WP3 Quality Assurance Rosario Principe Richard Berthet, Olivier Housiaux, Sabine Menu, Paula Alvarez Lopez International Review of the Inner Triplet Quadrupoles.

Slides:



Advertisements
Similar presentations
PRINCIPLES OF A CALIBRATION MANAGEMENT SYSTEM
Advertisements

SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
The ISO 9002 Quality Assurance Management System
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
Quality Assurance/Quality Control Policy
World Health Organization
External Defibrillators: Recalls, Inspections, and the Quality System Regulation Melissa Torres Office of Compliance December 15, 2010.
ISO 9000 Certification ISO 9001 and ISO
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Objectives 4 Understand the ISO standards. Why are standards required? 4 Need standards to ensure that a term means the same for all 4 Need company standards.
Software Engineering 2003 Jyrki Nummenmaa 1 SOFTWARE ENGINEERING SOFTWARE QUALITY Today we talk about software process quality and certification.
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
From Research Prototype to Production
MATTHEW MATKOVICH MINE EQUIPMENT COMPLIANCE SPECIALIST QUALITY ASSURANCE & MATERIALS TESTING DIVISION MSHA – APPROVAL & CERTIFICATION CENTER 30CFR, PART.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
HL-LHC Project Kick-off Meeting Friday 15 th April 2011 Sylvain Weisz DG-DI-DAT on the behalf of the A&T Sector Projects Support Office.
Important informations
HL-LHC Configuration Management Keywords : HW Baseline, Naming, Parameters, Layout DB, Change Control The HiLumi LHC Design Study (a sub-system of HL-LHC)
Hazards Identification and Risk Assessment
4.3 Document control 4.4 Review of requests, tenders and contracts
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
Quality assurance of the QXF- Q2 Nb 3 Sn cable mass production C. Scheuerlein, 6 November 2014 HL-LHC/LARP International Review of the Superconducting.
30/02/2008 Dept. of Pharmaceutics 1 Salient Features of Quality Assurance Dr. Basavaraj K. Nanjwade M.Pharm., Ph.D Associate Professor Department of Pharmaceutics.
1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
MTF - Travellers 28/2/2001 S. Mallon + P. Martel EDMS Doc Id Contents Problem and scope Timing of MTF usage Definition of a standard MTF Creation.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
Review of the processes released in the framework of the MMP Goran Perinić.
Quality Assurance Overview Ranko Ostojic 12 Nov 2012.
1 Quality Assurance Working Group Membership and functioning described in the document LHC-PM-QA "Quality Assurance Policy and Project Organization”.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
1 SMA/November 2007 ISO/IEC 17025: International Organization for Standardization.
Laboratory equipment Dr. W. Huisman Cairo, November 21th 2012.
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
11T Quality Assurance O. Housiaux, R. Berthet, S. Menu, R. Principe 3rd International Review on the 11T dipoles at collimator Section for the HL-LHC 6-8.
Chapter 25 – Configuration Management 1Chapter 25 Configuration management.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer International Review of the Inner Triplet Quadrupoles (MQXF) for HL-LHC.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
CONFIGURATION MANAGEMENT AND CONTROL PLAN ESS Quality Assurance and Control workshop (30June) V. HENNION.
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.

Cryogenic safety organisation at CERN
East Area Renovation Project Team meeting # 2 – EDMS News
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
Crab Cavities Contribution from the U.S.
Document Plan & Milestones WP7
4.5 Checking and Corrective Action Monitoring and Measurement
ISO 9001 Awareness Training.
Setting up an Internal Audit Program
Works and Services Supervisor
Nonconformance Tracking
International Organization
Quality Measurable characteristic Cyclomatic complexity Cohesion
First Article Inspection
E. Manola-Poggioli 05 December 2001 EDMS doc
ESSI CHANGE AND nonconformity control SYSTEM
DOE Review of the LCLS Project October 2006
DOE Review of the LCLS Project 7-9 February 2006
HL-LHC Quality management
Presentation transcript:

WP3 Quality Assurance Rosario Principe Richard Berthet, Olivier Housiaux, Sabine Menu, Paula Alvarez Lopez International Review of the Inner Triplet Quadrupoles (MQXF) for HL-LHC June 2016

O UTLINE  QA for MQXF  Documentation management and EDMS  Procedures  Drawings  Quality Control and traceability and MTF  Non conformities management  Procurement  Conclusions

