Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Richard F Boyce Injector UpdateL0-1 Accelerator 3 November L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC.
3.9GHz Coupler Cold End Robustness Study Will Couplers survive on-site and overseas shipping? D. Olis, G. Galasso, M. McGee.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
Christopher Nantista ML-SCRF Technology Meeting July 28, 2010 REPORT.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Status of 325MHz coupler S. Kazakov 11/29/ MHz coupler structure.
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
Linac R&D Update May 15, L-Band Source Consists of a LLRF system (VME/Epics based), a SNS High Voltage Converter Modulator (on loan), a Thales 2104C.
LCLS-II Power Coupler Nikolay Solyak, Ivan Gonin, Andrei Lunin C.Adolphsen - SLAC TTC meeting, March 23-27, 2014 AWLC2014, FNAL, May 12-16,
1.3GHz Input Coupler for ILC
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
LCLS-II FPC Aluminum Waveguide Box Karen Fant with work done by Chris Nantista and Ken Premo 6/24/2015.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
1 K.Jensch, D.Kostin, DESY - Cryomodule components List S1 – DESY parts DESY parts for the S1 Cavity-String.
LCLS-II Couplers and Related R&D Chris Adolphsen WWFPC, CERN June 23, 2015.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
Status of the TTF-3 RF Power Coupler Activity Andrei Lunin, Ken Premo, Tug Arkan Feb
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
LCLS-II Button-type BPM (Review) Nikolay Solyak Review, FNAL, Dec. 12, 2014.
Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Cryomodule Safety Approvals Jay Theilacker LCLS-II Production Cryomodule Final Design Review May 12-14, 2015.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
TDR guideline discussion on Cavity Integration
Cryomodule test stand at ESS site
T5.2: Harmonization - Material and Component Reference
Power coupler at DESY & for XFEL
Complementary ISTC Projects #3888, 3889p
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
6th srf collaboration lasa 13 June CAVITY interfaces - Vincent Hennion / PIERRE BOSLAND Bonjour, Franck Peauger, Je suis Ingénieur RF.
Far Detector Activities Late 2017 – Early 2018
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
The 11T cryo-assembly: summary of design and integration aspects
UK RFD Pre-Series cryomodule
Modified TTF3 Coupler Design and Related R&D for LCLS-II
V. Veshcherevich Cornell University
Main Coupler R&D at DESY
HIE-LINAC status report
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
Cryomodule design modifications for C75
SNS PPU Cryomodule Instrumentation
Cryomodule Assembly Plan
Prototype cryomodule development
Mechanical Engineering progress for the Front End Test Stand
CRYOMODULE FINAL ASSEMBLY
SNS PPU Cryomodule Thermal Shield
SNS PPU Cryomodule Vacuum Vessel
V. Veshcherevich Cornell University
Cryomodule Design for CW Operation 3.9 GHz considerations
SNS Coupler Shipping Plans
SNS PPU Cryomodule Instrumentation
SNS PPU Cryomodule Space Frame
SNS PPU Cryomodule Thermal Shield & MLI
SNS PPU Cryomodule Design Overview
CRYOMODULE FINAL ASSEMBLY
Presentation transcript:

Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design

2 Outline LCLS-II Prototype Cryomodule FDR, January 2015 Introduction Background Coupler design basis Power Coupler Design and Integration Mechanical design details Integration into cryomodule Thermal interfaces to cryomodule RF connections Coupler tuner Work status summary

Introduction 3 LCLS-II Prototype Cryomodule FDR, January 2015 Background SLAC is responsible for the power coupler order (280 total) Decisions are made by SLAC with input from partner labs SLAC has created a full set of drawings based on DESY drawings Engineering Specification Document (ESD) has been completed Interface Control Document (ICD) has been completed Procurement Readiness Review has been completed Request for Pricing (RFP) has been submitted to vendors Coupler design basis TTF3 type with some modifications Due to schedule constraints existing FNAL ILC couplers were modified for use by the project

