Alignment Work for June 03, 2013 - June 07, 2013 Assignment Days Contact Task ManagerStarting DateEnding DateCrew Assigned Main Injector4.0 Days Work for.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

The Preassembling Installation Survey & Alignment Accelerator Center of IHEP Qu Huamin 2006 / 4 / 27.
Elvin Harms, Tom Peterson, Yuriy Orlov, Frank McConoloque.
Electron Cooling in the Accumulator McGinnis Electron Cooling in the Accumulator Dave McGinnis.
Progress and Plan for Superconducting RF Cavity RF Group.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
The Tevatron Decommissioning Plans AEM 10/17/11 Paul C. Czarapata.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Introspection Control System Group – Bob Dalesio presenting EPICS Meeting May 2, 2009.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
LCLS-II cryomodule alignment. 2 Wednesday meeting, 6/17/2015 Topics Alignment of Components inside the CM Tunnel Network Tolerances LCLS-II cryomodule.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
Refurbished Booster RF John Reid October 24, 2012.
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
TD Help for Shutdown 2012 Preliminary, will be updated April 18, 2012.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
Agenda – Basics of cavity integration into CAST Introduction (M Davenport) Information exchange 2016 – Vacuum in cold bore – 2 cavities Cooling RF Cavities.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
SY120 to the Meson Test Facility (and KTeV?) - Chuck Brown – 23Feb04 – June/08 P2 P1 MI52 MCenter MTest 3 km beam line from MI52 to MT6 and MC7 2.5 km.
2/17/2016 Recycler -Gattuso Recycler Shut Down Status  Flying Wire Status  Wire Vacuum Certified  Tunnel Bake Prep status Disconnection of BPM, Correctors,
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Overview of Main Linac Cryomodule (MLC) Yun HE MLC Internal Review 9/5/2012Yun HE, MLC Internal Review1.
NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms.
CM2 Repair Status 8/13/2012 Tug Arkan 1. Latest Status After the warm end couplers were disassembled, it was decided to disassemble all the lower aluminum.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Cryomodule Assembly Facility (CAF) at Fermilab Tug Arkan (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
FNAL Cryomodule Assembly and Installation Plans Tug Arkan May 22, 2015.
Muon Long Term Schedule August 15, µ Points to discuss What is the schedule What is the schedule Shutdown schedules Shutdown schedules How do we.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Alignment Work for June 17, June 21, 2013 Assignment Days Contact Task ManagerStarting DateEnding DateCrew Assigned Main Injector4.0 Days Beam pipe.
Maximum Credible Beam Loss in the Main Injector D. Capista January 26, 2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Alignment Work Completed for 10/29 – 11/02 Main Injector 6 Days Contact Task ManagerStarting DateEnding DateCrew Assigned Layout of 30 Sector As per new.
Work in the Tevatron A0 D0 B0 C0 E0 F0 Separators A49 Separator B48 TEL 2 installation A0 Xtal Collimator 1.5 m collimator A48 Shimming 6 magnets/day At.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
MI/RR Shutdown 2012 Dec Gev Lines/Injection region: Staging equipment, cleaning and prepping new part to start vacuum work. Preparing to modify the.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
6832 –7.00 Proper use of tools Handle Files should have a ______ to prevent hand injuries.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
ASTA Latest Update E. Harms April Photoelectrons first produced at ASTA on 20 June 2013 –Molybdenum (uncoated) cathode ‘Routine’ Electron operation.
650MHz-Cryomodule for CEPC
PETRA III, Status and Upgrade
Completion of the MICE-US construction project
CERN – Zanon discussions
BA6 – crab cavity activities in EYETS
Helium spill in LHC tunnel
LARP Vertical Test Facility
XFEL Vacuum System Commissioning
KEK injector cryomodule
Global Winds Plate Project (2 Days)
TTC Hot Topic Common Questions
Overview of Alignment Engineering Group Downtime Activities
Cryomodule Assembly Plan
CEPC-650MHz Cavity Cryomodule
CRYOMODULE FINAL ASSEMBLY
Installation Status & Operational Readiness Process
SC1R Cold Box PDR Assembly Sequence
Polarized 3He target installation
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