M ANDATE  In collaboration with the MQXF Technical Responsibles, draft and edit the procedures  Collect, classify and distribute for info/approval the technical documentation provided by the WP3 stakeholders  Write the related follow-up files needed to monitor the WP3 activities  In field quality control and audit the operation compliance (MIP)  Process, analyse and archive data collected during operations  Traceability of operations (MTF)  Manage the non-conformity reports  Monitor and archive the WP3 documentation

E XPERIENCE AND S ENSITIVE P OINTS  Experience  WP11 quality management  LS1 project, MSC-LMF magnet repair  Literature  Hilumi Quality Assurance Plan  LHC Quality Assurance Plan  Quality Management for the Accelerators & Technology Sector (Hardware baseline)  Sensitive Points  Documentation Management  Interface management  Manufacturing and Inspection Plan (MIP)  Design and drawings  Procurement  Communication (project complexity, collaborations)

D OCUMENTATION M ANAGEMENT  One way to Quality within WP3  Documentation managed and named after the procedure LHC-LBH-QA-0005LHC-LBH-QA-0005  LHC Quality Assurance Plan  Hilumi Quality Assurance Plan  International standards (ISO 9001)  Regular meetings with QAC and Hilumi PLO representatives  Document redaction process:  Redaction of the documents by the technical responsible in collaboration with the Quality service  Document classified and circulated for approval by the Quality service

M AITRISE D OCUMENTAIRE

D OCUMENTATION M ANAGEMENT  One way to Quality within WP3  Documentation managed and named after the procedure LHC-LBH-QA-0005LHC-LBH-QA-0005  LHC Quality Assurance Plan  Hilumi Quality Assurance Plan  International standards (ISO 9001)  Regular meetings with QAC and Hilumi PLO representatives  Document redaction process:  Redaction of the documents by the technical responsible in collaboration with the Quality service  Document classified and circulated for approval by the Quality service

D OCUMENTATION M ANAGEMENT  Document adressed via to  Or call the Quality service at ( )  Other available numbers:  Sabine Menu (163528)  Richard Berthet (166884)  Olivier Housiaux (165300)  The Quality Team to ensure that :  The document is named according the HL-LHC QAP and QAC  Available within WP3 + HL-LHC + Hardware Baseline  Validation process respected  To the Quality Service to launch the approval process in accordance with the document type and/or the equipment code based on the LHC procedure «Equipment Naming Conventions» and naming portal CERN.Equipment Naming Conventionsnaming portal CERN

D OCUMENTATION M ANAGEMENT  WP3 documents available in EDMS ( Engineering & Equipment Data Management Service )  HiLumi: CERN  HL-LHC Item catalogue: HCLQXFC001  Once validated, documentation also available in:  LHC Hardware baseline  Validation circuit (as discussed with Hilumi PLO):  Engineering Check: technical responsibles + other stakeholders if needed  Approval : 1.Impact on WP3 uniquely  WP3 2.Impact outside WP3  HL-LHC PLO

H I L UMI : CERN

I TEM CATALOGUE : HCLQXFC001

 Write and edit the QAP/QAM and all procedures for WP3 in collaboration with the technical responsibles  Collect and archive and distribute all procedures edited in collaboration with:  CEA  INFN  KEK  LARP  CIEMAT P ROCEDURES

 HL-LHC quality requirements: first info to collaborations  First training for the use of common tools and explore other used systems  Have a Quality System accessible and/or compatible with the project and CERN standards  Example from LARP experience C OLLABORATIONS

LBNL AND F ERMILAB  Objectives:  To provide an overview of the HL-LHC Quality Management System and Documentation Management Policy  To present and train the collaborations in the use of CERN documentation tools, especially EDMS and MTF  Two 1.5 day long sessions held at Berkeley (May 23 rd -24 th ) and Fermilab (May 25 th -26 th ), with video attendance from BNL  Sessions attended by ~25 people (project engineers, technicians, and QA teams)  Indico events , Paula Alvarez Lopez

From ABS, Vector Traveler, Manufacturing Procedures… Paula Alvarez Lopez

D RAWINGS  Drawings provided at CERN by Project Engineer + Design Office  Today the drawings always double-controlled :  Control 1 by the Design Office  Control 2 by the Project Engineer  In some cases a larger approval circuit is required:  To be sure dwgs interface correctly with:  Other equipment families within WP3  Other work packages within Hilumi project  Other LHC stakeholders (transport, vacuum, et…)

D RAWINGS VALIDATION CIRCUIT (D RAWING AND 3D M ODEL M ANAGEMENT AND C ONTROL, LHC-PM-QA-305)LHC-PM-QA-305

Q UALITY CONTROL  Manufacturing flowcharts  Manufacturing and inspection Plans  Fabrication Procedures  Follow-up files  Control Procedures In field quality control of any single production step