4 Power Coupler Design and Integration LCLS-II Prototype Cryomodule FDR, January 2015 TTF3 Type power coupler based on DESY design Cold end Warm end

5 Power Coupler Design and Integration LCLS-II Prototype Cryomodule FDR, January 2015 Modifications/Design changes (from TTF3) Cold end -Antenna length shortened by 8.5mm -CF100 55K shield mounting surface (new production) Mounting surface area and bolt size increased to improve thermal contact and heat transfer to 55K shield -Design change to be incorporated for future production -Some testing remains to confirm final design (bench and HTS) -No impact to cryomodule design Prototype units may utilize “enhanced” contact area (copper sink) -Not enough time to incorporate design changes for new production cold ends, must use modified colds and maybe sink -Testing currently underway to confirm effectiveness -No impact on cryomodule design

6 Power Coupler Design and Integration LCLS-II Prototype Cryomodule FDR, January 2015 Modifications/Design changes (from TTF3) Cold end Mounting surface Shorten tip By 8.5mm

7 Power Coupler Design and Integration LCLS-II Prototype Cryomodule FDR, January 2015 Modifications/Design changes (from TTF3) Copper sink for enhanced thermal contact (if needed) OFHC copper sink SS washer

8 Power Coupler Design Overview LCLS-II Prototype Cryomodule FDR, January 2015 Modifications/Design changes (from TTF3) Warm end -Prototype cryomodules will use newly manufactured warms -Increased Cu plating thickness on inner conductor Increased from 30 micron to 150 micron to reduce bellows temperature -Additional threaded hole to be added to mount transportation support if it is required Will be added for new production runs of couplers Transportation support will be incorporated on prototype cryomodules Design details not finalized, but this will have no impact on cryomodule design

9 Power Coupler Design Overview LCLS-II Prototype Cryomodule FDR, January 2015 Modifications/Design changes (from TTF3) Warm end Increase Cu plating on Inner conductor from 30 to 150 micron Transportation support

10 Power Coupler Design and Integration LCLS-II Prototype Cryomodule FDR, January 2015 Integration into cryomodule Integration into cryomodule is the same as for CM2 Same coupler geometry as ILC and CM2 -Lengths of cold and warm sections are the same -Same flanged connections -Same installation procedure Coupler cold end connection to cavity utilizes aluminum diamond seal Warm end connection via O-ring sealed vessel flange Coupler warm end vacuum by common pumping line -TSP and Ion pump utilized for coupler warm vacuum -Coupler warm ends will each have an all metal valve (to isolate vacuum space if required for repair) -Pumps shipped with cryomodule, line under vacuum

11 Power Coupler Design and Integration LCLS-II Prototype Cryomodule FDR, January 2015 Integration into cryomodule, same geometry as CM2 55K 5K Cavity connection Pump line Vacuum flange Same geometry

12 Power Coupler Design and Integration LCLS-II Prototype Cryomodule FDR, January 2015 Integration into cryomodule Common pumping line TSP and Ion pump location

13 Power Coupler Design and Integration LCLS-II Prototype Cryomodule FDR, January 2015 Thermal interfaces to cryomodule There are two thermal interfaces to cryomodule -5K intercept on cold end bellows -55K intercept on cold end CF100 flange Location of thermal interfaces has not changed from TTF3 CW operation requires improved heat transfer away from coupler, particularly the CF100 flange -Initial configuration testing indicates heating of CF100 flange as well as the inner conductor -Interface design includes improvement to the entire heat flow from coupler to cold sink Cryomodule thermal studies currently underway at FNAL and ANL will provide input for thermal interfaces final design No impact on cryomodule design

