GEO Task AR-09-01B AIP-3 Kickoff Workshop Closing Plenary ESA-ESRIN Frascati, Italy March 2010.

Slides:



Advertisements
Similar presentations
GEO Task AR AIP-2 Kickoff Workshop NCAR Mesa Laboratory September 2008.
Advertisements

GEOSS Architecture Implementation Pilot Water Information Services with GEOSS Interoperability Arrangements George Percivall Open Geospatial Consortium.
GEO Task AR Architecture Implementation Pilot, Phase 2 (AIP-2) Kickoff Workshop NCAR Mesa Laboratory September 2008.
High level summary and recommendations from AIP-3 George Percivall Open Geospatial Consortium Task lead AR-09-01B ADC-16, May 2011.
Hervé CAUMONT OGC Interoperability Program Team
GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George Percivall, IN-05 Task Facilitator GEO IIB Prep Meeting January.
Successful Implementations for SBAs using GEOSS Interoperability Arrangements George Percivall The Open Geospatial Consortium Jay Pearlman, IEEE Nadine.
SIF Status to ADC Co-Chairs
Core Task Status, AR Doug Nebert September 21, 2008.
Standards and Interoperability Forum: Status, Issues & Plans GEO Architecture and Data Committee Kyoto, Japan 9 February 2009 Siri-Jodha Singh Khalsa.
GEOSS Common Infrastructure (GCI)
Slide # 1 Report to ADC AR Status Doug Nebert, POC U.S. Geological Survey.
GEOSS Community Portal Recommendations Team Report.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall Open Geospatial Consortium Task AR Point of.
GEOSS Architecture Implementation Pilot (AIP) 15 th ADC Meeting Brazil February/March 2011 George Percivall Open Geospatial Consortium Task lead AR-09-01B.
ADC Meeting ICEO Standards Working Group Steven F. Browdy, Co-Chair ADC Workshop Washington, D.C. September, 2007.
Best Practices Wiki Ruth Duerr NSIDC, IEEE Jay Pearlman, IEEE Siri Jodha Singh Khalsa, IEEE Report to ADC Committee May 21, 2008.
Best Practices Wiki Ruth Duerr NSIDC, IEEE Report to GEO Committees September, 2008.
1 SIF Interoperability Assessment Presented by Steve Browdy.
GEOSS Community Portal Recommendations GEO IIB Meeting, Frascati, Italy February 23-25, 2015 Ken McDonald/NOAA
Vision and architecture of GEOSS Information System GEOSS Design and Evolution George Percivall The Open Geospatial Consortium (OGC) GEO Task IN-05 coordinator.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall Open Geospatial Consortium GEO Task AR Point.
Slide # 1 GEO Task AR Architecture Implementation Pilot George Percivall GEO ADC Meeting, 14 & 15 May 2007.
GEOSS Architecture Implementation Pilot AIP February 2011 GeoViQua First Workshop George Percivall Open Geospatial Consortium Task Lead AR-09-01B - AIP.
AIP-2 Kickoff Workshop End-to-end use case: Discovery, access, and use with variations Doug Nebert GEOSS AIP-2 Kickoff September 2008.
ENV proposal meeting, Geneva, Sep. 24, GCI Presentation Joost van Bemmelen, ESA
SIF Status to ADC Co-Chairs Siri Jodha S. Khalsa Steve Browdy.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall September 2008.
GEOSS Common Infrastructure Internal Structure and Standards Steven F. Browdy (IEEE)
GEOSS Interoperability Workshop November 12-13, Introduction to the SIF Steven F. Browdy, IEEE
Slide # 1 GEO Task AR Architecture Implementation Pilot George Percivall GEO ADC Meeting, 28 February & 1 March 2007.
Report of the Architecture and Data Committee (ADC) R.Shibasaki (ADC, Japan)
1 ISO WAF Community Catalog Product Access Servers Registry Clearinghouse(s) GEO Portals Community Portals Users Client Apps GetCapabilities ISO
Standards and Interoperability Forum SIF Update and Status Steven F. Browdy, Chair.
Core Task Status, AR Doug Nebert September 22, 2008.
Implementing GEOSS architecture with-and-for Users George Percivall Open Geospatial Consortium Task lead AR-09-01B.
ISWG / SIF / GEOSS OOSSIW - November, 2008 GEOSS “Interoperability” Steven F. Browdy (ISWG, SIF, SCC)
GEOSS Common Infrastructure: A Practical Tour Doug Nebert U.S. Geological Survey AIP-3 Kickoff March 2010.
ISWG / SIF / GEOSS OOS - August, 2008 GEOSS Interoperability Steven F. Browdy (ISWG, SIF, SCC)
GEOSS Architecture Implementation Pilot, Phase 2 (AIP-2) George Percivall, Open Geospatial Consortium GEO Task AR-09-01b Task POC 2 February 2009.
GCI Overview Steve Browdy with input from Doug Nebert May 2012.
GEO ADC Co-Chair meeting USGS, Reston, Dec Slide # 1 AR Interface implementations for GEOSS George Percivall
GEOSS Common Infrastructure (GCI) The GEOSS Common Infrastructure allows Earth Observations users to search, access and use the data, information, tools.
GEOSS Architecture Implementation Pilot AIP-3 Engineering Use Cases Nadine Alameh & Josh Lieberman AIP-3 kickoff Frascati, Italy March
GEOSS Task AR-09-01b Architecture Implementation Pilot AIP Phase 3, (AIP-3) George Percivall Open Geospatial Consortium GEO Task AR-09-01b Task POC ADC.
OGC’s role in GEO: Results from the Architectural Implementation Pilot (AIP) George Percivall Open Geospatial Consortium GEO Task IN-05 Coordinator
Introduction to the GEOSS Registries: Components, Services, and Standards Doug Nebert U.S. Federal Geographic Data Committee June 2007.
AIP-3 Kickoff Workshop Summary Health SBA: Air Quality and Infectious Diseases Kick-off Session Leads: Stefan Falke, François MARQUES GEOSS AIP-3 Kickoff.
ESA-FAO GEOPortal STATUS & PLANS
GEOSS Component and Service Registry (CSR)
GEOSS Architecture Implementation Pilot, Phase 3 - Energy Scenario-
ESA-ESRIN Frascati, Italy March 2010
George Percivall Open Geospatial Consortium
Steve Peedell Joint Research Centre
Introduction to the GEOSS Component and Services Registry
GEO Task IN-05 Architecture Implementation Pilot, Phase 5 AIP-5 Kickoff Workshop UNEP Geneva 3-4 May 2012.
AR Doug Nebert, POC-elect GEO ADC Co-Chairs Meeting,
GEO Architecture Implementation Pilot
GEOSS Future Products Workshop Session 5 Introduction & Agenda
GEOSS Architecture Implementation Pilot, Phase 2 (AIP-2)
George Percivall September 2008
Core Task Status, AR Doug Nebert September 22, 2008.
Status Report on SIF to GEO ADC
AIP-5 Kick-off Workshop Summary 3-4 May 2012, UNEP, Geneva
Closing Plenary.
Data Sharing Guidelines
GEOSS Architecture Implementation Pilot, Phase 3 AIP-3 Initial Plans – Drought Scenario - presentation to ESIP - George Percivall, Open Geospatial Consortium.
GEOSS Future Products Workshop March 26-28, 2013 NOAA
GEOSS AIP-5 Data Sharing Working Group
Air Quality Data Systems and the GEOSS Architecture
Presentation transcript:

