group Superconducting magnet development for ex-situ NMR LDRD 2003 Paolo Ferracin, Scott Bartlett 03/31/2003.
GROUP C – Case study no.4 Dr. Nadezda BAGRETS (Karlsruhe Institute of Technology) Dr. Andrea CORNACCHINI (CERN EN Dept.) Mr. Miguel FERNANDES (CERN BE.
D. Smekens. 2 Coil ID  CableCu DUMMY Cu DUMMY WST DUMMY RRP 54/61 DUMMY RRP 108/127 RRP 108/127 RRP 108/127 RRP 132/169.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
ESAC R EVIEW OF THE HIGH FIELD DIPOLE DESIGN R EACTION O VEN, S PLICING AND IMPREGNATION M ARCH 2012 FOR E U CARD-WP7-HFM J.C. Perez on behalf of SMC collaboration.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Meeting 04/09/2015.
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
KEK-CEA Superconducting Magnet Co-operation Program The FJPPL workshop LAPP, Annecy-Le-Vieux (France), June LHC-3 Superconducting Magnets.
First Q4 cold mass engineering follow up meeting 16/03/2016 Q4 Status update H. Felice, M. Segreti, D. Simon and JM. Rifflet.
MQXFSD3 laminated structure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, P. Moyret.
3 rd ESAC Review, 27 th February to 1 st March 2013, CEA Saclay Fresca2 Dipole Structure Assembly J.C Perez on behalf of Fresca2 collaboration team.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
TE-MSC-MDT. FTEC Follow-Up Meeting Juan Carlos Perez TE-MSC-MDT Jose Ferradas TE-MSC-MDT 28/04/2016.
Hardware Challenges and Limitations
MQXC Nb-Ti 120mm 120T/m 2m models
TQS Overview and recent progress
11 T Dipole Integration & Plans M. Karppinen
CSP 25th November 2010 Technical agreement number 3: overview
LEP cryostat Procurement strategy and plans
ESAC Review February 2013 CEA Saclay
D2 Status The contract for the construction of the short model
The CMS magnet superconducting coil
Agenda 9:00  - Welcome ASG speaker 9:10 -  Introduction -       P.Fabbricatore 9:25 - The D2   magnets in HL-LHC   -  E. Todesco.
11T Dipole – Single Aperture 2m Model
ERMC/RMM activities May 2017
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
FCC 16 T dipole 4578 dipoles + 5 % spares : 4807 dipole magnets
J.C. Perez on behalf of SMC collaboration team J.C. Perez
Status report on MQYY (Q4)
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
Mechanical Modelling of the PSI CD1 Dipole
FRESCA2 Update on the dipole design and new calculations
Support Structure Fabrication
P. Ferracin and G. Ambrosio
the MDP High Field Dipole Demonstrator
Analytical Cost Model (16 T dipole)
Analytical Cost Model (16 T dipole)
SMC Design overview of the construction and project issues
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
Status of the PANDA Solenoid Magnet Production in BINP
MQXF updates P. Ferracin October 9th, 2014.
MQXF coil cross-section status
H. Felice, M. Segreti,, J.M. Rifflet, D. Simon
QXF schedule and milestones
Status of the PANDA Solenoid Magnet Production in BINP
Budker Institute of Nuclear Physics,
Globus-M2 will be constructed by the end of 2015
Progress on cryostat design and production
Presentation transcript:

EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez

15 Nov. 2011, A. Milanese2 Hardware for FRESCA2 In progress: aluminium alloy shell raw material components for the “dummy coil assembly” cryostat aluminium oxide insulating coating Nb 3 Sn reaction oven winding tooling (layer 3-4) components for the external splices [superconducting cable] To be done: components for the “coil pack”: islands, end shoes, wedges winding (layer 1-2)/ reaction / impregnation tooling assembly tooling cable insulation, traces and other instrumentation

15 Nov. 2011, A. Milanese3 Procurement of mechanical components All the components will be used for the real magnet, with the exception of the dummy coils, that are two blocks of Al alloy. The order for the Al alloy (AA 7175 T652) raw cylinder was placed mid Sept in France. We agreed on alloy characteristics and controls (material certificate, ultrasonic inspection, tensile test at room and cryogenic temperatures). The expected delivery is in mid Jan The procurement of the other components has been split in three lots, as follows: cold mass: half yokes, shell, keys and slipshims coil pack mock up: horizontal and vertical pads, coil mock-up axial compression system: end plate, rods, components for pre-tension at room temperature

15 Nov. 2011, A. Milanese4 Procurement of mechanical components On the basis of the call for tender, three firms are considered: cold mass: Spanish company coil pack mock up:Dutch company axial compression system: Finnish company We visited the Dutch and Spanish companies in Oct. 2011, to discuss the details of the fabrication and to evaluate their manufacturing capabilities. In both cases the feedback is positive. There is no need to visit the Finnish company. In all cases, the lead time from the placement of the order (which could be by the end of Nov. 2011, if the updated drawings are ready) to delivery is around 3 ½ - 4 months. The sum of the three orders is ≈ 150 kEUR (without the Al cylinder, which is an extra ≈ 30 kEUR).

15 Nov. 2011, A. Milanese5 FRESCA2 cryostat [from Arnaud Vande Craen, Pierre Minginette, Vladislav Benda] The conceptual design of the cryostat is finished. The engineering design is on-going, as well as the design of the cryogenic lines. The call for tenders for the components should be published at the beginning of Also in that case the lot will be probably split in several parts. By end of 2012 all the components should be delivered at CERN. The cryostat should be operational at the beginning of 2013.

15 Nov. 2011, A. Milanese6 Others The feasibility of the aluminium oxide coating for the pieces of FRESCA2 in contact with the coil is done. Our supplier gave us a quote for the plasma ceramic coating Al 2 O 3 with bondcoat, coating thickness 0.1 – 0.2 mm. The order of the Nb 3 Sn reaction oven has been signed at the end of October. It will be manufactured by a German company. The working volume has been specified as 2500 × 600 × 500 mm. It’s an argon furnace. The delivery is envisaged for end of May, beginning of June 2012 [Friedrich Lackner].

15 Nov. 2011, A. Milanese7 Study of splice layout The geometry of the Nb 3 Sn / Nb-Ti splice is being modelled in detail, as well as the Nb-Ti / Nb-Ti splices external to the magnet [Marc Timmins]

15 Nov. 2011, A. Milanese8 Thank you.