14 Power Coupler Design and Integration LCLS-II Prototype Cryomodule FDR, January 2015 Thermal interfaces to cryomodule

15 Power Coupler Design and Integration LCLS-II Prototype Cryomodule FDR, January 2015 Thermal interfaces to cryomodule 5K intercept Interface design -Same design as used on CM2 -Interface consists of aluminum shield clamped on cold end bellows copper ring -Copper braids take heat from shield to 5K line (bolted connection) Braid design not yet complete -Design will include high quality engineered braids, as short as feasible -Connections will utilize indium for better thermal contact -Analysis will determine braid cross-section, length, etc. -These details will not impact cryomodule design

16 Power Coupler Design and Integration LCLS-II Prototype Cryomodule FDR, January 2015 Thermal interfaces to cryomodule 55K intercept Interface design -Same basic design as used on CM2 -Interface consists of aluminum shield bolted to back of CF100 flange using M6 screws -Copper braids take heat from shield to 55K outer shield (bolted connection) Braid final design specification not yet complete -Design will include high quality braids, as short as feasible -Connections will utilize indium for better thermal contact -Analysis will determine braid cross-section, length, etc. -Shield on CF100 flange may require improvement (TBD) -These details will not impact cryomodule design

17 Power Coupler Design and Integration LCLS-II Prototype Cryomodule FDR, January 2015 Thermal interfaces to cryomodule Bolted Bolted connections Aluminum shield clamped to Copper ring Braid Aluminum shield bolted to CF100

18 Power Coupler Design and Integration LCLS-II Prototype Cryomodule FDR, January 2015 RF Connections Waveguide SLAC responsible for waveguide procurement Same waveguide interface configuration as CM2 Waveguide oriented facing upwards Same waveguide mounting brackets as CM2 Waveguide drawings are currently being created by SLAC Waveguides will be procured separately from couplers This procurement will not impact cryomodule design

19 Power Coupler Design and Integration LCLS-II Prototype Cryomodule FDR, January 2015 RF Connections, waveguide Waveguide facing up Mounting bracket

20 Power Coupler Design and Integration LCLS-II Prototype Cryomodule FDR, January 2015 RF Connections Coupler pickup ports Same port locations as TTF3 type used on CM2 1 e-pickup on cold end 2 e-pickups, an 1 optical port on warm end Coupler warm ends will arrive with feedthroughs Cables will be routed through the vessel vacuum space and terminate at feedthrough flanges

21 Power Coupler Design and Integration LCLS-II Prototype Cryomodule FDR, January 2015 RF Connections, coupler pickup ports E-pickup (warm) E-pickup (cold end) E-pickup (warm) Optical port

22 Power Coupler Design and Integration LCLS-II Prototype Cryomodule FDR, January 2015 Coupler Tuner Motor Two methods for coupler tuning, manual and motorized Motorized design exists at FNAL (remotely controlled) Same as used in CM2 Current configuration is to ship with manual tuners (knob) -It is possible to retrofit the cryomodules with motorized tuners at a later date if it is deemed necessary -If future decision is to use motorized tuners, value engineering should be done to reduce cost -Decision does not impact cryomodule design Motorized tuners will be used on cryomodule test stand -After cryomodule testing, motorized tuners will be replaced with manual tuners prior to shipment

23 Power Coupler Design and Integration LCLS-II Prototype Cryomodule FDR, January 2015 Coupler Tuner Motor Limit switch Motor Position transducer

24 Work Status Summary LCLS-II Prototype Cryomodule FDR, January 2015 Coupler design 95% complete (my estimate) -ESD, ICD,RFP completed -Minor changes (if required) will not impact cryomodule design Coupler Integration into cryomodule is complete -Coupler is integrated similar to CM2, same geometry -No changes to tooling, installation procedure Thermal Interfaces not fully completed -Mounting locations are set -Braid design will be finalized after testing and analysis completed -Some minor design details may be required for 55K shields -Final design details will not impact cryomodule design RF connections are set -SLAC responsible for waveguide, no impact on cryomodule design -Pick ups are the same as CM2, design is complete Tuner motor design is complete, to be used on test stand only