GEO Task AR-09-01B AIP-3 Kickoff Workshop Closing Plenary ESA-ESRIN Frascati, Italy March 2010

Closing Plenary – 12 March 2010 Start Time TopicSpeaker 2:45Reports from sessions (10 min * 4)Session leaders 3:25Refreshment Break (15 min) 3:40Reports from sessions, continued (10 min * 5 = 50 minutes) Session leaders 4:30Task Planning: communications, schedule, collaboration resources (15 min) George Percivall, Nadine Alameh, Josh Lieberman, Steve Browdy 4:45Closing (Buses at 5 pm)

AIP-3 Kickoff Parallel Sessions Disaster Management –Didier Giacobbo –Arnaud Cauchy –(Stuart Frye) Water –Brad Lee –Stefano Nativi –(Will Pozzi ) Health: AQ and Disease –Stefan Falke –François Marques Biodiversity and CC –Doug Nebert –Stefano Nativi Energy –Isabelle Blanc –(Lionel Menard) Engineering Use Cases –Nadine Alameh –Josh Lieberman Data Harmonization –Simon Cox –Giuseppe Ottavianelli –(Shelley Stover) Data Sharing Guidelines –Steve Browdy Vocabularies and Semantics –Roberto Lucchi –Masahiko Nagai –Cristiano Fugazza

GEO Task AR-09-01B AIP-3 Kickoff Workshop Session Summaries ESA-ESRIN Frascati, Italy March 2010

AIP-3 Kickoff Workshop Task Planning: Working Groups, Communications, schedule, web presences ESA-ESRIN Frascati, Italy March 2010

Project Planning topics Working Groups Communications Plan Collaboration Resources Anticipating additional participants Milestones and schedule

Working Group Leader – Responsibilities Lead the WG in achieving the objectives of GEOSS Collaborate with other AIP Participants to: –Define a plan for the WG, including deliverables and schedule –Utilize the AIP collaboration resources for WG activities –Accomplish WG deliverables in support of overall AIP plan Conduct regular telecons Report status of WG to AIP Plenary telecon