Alignment Work for June 03, June 07, 2013 Assignment Days Contact Task ManagerStarting DateEnding DateCrew Assigned Main Injector4.0 Days Work for Cons ? 4 Days Cons Gattuso X6331 Babatunde OshinowoMay 27, 2013May 30, 2013Chuck Wilson, Crutcher, Teafoe Beam pipe alignment of Recycler line. Cons Gattuso X6331 Babatunde OshinowoMay 27, 2013May 30, 2013 Craig Bradford, Randy Wyatt, Mike O’Boyle Completed with Sink Hole repair at MI31/MI39. Backfill has been completed and graded in this area. We would like the filled area to be checked to see if more fill/grading needs to be added anyplace on this berm before we mat and seed. Cons Gattuso X6331 Babatunde OshinowoMay 27, 2013May 30, 2013 Craig Bradford, Randy Wyatt, Mike O’Boyle Measured site riser plug extension for concentricity with original plug. Found 0.107" off at bottom. M. Frett will try to repair and we will return in the a.m. to check. Completed alignment of differential pumping sections at 341 and 401. Set 341 as close as possible with upstream under vacuum. Will need bracket or vacuum let up to set closer " pipe is within 1/4" with no way to adjust, no stand, no bellows. D0/TPC 2.0 Days Virgil BoceanMay 27, 2013May 30, 2013Chuck Wilson, Crutcher, Teafoe Upon gaining beneficial occupancy of the new LArTF building, we would like your group to come in and mark the positions on the floor of the H-size shielding blocks and also to mark the positions of all of the equipment 2 DaysVirgil BoceanMay 27, 2013May 30, 2013Chuck Wilson, Crutcher, Teafoe NML2.0 Days May 27, 2013May 30, 2013 Perform survey checks of the coupler, gate valve, RF Gun, cavity and check against the table's alignment. (There has been work completed around and on the RF Gun since it's alignment and this would let us know if anything has moved).1.5Virgil BoceanMay 27, 2013May 30, 2013Chuck Wilson, Crutcher, Teafoe Completed the as-found of STSS002,STSS001, SRF-GUN2, and the 9WayCross Table. This should complete the as-found of all components in this enclosure. On Going Completed On Going Completed All as found data collection Completed

Alignment Work for June 10, June 14, 2013 Assignment Days Contact Task ManagerStarting DateEnding DateCrew Assigned Main Injector4.0 Days Work for Cons ? 4 Days Cons Gattuso X6331 Babatunde OshinowoJune 10, 2013June 14, 2013Chuck Wilson, Crutcher, Teafoe Beam pipe alignment of Recycler line. Cons Gattuso X6331 Babatunde OshinowoJune 10, 2013June 14, 2013 Craig Bradford, Randy Wyatt, Mike O’Boyle 8Gev line RR102 to 103 beam pipe alignment (Ready Tuesday) MI beam pipe upstream of Injection Lambertson Main injector RF Beam pipe alignment/ as-found between BV607 and BV608 ( Ready Wednesday) Kickers at 307 (Ready Tuesday) MI beam pipe ready (partially ready Thursday) RR30 straight section Kickers at 307 (Wednesday) Recycler Transfer line (Tuesday) Recycler beam pipe and components from Q (ready Tuesday) Multi wires in transfer line 905,904,903 and 902 (ready Thursday) RR40 Differential pump sections 341 (ready Tuesday) Differential pump sections 341 and 401 beam pipe alignment (ready Wednesday) Two quads will in the section will need to move to insert pipe, once the pipe is inserted we’ll need to have them aligned. Cons Gattuso X6331 Babatunde OshinowoJune 10, 2013June 14, 2013 Craig Bradford, Randy Wyatt, Mike O’Boyle

Alignment Work for June 10, June 14, 2013 Assignment Days Contact Task ManagerStarting DateEnding DateCrew Assigned D0/TPC 2.0 Days Virgil BoceanMay 27, 2013May 30, 2013Chuck Wilson, Crutcher, Teafoe Upon gaining beneficial occupancy of the new LArTF building, we would like your group to come in and mark the positions on the floor of the H-size shielding blocks and also to mark the positions of all of the equipment 2 DaysVirgil BoceanJune 10, 2013June 14, 2013Chuck Wilson, Crutcher, Teafoe NML2.0 Days June 10, 2013June 14, 2013 Perform survey checks of the coupler, gate valve, RF Gun, cavity and check against the table's alignment. (There has been work completed around and on the RF Gun since it's alignment and this would let us know if anything has moved).1.5Virgil BoceanJune 10, 2013June 14, 2013Chuck Wilson, Crutcher, Teafoe NOVA2.0 Days June 10, 2013June 14, 2013 Measure the height of movable access platform (MAP): bottom of MAP to secondary containment membrane on the floor at 5 locations where the MAP corresponds to the 5 catwalk support columns. See O'Sheg Oshinowfor details. June 10, 2013June 14, 2013 MP91.0 Days June 10, 2013June 14, 2013 Fiducialize and reference the CC1 cavity TB9RI029 and cold mass before insertion into CC1 vessel at MP9.June 10, 2013June 14, 2013 Align the CC1 cavity TB9RI029 and cold mass into the CC1 vacuum vessel at MP9.June 10, 2013June 14, 2013