M ANUFACTURING F LOWCHART Example: Coil Manufacturing Flowchart

M ANUFACTURING AND I NSPECTION P LAN (MIP)

M ANUFACTURING AND I NSPECTION P LAN Documentation traceability Validation Operation : Internal layer winding Control Reports Follow-up file

F OLLOW - UP FILES

F OLLOW - UP FILES

F ABRICATION P ROCEDURES Naming and traceability Validation Process

F ABRICATION P ROCEDURES Traceability of modifications

F ABRICATION P ROCEDURES References (Follow up files, MIP, Flowchart…) Drawings

F ABRICATION P ROCEDURES Quality instructions. Manufacturing instructions

C ONTROL PROCEDURES Control  Each control step can be found in the related Control Procedure  Inspection in field  Documentation  Traceability Control procedure

C ONTROL PROCEDURES Quality control

C ONTROL PROCEDURES Documentation check

C ONTROL PROCEDURES Traceability in MTF

F OLLOW - UP OF THE WP3 A CTIVITIES  Follow-up in the Manufacturing and Test Folder (MTF)  CERN developped an interface which provides  Traceability of the sub-equipments installed in the magnets,  Traceability of the operations,  Retrieval of all documentation, reports, test results…  Easy access to critical data (possibilities of reporting),  Non conformity report management.

F OLLOW - UP IN MTF

E ASE THE ACCESS TO CRITICAL DATA

O PERATION TRACEABILITY Operation traceability Reporting Non conformity

I NFO IN MTF ( POLYMERIZATION CYCLE )

A NNOTATED PROCEDURES

N ON CONFORMITY MANAGEMENT 1. As soon as a Non-Conformity (NC) is detected:  By technicians during manufacturing  During Quality Control 2.A NC Report is opened by  the QA responsible and the Technical Responsible 3.The Technical Responsible and the QA resp. define a.The proposed action to be taken in order to fix the non conformity, b.The proposed corrective action to be implemented in order to eliminate the causes of the Non Conformity, c.The criticity of the non conformity (Critical / non critical).

N ON CONFORMITY MANAGEMENT  The QA resp and Technical Resp. define the Criticity level  Critical : according to LHC procedure Handling of Nonconforming Equipment (LHC-PM-QA-310): ”All nonconformities that may have an  impact on the equipment performance, durability, interchangeability,  interface to other LHC systems,  health or safety are categorised as critical nonconformities”.  In the HL-LHC project: ”Interface to other HL-LHC Work Package”.  Non Critical : according to LHC procedure Handling of Nonconforming Equipment (LHC-PM-QA-310): ”All nonconformities that are not evaluated to be critical as defined above are categorised as noncritical nonconformities”.

N ON CONFORMITY MANAGEMENT  Once all the parameters are set, the QA Responsible and the Technical Responsible define the list of persons who should be involved in the validation of the non conformity (LHC systems, HL-LHC work packages and HL-LHC Project Leader Office).  Once all the parameters are set, the non-conformity’s life cycle follows the process define in the LHC procedure «Non Conformities Reporting » (LHC-PM- QA-0611).

P ROCUREMENT The Procurement must comply with the rules defined by the CERN’s IPT.

P ROCUREMENT  Reception and acceptance  Acceptance by the Technical Responsibles:  In collaboration with the Logistic Service (storage),  And with the Quality Service (traceability).  Controls to be performed before acceptance:  Visual inspection (Logistic + Technical Responsible)  Documentation control (Quality + Technical Responsible)  Acceptance Sampling

P ROCUREMENT Traceability in MTF MTF = Manufacturing and Test Folder Manufacturing information Formal acceptance by the Technical Responsible

C ONCLUSION  QA/QC must be rigorous and systematic  QA team to provide 100% of the required documents  A number of procedures to be provided for WP3 (200…300?)  + Follow-up files, Fabrication and Test reports, MIPs, et.  WHEN THEY ARE NEEDED  Continuous improvement and upgrade of QA  Feed-back for the production  presence in field  Adapt immediately the documents to the working methods  Implementation of the MIP and Follow-up files  MTF (info and documents)  Share the info and communicate  Take over the ownership of the QA system  Shared attitude within the project  Be sure of a QA team COMPETENT and AVAILABLE when needed  Establish CLEAR INTERFACE with the collaborations

Thank you

H ARDWARE BASELINE

N ON CONFORMITY MANAGEMENT