AIP-3 WG Leaders Disaster Management –Didier Giacobbo –Arnaud Cauchy –(Stuart Frye) Water –Brad Lee –Stefano Nativi –(Will Pozzi ) Health: AQ and Disease –Stefan Falke –François Marques Biodiversity and CC –Doug Nebert –Stefano Nativi Energy –Isabelle Blanc –(Lionel Menard) Engineering Use Cases –Nadine Alameh –Josh Lieberman Data Harmonization –Simon Cox –Giuseppe Ottavianelli –(Shelley Stover) Data Sharing Guidelines –Steve Browdy Vocabularies and Semantics –Roberto Lucchi –Masahiko Nagai –Cristiano Fugazza

AIP-3 Master Schedule

Communication Plan Telecons –AIP Plenary Telecon –WG Telecons list-servers –One plenary list –One list per work group Collaboration Resources

Telecon Schedule Plenary Telecons –Weekly – West – 1300 UTC – next 16 March –Monthly – East – 2200 UTC – next 7 April Working Group Telecons –Scheduled defined by WG Chairs

webex Geosec –For the plenary Ogc –25 concurrent seats –Ogc staff to set up

Lists established in AIP-2 Disasters Climate Change and Biodiversity Renewable Energy Air Quality and Health Clearinghouse, Catalogues, Registries and Metadata Access Services Workflow and Alerts Portals and Clients Test Facility

AIP-3 list-servers One plenary list –List already exists – One list per Working Group These WG Lists already exist from AIP-2 –Disasters -> reuse –Climate Change and Biodiversity -> reuse –Renewable Energy - > rename “Energy” –Air Quality and Health -> rename “Health” New lists to be identified ****

Collaborative Resources Josh Lieberman Traverse and OGC

Google Apps Combination of Google Sites, Calendar, Docs, Chat under one domain Up to 50 users in free version (working on that) Open to public view, but user accounts for creation and editing. Not necessary to create own Google accounts. possible but not enabled at this time. Sites: Calendar: Docs: Chat - user account name in GoogleTalk Mobile - specific sync and mobile application opportunities

Sites organization AIP-2 separation into scenario categories tended to produce "gated" communities Suggestion for AIP-3 is to work in functional categories, e.g.: –Registration & discovery –Access, workflow, processing, models –Client applications –Users and use cases –Scenario's and scenario development –Standards, practices, testing –Data and rights –Other Each scenario would then maintain one or more pages of links to functional elements, shared documents, telecon notes, etc.

Standards and Interoperability Forum (SIF) The goal of the SIF is to enable ever-greater degrees of interoperability among GEOSS-contributed resources through facilitation, technical analysis, advocacy and education. AIP participants can use the SIF if assistance is desired with the utilization of the SIR or Components and Services Registry (CSR). The SIF Interoperability Advisors can provide technical assistance regarding interoperability, including the proper use of standards and special arrangements needed to implement a server or client component or service. There will be SIF representatives participating in the AIP process to interact with. Online access to the SIF can be found by going to Use of the SIF is encouraged for AIP participants if guidance and assistance is desired with respect to interoperability arrangements and objectives.

Standards and Interoperability Forum (SIF) Once navigating to the SIF, assistance can be requested. The online submission process will be available starting April

Best Practices Wiki (BPW) It is a GCI component that is available to all AIP participants. It can be used to capture what GEOSS providers and users believe could be a best practice for interoperability. Contributions to the BPW need not be finished best practices: –It can be used during the AIP process to fine tune the content provided. –It is a resource for comments, contributions, development, and convergence to a best practice by an organization, community, SBA, etc. AIP participants can use the SIF for assistance with the use of the BPW or with registration of content for the BPW. –BPW can be found at –Registration is required to gain full control over contributed content. Use of the BPW is strongly encouraged for AIP participants so that future GEOSS contributors and users can benefit from their knowledge and experience regarding the implementation and use of interoperability arrangements.

Best Practices Wiki (BPW) Once navigating to the BPW, the How-To documents can be accessed as user guides.

Closing Plenary – 12 March 2010 Start Time TopicSpeaker 2:45Reports from sessions (10 min * 4)Session leaders 3:25Refreshment Break (15 min) 3:40Reports from sessions, continued (10 min * 5 = 50 minutes) Session leaders 4:30Task Planning: communications, schedule, collaboration resources (15 min) George Percivall, Nadine Alameh, Josh Lieberman, Steve Browdy 4:45Closing (Buses at 5 pm)

Thank You! Participants for an excellent Kickoff Workshop ESA for hosting the Kickoff Workshop –Pier Giorgio Marchetti OGC thanks sponsors: USGS, NASA, EC, Northrop Grumman, ERDAS AIP-3 is Underway!!